← Back
Elevator cooperative
290 WEST 232 STREET
BRONX · Kingsbridge-Marble Hill · BIN 2083215
💬 Discuss this project
1966Year Built
20Stories
D4Building Class
R6Zoning
122,000 sfGross Floor Area
117Units
LL97 CoveredRent Stabilized4 Open Violations 3 unresolved · 1 paperwork only ▸FISP: UNSAFE
Elevator cooperative · Owner of record: CORLEAR GARDENS HOUSING CO. INC. · 53,650 sf lot · 2.27 FAR built · Flood zone X
Locations of Work
ArchitectureEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 4 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
XINOS CONSTRUCTION1607/08/2026
METRO MANAGEMENT DEVELOPMENT1107/08/2026
CORLEAR GARDENS HOUSING2503/22/2026
NYC HOUSING DEVELOPMENT C503/22/2026
NEWYORK CITY HOUSING DEVE103/22/2026
METRO MANAGEMENT103/22/2026
HPD 806103/22/2026
METRO MANAGMENT DEVELOPME103/22/2026
METRO MNGMT.DEVELOPMENT I203/22/2026
CORLEAN GDNS HSG CO203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
QUEENS ENGINEERING510/14/2025
LAWLESS AND MANGIONE ARCHITECTS AND108/30/2024
ROBERT GERMAIN JR. PE302/11/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XINOS CONSTRUCTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XINOS CONSTRUCTION CORPGeneral Contractor907/08/2026
ANASTASIOS MATSIKASElectrical103/21/2026
GEORGIOS KOUSPOSElectrical103/21/2026
IRVING BAPTISTEElectrical103/21/2026
NEW YORK PLBG-HTG-COOL CPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
QUEENS ENGINEERING PLLC8898310/14/2025
NY RESTORATION TECHNOLOGY6187108/30/2024
ROBERT F. GERMAIN JR. PE5100302/11/2021
Building Lifecycle
All (112)Filed (9)Permit Issued (11)Signed Off (2)Facade (FISP) (21)Violation (60)Objection (2)Special Inspection (7)
07/25/2026
Cycle 9 facade report submitted
07/21/2026
Cycle 9 facade inspection completed
07/21/2026
Cycle 9 facade report signed — UNSAFE
06/29/2026
Violation issued (ECB, open)
Construction
06/24/2026
Cycle 9 facade report submitted
06/03/2026
Cycle 9 facade inspection completed
06/02/2026
Permit issued — Sidewalk Shed
X01031411-I1-SH
03/12/2026
Permit issued — General Construction
X01065874-I1-GC
03/05/2026
Permit issued — Sidewalk Shed
X01031411-I1-SH
02/02/2026
Permit issued — Suspended Scaffold
X01031338-I1-SC
12/12/2025
Cycle 9 facade report submitted
12/12/2025
Cycle 9 facade report signed — UNSAFE
12/05/2025
Cycle 9 facade inspection completed
10/15/2025
Permit issued — Supported Scaffold
X01299477-I1-SF
10/14/2025
Filed — Alteration
Proposed installation of a temporary pipe scaffolding as per plans submitted. Work shall comply with building code, chapter 33. No changes in use, egress or occupancy.
X01299477-I1
10/08/2025
Special inspection requirement — Post-installed Anchors
ANDREAS CHRISTOFOROU
08/06/2025
Filed — Alteration
ANCHOR POINT INSTALLATION AT ROOF. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01263566-I1
07/30/2025
Special inspection requirement — Post-installed Anchors
ANDREAS CHRISTOFOROU
07/30/2025
Special inspection requirement — Tenant Protection Plan Compliance
ANDREAS CHRISTOFOROU
07/30/2025
Special inspection requirement — Final
ANDREAS CHRISTOFOROU
05/30/2025
Violation issued (ECB, closed)
Construction
05/30/2025
Violation issued (ECB, closed)
Construction
05/30/2025
Violation issued (ECB, closed)
Construction
05/05/2025
Permit issued — Sidewalk Shed
X01031411-I1-SH
02/28/2025
Permit issued — Suspended Scaffold
X01031338-I1-SC
02/21/2025
Objection resolved — Addressed
02/13/2025
Permit issued — General Construction
X01065874-I1-GC
02/04/2025
Objection raised — Other
02/01/2025
Filed — Alteration
Outriggers system installation for inspection of facade and repairs.
X01031338-I1
01/29/2025
Filed — Alteration
Proposed installation of heavy duty sidewalk shed as per plans. Work to comply with New York City Building code Chapter 33. No change in use, egress or occupancy.
X01031411-P1
08/30/2024
Filed — Alteration
X01065874-I1
08/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/30/2024
Permit issued — Sidewalk Shed
X01031411-I1-SH
04/29/2024
Filed — Alteration
Proposed installation of heavy duty sidewalk shed as per plans. Work to comply with New York City Building code Chapter 33. No change in use, egress or occupancy.
X01031411-I1
04/29/2024
Special inspection requirement — Post-installed Anchors
ANDREAS CHRISTOFOROU
04/29/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
ANDREAS CHRISTOFOROU
02/21/2024
Cycle 9 facade report submitted
02/21/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/18/2024
Cycle 9 facade report signed — UNSAFE
02/05/2024
Cycle 9 facade inspection completed
04/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/14/2021
Signed off — Alteration
REPLACEMENT (1) NEW L.P. BOILER (BOILER #2). REMOUNT/REUSE (1) EXISTING COMBINATION GAS/OIL BURNER. CHANGE GRADE OF FUEL OIL FROM #4 TO #2. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
X00227204-S1
04/14/2021
Signed off — Alteration
REPLACEMENT (1) NEW L.P. BOILER (BOILER #2). REMOUNT/REUSE (1) EXISTING COMBINATION GAS/OIL BURNER. CHANGE GRADE OF FUEL OIL FROM #4 TO #2. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
X00227204-I1
02/16/2021
Permit issued — Boiler Equipment
X00227204-S1-BE
02/11/2021
Filed — Alteration
REPLACEMENT (1) NEW L.P. BOILER (BOILER #2). REMOUNT/REUSE (1) EXISTING COMBINATION GAS/OIL BURNER. CHANGE GRADE OF FUEL OIL FROM #4 TO #2. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
X00227204-S1
02/11/2021
Filed — Alteration
REPLACEMENT (1) NEW L.P. BOILER (BOILER #2). REMOUNT/REUSE (1) EXISTING COMBINATION GAS/OIL BURNER. CHANGE GRADE OF FUEL OIL FROM #4 TO #2. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
X00227204-P1
12/09/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
09/08/2020
Violation issued (HPD, closed)
B
09/08/2020
Violation issued (HPD, closed)
B
07/20/2020
Permit issued — Boiler Equipment
X00227204-I1-BE
07/17/2020
Filed — Alteration
REPLACEMENT (1) NEW L.P. BOILER (BOILER #2). REMOUNT/REUSE (1) EXISTING COMBINATION GAS/OIL BURNER. CHANGE GRADE OF FUEL OIL FROM #4 TO #2. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
X00227204-I1
04/17/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/17/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/15/2019
Cycle 8 facade report submitted
01/02/2019
Cycle 8 facade report signed — SWARMP
01/01/2019
Cycle 8 facade inspection completed
04/25/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/25/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/08/2018
Violation issued (HPD, closed)
B
05/06/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 112 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedXINOS CONSTRUCTION CORP06/02/2026
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP03/12/2026
DOB NOWSidewalk ShedPermit IssuedXINOS CONSTRUCTION CORP03/05/2026
DOB NOWSuspended ScaffoldPermit IssuedXINOS CONSTRUCTION CORP02/02/2026
DOB NOWSupported ScaffoldPermit IssuedXINOS CONSTRUCTION CORP10/15/2025
DOB NOWSidewalk ShedPermit IssuedXINOS CONSTRUCTION CORP05/05/2025
DOB NOWSuspended ScaffoldPermit IssuedXINOS CONSTRUCTION CORP02/28/2025
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP02/13/2025
DOB NOWSidewalk ShedPermit IssuedXINOS CONSTRUCTION CORP04/30/2024
DOB NOWBoiler EquipmentSigned-offC C CONTROLLED COMBUSTION02/16/2021
DOB NOWBoiler EquipmentSigned-offC C CONTROLLED COMBUSTION07/20/2020
BISOTISSUEDXINOS CONSTRUCTION CORP05/03/2018
BISFSISSUEDAPPROVED OIL CO OF BKLYN12/06/2013
BISOTISSUEDAM&G WATERPROOFING LLC04/20/2012
BISEQISSUEDDYNAMIC BRIDGE & SCAFFOLD04/04/2012
BISOTISSUEDAM&G WATERPROOFING LLC03/05/2012
BISOTISSUEDAM&G WATERPROOFING LLC02/17/2012
BISEQISSUEDDYNAMIC BRIDGE & SCAFFOLD09/09/2011
BISEQISSUEDXINOS CONSTRUCTION CORP05/19/2008
BISBLISSUEDC C CONTROLLED COMBUSTION01/10/1996
BISOTISSUEDIDC SYSTEMS INC.06/03/1993
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.03/27/1992
1 project · most recent 06/11/2025
FiledStatusContractorScope
06/11/2025Permit IssuedTOWER ELECTRIC INC.—
2 projects · most recent 10/14/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
10/14/2025Permit IssuedXINOS CONSTRUCTION CORPScaffold
01/29/2025Permit IssuedXINOS CONSTRUCTION CORPSidewalk Shed
1 project · most recent 02/01/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
02/01/2025Permit IssuedXINOS CONSTRUCTION CORPSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
10/08/2025Post-installed AnchorsANDREAS CHRISTOFOROUspecial
07/30/2025Post-installed AnchorsANDREAS CHRISTOFOROUspecial
07/30/2025Tenant Protection Plan ComplianceANDREAS CHRISTOFOROUspecial
07/30/2025FinalANDREAS CHRISTOFOROUprogress
04/29/2024Post-installed AnchorsANDREAS CHRISTOFOROUspecial
04/29/2024Alternative Materials - OTCR Buildings Bulletin NumberANDREAS CHRISTOFOROUspecial
12/09/2020Fire-Resistant Penetrations and JointsRobert Germain Jr.special
▾Documents — 110 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch5
08/21/2026X01065874-I1Request digital key ↗
08/20/2026X01031411-I1Request digital key ↗
08/20/2026X01031411-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment3
08/26/2026X00227204-S1Request digital key ↗
08/26/2026X00227204-I1Request digital key ↗
08/15/2026X00227204-P1Request digital key ↗
▸Applications & Permits17
▸BISWORK PERMIT APPLICATION9
05/07/2018220647708Open ↗
12/07/2013220345222Open ↗
05/07/2013220136403Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION8
05/07/2018220647708Open ↗
12/04/2013220345222Open ↗
01/25/2012220137723Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications32
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
05/07/2018220647708Open ↗
10/23/2014220345222Open ↗
12/04/2013220345222Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026X00227204-S1Open ↗
08/26/2026X00227204-I1Open ↗
08/26/2026X00227204-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/12/2026X01299477-I1Open ↗
09/01/2026X01031338-I1Open ↗
09/01/2026X01031338-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
05/07/2018220647708Open ↗
12/13/2013220345222Open ↗
09/07/2011220137723Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
05/07/2018220647708Open ↗
12/04/2013220345222Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/07/2011220137723Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
12/04/2013220345222Open ↗
12/04/2013220345222Open ↗
▸Safety & Tenant Protection4
▸DOB NOWTenant Protection Plan3
08/13/2026X00227204-I1Open ↗
08/13/2026X00227204-P1Open ↗
08/13/2026X00227204-S1Open ↗
▸BISTenant Protection Plan and Notes1
05/07/2018220647708Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/26/2026X00227204-P1Open ↗
08/26/2026X00227204-S1Open ↗
08/26/2026X00227204-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
05/07/2018220647708Open ↗
12/04/2013220345222Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
03/14/2008210036600Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
05/07/2018220647708Open ↗
10/23/2014220345222Open ↗
12/04/2013220345222Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
10/23/2014220345222Open ↗
03/22/2013220136403Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00227204-I1Open ↗
▸Approvals, Objections & Sign-offs15
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
10/23/2014220345222Open ↗
06/20/2013220137723Open ↗
03/22/2013220136403Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
10/23/2014220345222Open ↗
06/20/2013220137723Open ↗
02/13/2013220136403Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
09/07/2011220137723Open ↗
08/18/2011220136403Open ↗
04/11/2008210044423Open ↗
Showing 3 of 4 on file for this type
▸BISCCD1-Construction Code Determination1
09/11/2012220136403Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT7
05/07/2018220647708Open ↗
10/23/2014220345222Open ↗
12/04/2013220345222Open ↗
Showing 3 of 7 on file for this type
▸BISLL58/88-CIVIL PENALTY AFFIDAVIT1
09/12/2011220137723Open ↗
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET4
05/07/2018220647708Open ↗
12/04/2013220345222Open ↗
09/07/2011220137723Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION2
01/25/2012220137723Open ↗
08/18/2011220136403Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026X01031338-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X01031338-I1Open ↗