← Back
Walk-up cooperative
29 WEST 10 STREET
MANHATTAN · BIN 1009550
💬 Discuss this project
1847Year Built
4Stories
C6Building Class
R6Zoning
7,824 sfGross Floor Area
6Units
Rent Stabilized2 Open Violations ▸
Walk-up cooperative · Owner of record: 29 WEST 10TH ST CORP · 2,397 sf lot · 3.26 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Permit Issued — active, not yet Signed-off
Roof5p · 2 filings · 10 docs
Floor 44p · 1 filing · 4 docs
Floor 34p · 1 filing · 4 docs
Floor 24p · 1 filing · 4 docs
Floor 14p · 1 filing · 4 docs
CellarUnder Construction3p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRICKWORK MANAGEMENT404/09/2026
KLEIN PROPERTY MGT104/09/2026
29 WEST 10TH ST CORP103/22/2026
29 WEST 10 STREET COPR103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW AGE ENGINEERING PLLC203/20/2026
SW ENGINEERING COMPANY209/11/2025
KZ ENGINEERING, P.C206/16/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SYNERGY BUILDING CONSULTANTS203/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
BOYD CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XTREME SCAFFOLDING LLCGeneral Contractor508/25/2026
EXCLUSIVE RESTORATION &General Contractor204/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW AGE ENGINEERING PLLC7746203/20/2026
SWL ENGINEERING INSPECTIO6912209/11/2025
Building Lifecycle
All (35)Filed (6)Permit Issued (8)Signed Off (1)Violation (10)Special Inspection (10)
08/24/2026
Permit issued — Supported Scaffold
M01205997-I1-SH
07/06/2026
Signed off — Alteration
FILING FOR 3RD FLOOR ROOF REPLACEMENT, REAR TERRACE DECK FRAMING REPLACEMENT AND REAR TERRACE DECK INSTALLATION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01273240-I1
04/22/2026
Permit issued — Sidewalk Shed
M01205997-I1-SH
04/20/2026
Permit issued — Sidewalk Shed
M01205997-I1-SF
04/20/2026
Violation issued (ECB, closed)
Unknown
03/30/2026
Permit issued — Boiler Equipment
M01368646-I1-BE
03/20/2026
Filed — Alteration
INSTALL NEW GAS PIPING TO REPLACEMENT BURNER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M01368646-I1
03/20/2026
Filed — Alteration
INSTALL NEW GAS PIPING TO REPLACEMENT BURNER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M01368646-S1
03/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Stephen Shishko
03/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
03/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
03/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
11/28/2025
Permit issued — Structural
M01273240-I1-GC-CX
09/11/2025
Filed — Alteration
FILING FOR 3RD FLOOR ROOF REPLACEMENT, REAR TERRACE DECK FRAMING REPLACEMENT AND REAR TERRACE DECK INSTALLATION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01273240-I1
08/19/2025
Special inspection requirement — Structural Steel - Details
JOSHUA LUCKRITZ
08/18/2025
Special inspection requirement — Final
Joshua Luckritz
08/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
JOSHUA LUCKRITZ
08/18/2025
Special inspection requirement — Structural Steel - Welding
JOSHUA LUCKRITZ
08/18/2025
Special inspection requirement — Structural Cold-Formed Steel
JOSHUA LUCKRITZ
08/18/2025
Special inspection requirement — Post-installed Anchors
JOSHUA LUCKRITZ
06/16/2025
Filed — Alteration
Installation of temporary heavy duty sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01205997-P1
06/04/2025
Violation issued (HPD, closed)
A
05/29/2025
Permit issued — General Construction
M01151515-I1-GC
04/09/2025
Filed — Alteration
Installation of temporary heavy duty sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01205997-I1
04/09/2025
Permit issued — Sidewalk Shed
M01205997-I1-SH
04/09/2025
Permit issued — Supported Scaffold
M01205997-I1-SF
04/01/2025
Filed — Alteration
M01151515-I1
04/01/2024
Violation issued (HPD, closed)
A
11/15/2023
Violation issued (HPD, closed)
I
03/15/2023
Violation issued (HPD, closed)
A
09/18/1989
Violation issued (ECB, closed)
Construction
09/16/1983
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/20/1982
Violation issued (HPD, closed)
A
09/29/1975
Violation issued (HPD, open)
A
09/29/1975
Violation issued (HPD, open)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedXTREME SCAFFOLDING LLC08/24/2026
DOB NOWSidewalk ShedPermit IssuedXTREME SCAFFOLDING LLC04/22/2026
DOB NOWSidewalk ShedPermit IssuedXTREME SCAFFOLDING LLC04/20/2026
DOB NOWBoiler EquipmentPermit IssuedNEW YORK HEATING CORP03/30/2026
DOB NOWStructuralSigned-offEXCLUSIVE RESTORATION &11/28/2025
DOB NOWGeneral ConstructionPermit IssuedEXCLUSIVE RESTORATION &05/29/2025
DOB NOWSidewalk ShedPermit IssuedXTREME SCAFFOLDING LLC04/09/2025
DOB NOWSupported ScaffoldPermit IssuedXTREME SCAFFOLDING LLC04/09/2025
BISMHISSUEDROSS LEE RENOVATIONS INC12/08/1999
BISPLRE-ISSUEDAQUA SYSTEM MECHANICAL, INC.11/19/1999
BISBLISSUEDJ.JEKOWSKY & SON INC11/04/1999
BISOTISSUEDROSS LEE RENOVATIONS INC09/30/1999
1 project · most recent 02/26/2026
FiledStatusContractorScope
02/26/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
1 project · most recent 09/11/2025
Steel
FiledStatusContractorScope
09/11/2025Signed-offEXCLUSIVE RESTORATION &Steel
1 project · most recent 06/16/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
06/16/2025Permit IssuedXTREME SCAFFOLDING LLCScaffold, Sidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
03/19/2026HVAC-R and service water piping design and insulationStephen Shishkoenergy_progress
03/19/2026HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
03/19/2026HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
03/06/2026Tenant Protection Plan ComplianceStephen Shishkospecial
08/19/2025Structural Steel - DetailsJOSHUA LUCKRITZspecial
08/18/2025FinalJoshua Luckritzprogress
08/18/2025Tenant Protection Plan ComplianceJOSHUA LUCKRITZspecial
08/18/2025Structural Steel - WeldingJOSHUA LUCKRITZspecial
08/18/2025Structural Cold-Formed SteelJOSHUA LUCKRITZspecial
08/18/2025Post-installed AnchorsJOSHUA LUCKRITZspecial
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026M01151515-I1Request digital key ↗
08/23/2026M01205997-I1Request digital key ↗
08/23/2026M01205997-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits2
▸DOB NOWLPC Approval/Permit2
08/13/2026M01273240-I1Open ↗
08/13/2026M01151515-I1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026M01151515-I1Open ↗
08/23/2026M01205997-I1Open ↗
08/18/2026M01368646-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/28/2026M01368646-I1Open ↗
08/28/2026M01368646-I1Open ↗
08/28/2026M01368646-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026M01273240-I1Open ↗
08/28/2026M01368646-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/24/2026M01151515-I1Open ↗
08/18/2026M01368646-S1Open ↗
08/18/2026M01368646-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M01273240-I1Open ↗