← Back
Three families
290 CLIFTON AVENUE
STATEN ISLAND · Rosebank-Shore Acres-Park Hill · BIN 5106199
💬 Discuss this project
1915Year Built
3Stories
C0Building Class
R3AZoning
3,917 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · 5,750 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AVID DESIGNS, INC308/23/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HOLLYWOOD CONS. GROUP INCGeneral Contractor903/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AVID DESIGNS, INC.453105/29/2024
Building Lifecycle
All (25)Filed (3)Permit Issued (3)Signed Off (3)Violation (2)Inspection (1)Objection (10)Special Inspection (3)
05/27/2025
Signed off — Alteration
S01057612-I1
05/27/2025
Signed off — Alteration
S01057448-I1
05/21/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/06/2025
Signed off — Alteration
S01057612-S1
12/05/2024
Violation issued (HPD, closed)
I
09/16/2024
Permit issued — Construction Fence
S01057612-S1-FN
09/16/2024
Permit issued — General Construction
S01057448-I1-GC
09/13/2024
Permit issued — General Construction
S01057612-I1-GC
08/23/2024
Filed — Alteration
S01057612-S1
07/18/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jeffrey Geary
06/13/2024
Objection raised — Other
06/13/2024
Objection resolved — Addressed
06/12/2024
Objection raised — Other
06/12/2024
Objection resolved — Addressed
06/12/2024
Objection raised — Scope
06/12/2024
Objection resolved — Addressed
06/12/2024
Objection raised — Other
06/12/2024
Objection resolved — Addressed
06/12/2024
Objection raised — Inspections
06/12/2024
Objection resolved — Addressed
05/29/2024
Filed — Alteration
S01057612-I1
05/29/2024
Filed — Alteration
S01057448-I1
05/28/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Jeffrey Geary
05/28/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Jeffrey Geary
02/22/2024
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offHOLLYWOOD CONS. GROUP INC09/16/2024
DOB NOWGeneral ConstructionSigned-offHOLLYWOOD CONS. GROUP INC09/16/2024
DOB NOWGeneral ConstructionSigned-offHOLLYWOOD CONS. GROUP INC09/13/2024
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/21/2025Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
07/18/2024Structural Stability – Alterations of existing buildingsJeffrey Gearyspecial
05/28/2024Exterior Insulation and Finish Systems (EIFS)Jeffrey Gearyspecial
05/28/2024Exterior Insulation and Finish Systems (EIFS)Jeffrey Gearyspecial
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026S01057612-I1Request digital key ↗
08/21/2026S01057612-S1Request digital key ↗
08/21/2026S01057448-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026S01057448-I1Open ↗
08/13/2026S01057612-I1Open ↗
08/13/2026S01057612-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026S01057612-I1Open ↗
08/27/2026S01057448-I1Open ↗
08/27/2026S01057448-I1Open ↗