Dormitory
29 WASHINGTON SQUARE W
MANHATTAN · BIN 1008892
💬 Discuss this project
1927Year Built
15Stories
H8Building Class
R7-2Zoning
128,601 sfGross Floor Area
68Units
LL97 CoveredRent Stabilized8 Open Violations ▸FISP: SWARMP
Dormitory · Owner of record: NEW YORK UNIVERSITY · 11,400 sf lot · 11.28 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Penthouse36p · 3 filings · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK UNIVERSITY13607/08/2026
THE OWNER OF103/22/2026
AXION REAL ESTATE MGMT303/22/2026
AXION ESTATE MANAGEMEN103/22/2026
STEGIA CONSTRUCTION CORP.103/22/2026
NYU OFFICE OF CONSTRUCTION MGMT303/21/2026
NYU303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STAGEBERG ARCHITECTURE PLLC903/27/2026
POLISE CONSULTING ENGINEER103/13/2025
LPE ENGINEERING, PC401/15/2025
HC PEC207/22/2024
POLISE CONSULTING ENGINEERS DPC403/15/2024
KZ ENGINEERING, P.C108/29/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.2003/21/2026
BURNHAM NATIONWIDE INC1403/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BROSNA CONSTRUCTION CORPOGeneral Contractor707/08/2026
HUDSON PLMBING & MCH, LLCPlumbing307/08/2026
NYCAN BUILDERS LLCGeneral Contractor303/21/2026
EDIFICE DESIGN INCGeneral Contractor307/08/2026
MAC FELDER INCPlumbing207/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor203/21/2026
RICHARD MILLWATERElectrical103/21/2026
MICHAEL DISCENZAElectrical103/21/2026
JOHN MANNINOElectrical103/21/2026
PJP INSTALLERS INCGeneral Contractor107/08/2026
ENNELL GRP ELECTRIC CORPElectrical103/22/2026
DISCENZA, MICHAELElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SKYLINE ENGINEERING, PLLC2671503/27/2026
FENAGH, INC6942303/18/2025
Building Lifecycle
All (159)Filed (21)Permit Issued (16)Signed Off (9)Facade (FISP) (13)Violation (60)Inspection (10)Special Inspection (30)
07/28/2026
Signed off — Alteration
Plumbing modifications to existing apartments # 12 A, 14B and 16EF as per plans
M01169581-I1
07/23/2026
Signed off — Alteration
Plumbing modifications to existing apartments # 12 A, 14B and 16EF as per plans
M01169581-S1
04/28/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/20/2026
Permit issued — Plumbing
M01169581-S1-PL
03/27/2026
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION OF EXISTING PENTHOUSE APARTMENT. REMOVAL AND INSTALLATION OF PARTITION, DOORS, WALLS, FLOORS, MILLWORK AS PER PLAN
M08012630-P4
03/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
03/26/2026
Special inspection requirement — Final
Matthew Wavro
03/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
Matthew Wavro
03/24/2026
Signed off — Alteration
Filing herewith subsequent application for installation of concrete slab above existing roof deck as indicated on plans.
M00940822-I1
02/02/2026
Signed off — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION OF EXISTING APARTMENT 12C. REMOVAL AND INSTALLATION OF PARTITION, DOORS, WALLS, FLOORS, MILLWORK AS PER PLAN
M00782191-I1
02/02/2026
Signed off — Alteration
M08012617-I1
08/14/2025
Signed off — Alteration
Filing herewith subsequent application for installation of concrete slab above existing roof deck as indicated on plans.
M00940822-S1
07/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/09/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/22/2025
Permit issued — Plumbing
M01169581-S1-PL
04/08/2025
Permit issued — General Construction
M01169581-I1-GC
03/20/2025
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
03/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
AILANTO DANIEL MINAWI
03/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AILANTO DANIEL MINAWI
03/20/2025
Special inspection requirement — Energy Code Compliance Inspections
AILANTO DANIEL MINAWI
03/20/2025
Special inspection requirement — Lighting controls
AILANTO DANIEL MINAWI
03/20/2025
Special inspection requirement — Lighting in dwelling units
AILANTO DANIEL MINAWI
03/20/2025
Special inspection requirement — Interior lighting power
AILANTO DANIEL MINAWI
03/20/2025
Special inspection requirement — Final
AILANTO DANIEL MINAWI
03/18/2025
Filed — Alteration
Plumbing modifications to existing apartments # 12 A, 14B and 16EF as per plans
M01169581-P1
03/13/2025
Filed — Alteration
Plumbing modifications to existing apartments # 12 A, 14B and 16EF as per plans
M01169581-I1
03/13/2025
Filed — Alteration
Plumbing modifications to existing apartments # 12 A, 14B and 16EF as per plans
M01169581-S1
01/16/2025
Special inspection requirement — Masonry
Matthew Wavro
01/16/2025
Special inspection requirement — Concrete - Cast-In-Place
Matthew Wavro
01/16/2025
Special inspection requirement — Structural Steel - Details
Matthew Wavro
01/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
Matthew Wavro
01/16/2025
Special inspection requirement — Post-installed Anchors
Matthew Wavro
01/16/2025
Special inspection requirement — Final
Matthew Wavro
01/16/2025
Special inspection requirement — Structural Steel - Welding
Matthew Wavro
01/16/2025
Special inspection requirement — Sprayed fire-resistant materials
Matthew Wavro
01/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Matthew Wavro
01/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
01/15/2025
Filed — Alteration
Filing herewith subsequent application for installation of concrete slab above existing roof deck as indicated on plans.
M00940822-P2
01/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
01/13/2025
Special inspection requirement — Concrete - Cast-In-Place
Matthew Wavro
01/13/2025
Special inspection requirement — Final
Matthew Wavro
01/13/2025
Special inspection requirement — Tenant Protection Plan Compliance
Matthew Wavro
01/13/2025
Special inspection requirement — Structural Steel - Welding
Matthew Wavro
01/13/2025
Special inspection requirement — Structural Steel - Details
Matthew Wavro
01/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Matthew Wavro
01/13/2025
Special inspection requirement — Sprayed fire-resistant materials
Matthew Wavro
12/18/2024
Signed off — Alteration
M01071813-I1
11/14/2024
Violation issued (ECB, closed)
Construction
10/02/2024
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION OF EXISTING PENTHOUSE APARTMENT. REMOVAL AND INSTALLATION OF PARTITION, DOORS, WALLS, FLOORS, MILLWORK AS PER PLAN
M08012630-P3
08/12/2024
Permit issued — Structural
M00940822-S1-ST
08/08/2024
Permit issued — General Construction
M00940822-I1-GC
07/25/2024
Filed — Alteration
Filing herewith subsequent application for installation of concrete slab above existing roof deck as indicated on plans.
M00940822-P1
07/22/2024
Filed — Alteration
M01071813-P1
07/01/2024
Filed — Alteration
Filing herewith subsequent application for installation of concrete slab above existing roof deck as indicated on plans.
M00940822-S1
06/26/2024
Permit issued — Sidewalk Shed
M01071813-I1-SH
06/25/2024
Filed — Alteration
M01071813-I1
06/10/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
Latest 60 of 159 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMAC FELDER INC04/20/2026
DOB NOWPlumbingSigned-offMAC FELDER INC04/22/2025
DOB NOWGeneral ConstructionSigned-offNYCAN BUILDERS LLC04/08/2025
DOB NOWStructuralSigned-offEDIFICE DESIGN INC08/12/2024
DOB NOWGeneral ConstructionSigned-offEDIFICE DESIGN INC08/08/2024
DOB NOWSidewalk ShedSigned-offPJP INSTALLERS INC06/26/2024
DOB NOWGeneral ConstructionSigned-offBROSNA CONSTRUCTION CORPO10/06/2023
DOB NOWGeneral ConstructionSigned-offBROSNA CONSTRUCTION CORPO10/06/2023
DOB NOWSupported ScaffoldSigned-offARSENAL SCAFFOLD INC08/29/2023
DOB NOWGeneral ConstructionPermit IssuedBROSNA CONSTRUCTION CORPO08/07/2023
DOB NOWGeneral ConstructionPermit IssuedBROSNA CONSTRUCTION CORPO02/02/2023
DOB NOWPlumbingPermit IssuedHUDSON PLMBING & MCH, LLC02/02/2023
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC02/02/2023
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC01/30/2023
DOB NOWGeneral ConstructionSigned-offBROSNA CONSTRUCTION CORPO01/24/2023
DOB NOWGeneral ConstructionSigned-offBROSNA CONSTRUCTION CORPO01/24/2023
BISPLISSUEDGBL MECHANICAL INC10/22/2019
BISOTISSUEDNGL CONTRACTING CORP07/31/2019
BISPLISSUEDHYDROKINETIC PLBG & HTG I07/24/2019
BISMHISSUEDBROSNA CONSTRUCTION CORPO07/10/2019
BISOTISSUEDNGL CONTRACTING CORP07/01/2019
BISPLISSUEDDPH PLUMBING & HTG CORP06/20/2019
BISPLISSUEDHYDROKINETIC PLBG & HTG I05/29/2019
BISOTISSUEDBROSNA CONSTRUCTION CORPO05/22/2019
BISPLISSUEDHYDROKINETIC PLBG & HTG I03/06/2019
BISOTISSUEDBROSNA CONSTRUCTION CORPO02/27/2019
BISOTISSUEDDNA CONTRACTING LLC10/03/2017
BISEQISSUEDPJP INSTALLERS INC08/30/2017
BISPLISSUEDPARAMOUNT PLBG & HTG CORP02/03/2017
BISOTISSUEDJ LAWRENCE CONSTRCTN CORP02/01/2017
BISOTISSUEDBROSNA CONSTRUCTION CORPO01/26/2017
BISPLISSUEDPARAMOUNT PLBG & HTG CORP09/29/2016
BISOTISSUEDEDIFICE DESIGN INC09/27/2016
BISEQISSUEDEDIFICE DESIGN INC06/23/2016
BISPLISSUEDACCURATE MECHANICAL INC04/29/2016
BISPLISSUEDACCURATE MECHANICAL INC04/29/2016
BISOTISSUEDBROSNA CONSTRUCTION CORPO03/18/2016
BISOTISSUEDBROSNA CONSTRUCTION CORPO03/10/2016
BISOTISSUEDBROSNA CONSTRUCTION CORPO03/10/2016
BISOTISSUEDJ LAWRENCE CONSTRCTN CORP10/20/2015
+ 26 more permits on file
3 projects · most recent 03/18/2025
Gas Water/Sanitary
FiledStatusContractorScope
03/18/2025Signed-offMAC FELDER INCGas, Water/Sanitary
03/15/2024Signed-offHUDSON PLMBING & MCH, LLCGas, Water/Sanitary
01/11/2023Permit IssuedHUDSON PLMBING & MCH, LLCGas, Water/Sanitary
7 projects · most recent 04/07/2025
General Wiring
FiledStatusContractorScope
04/07/2025Permit IssuedRIGID ELECTRIC, INC.General Wiring
07/09/2024CompleteTOP SHELF ELECTRIC CORP—
03/14/2023CompleteCONDUCTOR ELECL SVCS INCGeneral Wiring
01/11/2023CompleteTIKVAH ELECTRIC CO, INC.General Wiring
07/20/2020CompleteENNELL GRP ELECTRIC CORPGeneral Wiring
03/09/2020CompleteENNELL GRP ELECTRIC CORPGeneral Wiring
01/02/2020Permit IssuedL J ELEC'L SERV. INC.General Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/28/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/09/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/10/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/04/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/04/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 71
DateRequirementInspectorRole
03/26/2026Tenant Protection Plan Compliance—special
03/26/2026Fire-Resistance Rated ConstructionMatthew Wavroprogress
03/26/2026FinalMatthew Wavroprogress
03/26/2026Fire-Resistant Penetrations and JointsMatthew Wavrospecial
03/20/2025FinalAILANTO DANIEL MINAWIprogress
03/20/2025Fire-Resistance Rated ConstructionAILANTO DANIEL MINAWIprogress
03/20/2025Interior lighting powerAILANTO DANIEL MINAWIenergy_progress
03/20/2025Lighting in dwelling unitsAILANTO DANIEL MINAWIenergy_progress
03/20/2025Lighting controlsAILANTO DANIEL MINAWIenergy_progress
03/20/2025Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
03/20/2025Fire-Resistant Penetrations and JointsAILANTO DANIEL MINAWIspecial
03/20/2025Energy Code Compliance InspectionsAILANTO DANIEL MINAWIprogress
01/16/2025Fire-Resistant Penetrations and JointsMatthew Wavrospecial
01/16/2025Post-installed AnchorsMatthew Wavrospecial
01/16/2025Concrete - Cast-In-PlaceMatthew Wavrospecial
01/16/2025Sprayed fire-resistant materialsMatthew Wavrospecial
01/16/2025Tenant Protection Plan ComplianceMatthew Wavrospecial
01/16/2025Structural Steel - DetailsMatthew Wavrospecial
01/16/2025MasonryMatthew Wavrospecial
01/16/2025Structural Stability – Alterations of existing buildingsMatthew Wavrospecial
01/16/2025Structural Steel - WeldingMatthew Wavrospecial
01/16/2025FinalMatthew Wavroprogress
01/13/2025FinalMatthew Wavroprogress
01/13/2025Tenant Protection Plan ComplianceMatthew Wavrospecial
01/13/2025Structural Steel - WeldingMatthew Wavrospecial
Latest 25 of 71.
▾Documents — 899 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
09/01/2026M00782191-P1Request digital key ↗
09/01/2026M00782191-I1Request digital key ↗
09/01/2026M08013570-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸Applications & Permits168
▸BISPLAN / WORK APPROVAL APPLICATION77
05/31/2022121716768Open ↗
05/31/2022121716768Open ↗
05/31/2022121716768Open ↗
Showing 3 of 77 on file for this type
▸BISWORK PERMIT APPLICATION72
10/22/2019123516613Open ↗
07/31/2019123516613Open ↗
07/31/2019123516613Open ↗
Showing 3 of 72 on file for this type
▸DOB NOWLPC Approval/Permit18
09/01/2026M08012630-P4Open ↗
09/01/2026M08012630-I1Open ↗
08/27/2026M00940822-S1Open ↗
Showing 3 of 18 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications240
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION94
11/20/2019123778279Open ↗
11/20/2019123778279Open ↗
11/20/2019123778279Open ↗
Showing 3 of 94 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST34
07/02/2019123516613Open ↗
07/02/2019123492032Open ↗
07/01/2019123778279Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature26
09/01/2026M00940822-P2Open ↗
08/31/2026M08012642-I1Open ↗
08/31/2026M08012617-I1Open ↗
Showing 3 of 26 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT24
07/02/2019123516613Open ↗
07/02/2019123492032Open ↗
07/01/2019123778279Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
09/01/2026M00940822-P2Open ↗
08/31/2026M08012617-I1Open ↗
08/28/2026M08012630-P4Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/01/2026M08013570-I1Open ↗
09/01/2026M08012630-P3Open ↗
09/01/2026M08012630-P4Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
09/27/2017140700132Open ↗
08/29/2017140688316Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
09/27/2017140700132Open ↗
08/29/2017140688316Open ↗
Showing 2 of 3 on file for this type
▸Trade Schedules & Equipment84
▸BISSELF-CERT PLUMBING NOTICE31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE24
07/02/2019123516613Open ↗
07/02/2019123492032Open ↗
07/01/2019123778279Open ↗
Showing 3 of 24 on file for this type
▸BISSCHEDULE B - PLUMBING16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
06/07/2022121716768Open ↗
05/27/2022121716768Open ↗
05/27/2022121716768Open ↗
▸BISEQUIPMENT USE PERMITS2
06/07/2022121716768Open ↗
05/27/2022121716768Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
06/01/2022121716768Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
05/27/2022121716768Open ↗
▸Safety & Tenant Protection13
▸BISTenant Protection Plan and Notes12
07/02/2019123516613Open ↗
07/02/2019123492032Open ↗
07/01/2019123778279Open ↗
Showing 3 of 12 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos47
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)12
07/01/2019123778279Open ↗
05/20/2019123490445Open ↗
Showing 2 of 12 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
02/26/2019123850671Open ↗
09/29/2017123140733Open ↗
09/29/2017123140733Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
09/01/2026M08012630-I1Open ↗
08/27/2026M00782204-I1Open ↗
08/27/2026M00940822-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026M08013570-I1Open ↗
08/24/2026M01169581-P1Open ↗
08/24/2026M01169581-S1Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS INSPECTION REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance76
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS55
11/20/2019123778279Open ↗
11/20/2019123778279Open ↗
10/21/2019123490445Open ↗
Showing 3 of 55 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS16
11/20/2019123778279Open ↗
10/21/2019123490445Open ↗
06/19/2019121127299Open ↗
Showing 3 of 16 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/29/2017140688316Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/27/2022121716768Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/29/2017140688316Open ↗
Showing 1 of 2 on file for this type
▸BISMECHANICAL SYSTEMS1
05/27/2022121716768Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/27/2022121716768Open ↗
▸Approvals, Objections & Sign-offs87
▸BISLANDMARKS APPROVAL40
11/20/2019123778279Open ↗
10/21/2019123490445Open ↗
08/08/2019123850671Open ↗
Showing 3 of 40 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST28
11/20/2019123778279Open ↗
10/21/2019123490445Open ↗
08/08/2019123850671Open ↗
Showing 3 of 28 on file for this type
▸BISADMINISTRATIVE OBJECTIONS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/20/2019121127299Open ↗
Showing 1 of 2 on file for this type
▸BISFINAL1
05/27/2022121716768Open ↗
▸BISLANDMARKS SIGNOFF1
05/31/2022121716768Open ↗
▸Cost, Insurance & Ownership68
▸BISCOST AFFIDAVIT66
11/20/2019123778279Open ↗
10/21/2019123490445Open ↗
08/08/2019123850671Open ↗
Showing 3 of 66 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
06/01/2022121716768Open ↗
▸Filing & Intake Forms71
▸BISEFILING COVER SHEET34
07/02/2019123516613Open ↗
07/02/2019123492032Open ↗
07/01/2019123778279Open ↗
Showing 3 of 34 on file for this type
▸BISADDITIONAL INFORMATION19
05/27/2022121716768Open ↗
12/19/2017121127299Open ↗
Showing 2 of 19 on file for this type
▸BISBOROUGH INTAKE FORM11
11/20/2019123778279Open ↗
10/22/2019123516613Open ↗
10/21/2019123490445Open ↗
Showing 3 of 11 on file for this type
▸BISeFiling Job Application Cover Sheet7
09/27/2017140700132Open ↗
08/29/2017140688316Open ↗
Showing 2 of 7 on file for this type
▸Other Documents19
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
07/01/2019123778279Open ↗
10/18/2017121389210Open ↗
Showing 2 of 9 on file for this type
▸DOB NOWProof of Historic Building7
09/01/2026M08012630-P4Open ↗
09/01/2026M08012630-I1Open ↗
08/13/2026M08012617-I1Open ↗
Showing 3 of 7 on file for this type
▸BISSupporting Document: Fee Deferment2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISMAINTENANCE INFORMATION1
06/01/2022121716768Open ↗