← Back
Walk-up cooperative
29 WEST 119 STREET
MANHATTAN · Harlem (South) · BIN 1053253
💬 Discuss this project
1909Year Built
6Stories
C6Building Class
R7-2Zoning
20,982 sfGross Floor Area
24Units
Rent Stabilized58 Open Violations ▸
Walk-up cooperative · Owner of record: 29-35 WEST 119TH ST HDFC · 4,902 sf lot · 4.28 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof4p · 1 filing · 7 docs
Floor 46p · 2 filings · 20 docs
Floor 3
Floor 2
Floor 1
Cellar2p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
INSPARISK LLC307/08/2026
MSR CONSTRUCTION CORP503/22/2026
29-35 WEST 119TH STREET HDFC403/22/2026
HPD 806103/22/2026
NEST ROOST REALTY203/21/2026
NYC HOUSING DEVELOPMENT303/21/2026
HPD303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
REGINA L. WHITE CONSULTING203/21/2026
BMB BUILDING CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MKNK WASTE REMOVAL INCGeneral Contractor303/21/2026
DECOR HOME REMODELING CONGeneral Contractor303/21/2026
GUARANTEED HOME IMPROVEMEGeneral Contractor303/21/2026
MSR CONSTRUCTION CORPGeneral Contractor203/21/2026
DANIEL PALKAElectrical103/21/2026
C.R.P PLUMBING & HTG INCPlumbing107/08/2026
LINA ELECTRIC, CORP.Electrical103/22/2026
A.A.D. CONSTRUCTION CORPGeneral Contractor107/08/2026
VORTEC RENOVATIONS CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CEYLAN DESIGN AND CONSULT8422108/29/2022
STEWART ENGINEERING SERVI2506410/14/2021
NEW AGE ENGINEERING PLLC7746101/07/2021
RICHARD KRESHTOOL ARCHITE2867102/14/2020
Building Lifecycle
All (108)Filed (11)Permit Issued (7)Signed Off (2)Violation (60)Inspection (5)Special Inspection (23)
04/15/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/17/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/07/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/18/2023
Permit issued — General Construction
M00675038-I1-GC
07/12/2023
Permit issued — Sidewalk Shed
M00902162-I1-SH
07/10/2023
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
M00902162-I1
05/09/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/27/2023
Signed off — Alteration
M00782116-I1
01/25/2023
Filed — Alteration
Combing two doors into an opening with a structural header under a relieving wall. Removing a wall between two rooms/combine two small rooms into one. Match and/or raise the ceiling within combed rooms. No change to use, egress, or occupancy.
M00795365-I1
12/29/2022
Permit issued — General Construction
M00782116-I1-GC
09/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Water Test
Certified
View inspection ↗
09/19/2022
Special inspection requirement — Energy Code Compliance Inspections
Jorge Chang
09/19/2022
Special inspection requirement — Final
Jorge Chang
09/16/2022
Permit issued — General Construction
M00782116-I1-GC
09/14/2022
Filed — Alteration
PROPOSE ROOF REPLACEMENT, EXTERIOR FACADE REPAIRS, WINDOW REPLACEMENT, AND BUILDING ENTRY RESTORATION AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
M00675038-P1
08/29/2022
Filed — Alteration
M00782116-I1
08/29/2022
Special inspection requirement — Fire-Resistance Rated Construction
SERDAR CEYLAN
08/29/2022
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
08/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERDAR CEYLAN
08/29/2022
Special inspection requirement — Final
SERDAR CEYLAN
08/29/2022
Special inspection requirement — Energy Code Compliance Inspections
08/29/2022
Special inspection requirement — Final
08/29/2022
Special inspection requirement — Lighting controls
SERDAR CEYLAN
08/29/2022
Special inspection requirement — Interior lighting power
SERDAR CEYLAN
08/01/2022
Violation issued (ECB, closed)
Construction
07/11/2022
Permit issued — Plumbing
M00505717-I1-PL
06/24/2022
Permit issued — General Construction
M00505559-I1-GC
03/23/2022
Filed — Alteration
PROPOSE ROOF REPLACEMENT, EXTERIOR FACADE REPAIRS, WINDOW REPLACEMENT, AND BUILDING ENTRY RESTORATION AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
M00675038-I1
10/19/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
EGAR STEWART
10/19/2021
Special inspection requirement — Final
EGAR STEWART
10/19/2021
Special inspection requirement — Energy Code Compliance Inspections
EGAR STEWART
10/19/2021
Special inspection requirement — Fire-Resistance Rated Construction
EGAR STEWART
10/19/2021
Special inspection requirement — Lighting in dwelling units
EGAR STEWART
10/19/2021
Special inspection requirement — Insulation placement and R values
EGAR STEWART
10/19/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
EGAR STEWART
10/19/2021
Special inspection requirement — Energy Code Compliance Inspections
EGAR STEWART
10/19/2021
Special inspection requirement — Maintenance information
EGAR STEWART
10/14/2021
Filed — Alteration
Install new shower, replace lav. basis & water closet, and relocate combine washer & dryer.
M00505717-P1
10/14/2021
Filed — Alteration
Interior Renovation of Apartment No. 43
M00505559-P1
10/12/2021
Special inspection requirement — Maintenance information
EGAR STEWART
10/12/2021
Special inspection requirement — Energy Code Compliance Inspections
EGAR STEWART
10/12/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
EGAR STEWART
04/26/2021
Filed — Alteration
Interior Renovation of Apartment No. 43
M00505559-I1
04/26/2021
Filed — Alteration
Install new shower, replace lav. basis & water closet, and relocate combine washer & dryer.
M00505717-I1
04/15/2021
Signed off — Alteration
M00446743-I1
01/15/2021
Permit issued — Mechanical Systems
M00446743-I1-MS
01/07/2021
Filed — Alteration
M00446743-I1
03/03/2020
Violation issued (HPD, closed)
A
03/03/2020
Violation issued (HPD, closed)
C
03/03/2020
Violation issued (HPD, closed)
A
03/03/2020
Violation issued (HPD, closed)
A
03/03/2020
Violation issued (HPD, closed)
A
02/14/2020
Filed — Alteration
M00312163-I1
02/07/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
richard kreshtool
06/19/2018
Violation issued (HPD, closed)
A
06/19/2018
Violation issued (HPD, closed)
A
06/19/2018
Violation issued (HPD, closed)
A
06/12/2018
Violation issued (HPD, closed)
B
06/12/2018
Violation issued (HPD, closed)
A
06/12/2018
Violation issued (HPD, closed)
A
Latest 60 of 108 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedA.A.D. CONSTRUCTION CORP07/18/2023
DOB NOWSidewalk ShedPermit IssuedMSR CONSTRUCTION CORP07/12/2023
DOB NOWGeneral ConstructionSigned-offVORTEC RENOVATIONS CORP12/29/2022
DOB NOWGeneral ConstructionSigned-offMKNK WASTE REMOVAL INC09/16/2022
DOB NOWPlumbingPermit IssuedC.R.P PLUMBING & HTG INC07/11/2022
DOB NOWGeneral ConstructionPermit IssuedDECOR HOME REMODELING CON06/24/2022
DOB NOWMechanical SystemsSigned-offGUARANTEED HOME IMPROVEME01/15/2021
BISOTISSUEDLL RENOVATION GROUP LLC02/14/2020
BISOTISSUEDHUNG YIP CONTRACTORS INC02/02/2018
BISOTISSUEDUSA CONSTRUCTION & PAINTING09/28/2016
BISBLISSUEDAPPROVED OIL CO OF BKLYN08/24/2016
BISPLISSUEDPLUMBING NYC INC08/24/2016
BISPLISSUEDDPH PLUMBING & HTG CORP06/21/2013
BISOTISSUEDAPEX TOWER CONST CORP06/17/2013
BISPLISSUEDWARD MECHANICAL CORP07/17/2001
BISOTISSUEDWARD MECHANICAL CORP07/17/2001
BISBLISSUEDEFFICIENT COMB&COOLING CO03/23/2000
BISOTISSUEDBRIDGEWORKS OF GREATER NY INC01/24/2000
BISEQISSUEDBRIDGEWORKS OF GREATER NY INC01/24/2000
BISEQISSUEDBRIGEWORKS OF GREATER NY INC01/14/2000
BISEQISSUEDBRIGEWORKS OF GREATER NY INC09/08/1999
BISEQISSUEDBRIDGEWORKS OF GREATER NY INC09/07/1999
BISPLISSUEDST. MARKS P & H CO INC05/11/1998
BISOTISSUEDPSG03/02/1998
BISEQISSUEDPSG CONSTRUCTION CO INC12/02/1997
BISEQISSUEDPSG CONSTRUCTION CO INC12/02/1997
BISOTISSUEDPSG12/01/1997
BISOTISSUEDPSG12/01/1997
BISEQISSUEDPSG CONST.CO.,INC.04/02/1996
BISBLISSUEDS.J. FUEL05/26/1992
BIS—ISSUEDDALIM SIBDIAL SAU AIA09/10/1991
BISPLISSUEDST MARKS PLUMBING CO06/14/1990
1 project · most recent 10/14/2021
Water/Sanitary
FiledStatusContractorScope
10/14/2021Permit IssuedC.R.P PLUMBING & HTG INCWater/Sanitary
5 projects · most recent 08/19/2023
General Wiring
FiledStatusContractorScope
08/19/2023Permit IssuedFOSTER ELEC'L SVC., INC.—
12/27/2022CompleteAPN ELECTRICAL CORPGeneral Wiring
10/26/2022CompleteJ.S.V. ELECTRIC INC.General Wiring
08/23/2022CompleteLINA ELECTRIC, CORP—
07/20/2022CompleteLINA ELECTRIC, CORP—
1 project · most recent 07/10/2023
Sidewalk Shed
FiledStatusContractorScope
07/10/2023Permit IssuedMSR CONSTRUCTION CORPSidewalk Shed
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/15/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/17/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/07/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/09/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/23/2022Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
09/19/2022Energy Code Compliance InspectionsJorge Changprogress
09/19/2022FinalJorge Changprogress
08/29/2022Fire-Resistance Rated ConstructionSERDAR CEYLANprogress
08/29/2022Energy Code Compliance InspectionsSERDAR CEYLANprogress
08/29/2022Fire-Resistant Penetrations and JointsSERDAR CEYLANspecial
08/29/2022FinalSERDAR CEYLANprogress
08/29/2022Energy Code Compliance Inspections—progress
08/29/2022Final—progress
08/29/2022Lighting controlsSERDAR CEYLANenergy_progress
08/29/2022Interior lighting powerSERDAR CEYLANenergy_progress
10/19/2021Fire-Resistant Penetrations and JointsEGAR STEWARTspecial
10/19/2021FinalEGAR STEWARTprogress
10/19/2021Energy Code Compliance InspectionsEGAR STEWARTprogress
10/19/2021Fire-Resistance Rated ConstructionEGAR STEWARTprogress
10/19/2021Lighting in dwelling unitsEGAR STEWARTenergy_progress
10/19/2021Insulation placement and R valuesEGAR STEWARTenergy_progress
10/19/2021Fire-Resistant Penetrations and JointsEGAR STEWARTspecial
10/19/2021Energy Code Compliance InspectionsEGAR STEWARTprogress
10/19/2021Maintenance informationEGAR STEWARTenergy_progress
10/12/2021Maintenance informationEGAR STEWARTenergy_progress
10/12/2021Energy Code Compliance InspectionsEGAR STEWARTprogress
10/12/2021Fire-Resistant Penetrations and JointsEGAR STEWARTspecial
02/07/2020Fire-Resistant Penetrations and Jointsrichard kreshtoolspecial
▾Documents — 115 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch9
09/03/2026M00505717-P1Request digital key ↗
09/03/2026M00505717-I1Request digital key ↗
09/03/2026M00505559-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00312163-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00446743-I1Request digital key ↗
▸Applications & Permits13
▸BISWORK PERMIT APPLICATION8
02/19/2020123880498Open ↗
02/02/2018123146318Open ↗
09/20/2016140551524Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
02/19/2020123880498Open ↗
01/05/2018123146318Open ↗
09/20/2016140551524Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications40
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026M00782116-I1Open ↗
09/01/2026M00782116-I1Open ↗
09/01/2026M00505559-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/04/2026M00446743-I1Open ↗
09/03/2026M00505717-P1Open ↗
09/03/2026M00505717-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
02/19/2020123880498Open ↗
01/17/2019123146318Open ↗
01/05/2018123146318Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
01/05/2018123146318Open ↗
09/20/2016140551524Open ↗
08/23/2016140539031Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026M00782116-I1Open ↗
09/01/2026M00505559-I1Open ↗
08/23/2026M00505717-P1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
01/05/2018123146318Open ↗
06/05/2013121641223Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/20/2016140551524Open ↗
08/23/2016140539031Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
09/20/2016140551524Open ↗
08/23/2016140539031Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/05/2013121641223Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING2
08/23/2016140539031Open ↗
06/05/2013121641223Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
11/27/2013121641223Open ↗
09/04/2013121641223Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
08/23/2016140539031Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes3
02/19/2020123880498Open ↗
01/05/2018123146318Open ↗
08/23/2016140539031Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00312163-I1Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/04/2026M00446743-I1Open ↗
09/03/2026M00505717-I1Open ↗
09/03/2026M00505717-P1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
02/19/2020123880498Open ↗
01/05/2018123146318Open ↗
09/20/2016140551524Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00675038-I1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
02/19/2020123880498Open ↗
01/17/2019123146318Open ↗
01/05/2018123146318Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
09/20/2016140551524Open ↗
08/23/2016140539031Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/17/2019123146318Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/23/2016140539031Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00782116-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/20/2016140551524Open ↗
08/23/2016140539031Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
01/17/2019123146318Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
01/17/2019123146318Open ↗
02/10/2014121641223Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
06/05/2013121641223Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT7
02/19/2020123880498Open ↗
01/17/2019123146318Open ↗
01/05/2018123146318Open ↗
Showing 3 of 7 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
02/19/2020123880498Open ↗
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET3
02/19/2020123880498Open ↗
01/05/2018123146318Open ↗
06/05/2013121641223Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
09/20/2016140551524Open ↗
08/23/2016140539031Open ↗
▸BISBOROUGH INTAKE FORM1
01/17/2019123146318Open ↗