← Back
BuildNYC
Condo, residential unit in elevator building
290 WEST STREET
MANHATTAN · BIN 1089819
💬 Discuss this project
2013Year Built
9Stories
R4Building Class
C6-2AZoning
32,690 sfGross Floor Area
13Units
LL97 CoveredRent Stabilized1 Active Violation ▸FISP: SAFE
Condo, residential unit in elevator building · 6,740 sf lot · 4.85 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSuspended scaffold outrigger system for facade restoration aUnder Construction20p · 4 filings · 20 docs
BulkheadSuspended scaffold outrigger system for facade restoration aUnder Construction1p · 1 filing · 5 docs
PenthouseUnit PH, Unit PHB36p · 4 filings · 20 docs
Floor 99th floor penthouse mechanical work7p · 3 filings · 20 docs
Floor 8Sprinkler system alteration8p · 2 filings · 20 docs
Floor 7Sprinkler system alteration7p · 2 filings · 20 docs
Floor 6Unit 6B6p · 2 filings · 20 docs
Floor 5Unit 5B8p · 1 filing · 11 docs
Floor 4
Floor 3
Floor 2Unit 2B4p · 2 filings · 11 docs
Floor 1Modify existing sprinkler system, 1st floor lobby12p · 3 filings · 20 docs
Site & exterior290 WEST CONDOMINIUM FACADE REPAIRS7p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
290 West VE3503/21/2026
Exxonmobil Fuels Marketing Co403/21/2026
290 West VE LLC 40 VE Equities203/21/2026
290 West Street Condominium103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Socotec1203/21/2026
Theresa Voltaggio103/21/2026
J Callahan Consulting2403/21/2026
Kushner Studios303/21/2026
PS Engineers203/21/2026
Kma Designs203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
New Reliant ConstructionGeneral Contractor1407/08/2026
QMB Plumbing & HeatingFire Protection407/08/2026
Algozini PlumbingPlumbing403/22/2026
Unity Construction GroupGeneral Contractor307/08/2026
JSD Construction GroupGeneral Contractor303/21/2026
QMB Plumbing & HeatingPlumbing307/08/2026
Authentic PlumbingPlumbing207/08/2026
Tribute Restorationspecialty_contractor104/09/2026
High Quality Electric ofElectrical103/21/2026
Kings Group NYScaffold107/08/2026
AAA Total PlumbingPlumbing107/08/2026
KJK ElectricElectrical103/22/2026
Par Fire ProtectionFire Protection107/08/2026
High Quality Electric of NYCElectrical103/22/2026
New Rising ConstructionGeneral Contractor107/08/2026
Gurri InstallationGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alan Margolin & Associates4231207/24/2025
Francisco D. Perez PE3306104/17/2025
Cowley Engineering186112/30/2024
AG Engineering8899112/30/2024
Studio Nyandak Architectu8378105/09/2023
Michael House Architect7910102/07/2023
Bilotta Architecture7904108/04/2022
Ace Structural Engineering496709/23/2021
Crosscheck Inspection Services544312/14/2020
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
10/30/2026
Signed off — Alteration
REPLACEMENT AND RELOCATION OF EXISTING PLUMBING FIXTURES AS PART OF PARTIAL APT. 5B INTERIOR RENOVATION.
M00821376-S1
10/30/2026
Permit renewed — Suspended Scaffold
Renewed without changes
M01206270-I1-SC
08/20/2026
Filed — Alteration
REPLACEMENT AND RELOCATION OF EXISTING PLUMBING FIXTURES AS PART OF PARTIAL APT. 5B INTERIOR RENOVATION.
M00821376-P1
05/08/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
206 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedTribute Restoration10/30/2026
DOB NOWSprinklersSigned-offQMB Plumbing & Heating01/07/2026
DOB NOWSuspended ScaffoldPermit IssuedTribute Restoration10/03/2025
DOB NOWGeneral ConstructionSigned-offNew Reliant Construction09/08/2025
DOB NOWGeneral ConstructionPermit IssuedTribute Restoration04/25/2025
DOB NOWSidewalk ShedSigned-offKings Group NY04/18/2025
DOB NOWSuspended ScaffoldPermit IssuedTribute Restoration04/17/2025
DOB NOWPlumbingSigned-offAuthentic Plumbing04/02/2025
DOB NOWGeneral ConstructionSigned-offNew Reliant Construction01/28/2025
DOB NOWMechanical SystemsSigned-offNew Reliant Construction10/15/2024
DOB NOWStructuralSigned-offNew Reliant Construction10/15/2024
DOB NOWGeneral ConstructionSigned-offNew Reliant Construction10/11/2024
DOB NOWPlumbingSigned-offAuthentic Plumbing12/11/2023
DOB NOWStructuralSigned-offNew Reliant Construction10/10/2023
DOB NOWMechanical SystemsSigned-offNew Reliant Construction10/10/2023
DOB NOWGeneral ConstructionPermit IssuedJSD Construction Group09/07/2023
DOB NOWPlumbingSigned-offQMB Plumbing & Heating08/03/2023
DOB NOWSprinklersSigned-offQMB Plumbing & Heating08/03/2023
DOB NOWMechanical SystemsSigned-offNew Reliant Construction07/27/2023
DOB NOWGeneral ConstructionSigned-offNew Reliant Construction07/26/2023
DOB NOWStructuralSigned-offNew Reliant Construction07/26/2023
DOB NOWPlumbingSigned-offAAA Total Plumbing08/18/2022
DOB NOWGeneral ConstructionSigned-offGurri Installation08/17/2022
DOB NOWStructuralSigned-offUnity Construction Group10/01/2021
DOB NOWSprinklersSigned-offLawrence J. Levine09/21/2021
DOB NOWSprinklersSigned-offQMB Plumbing & Heating02/16/2021
DOB NOWMechanical SystemsSigned-offUnity Construction Group12/21/2020
DOB NOWStructuralSigned-offNew Rising Construction09/19/2019
DOB NOWSprinklersSigned-offQMB Plumbing & Heating09/18/2019
BISOTISSUEDUnity Construction Group12/01/2020
BISMHISSUEDNew Rising Construction09/01/2020
BISOTISSUEDNew Rising Construction09/01/2020
BIS—ISSUEDNew Rising Construction06/29/2020
BISPLISSUEDAriel Services02/16/2018
BISSDISSUEDAriel Services01/05/2016
BISOTISSUEDFoundations Interior Design12/09/2015
BISPLISSUEDAriel Services11/05/2015
BISSDISSUEDAriel Services08/28/2015
BISEQISSUEDRock Group NY08/12/2015
BISSPISSUEDGo Pro Fire Protection08/11/2015
+ 30 more permits on file
1 project · most recent 08/20/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/20/2026Signed-offAuthentic PlumbingGas, Water/Sanitary
7 projects · most recent 05/06/2025
General Wiring
FiledStatusContractorScope
05/06/2025CompleteHigh Quality Electric of NYC—
10/03/2023CompleteMagnetic ElectricGeneral Wiring
08/30/2022CompleteLion Heart ElectricGeneral Wiring
02/04/2021CompleteKJK ElectricGeneral Wiring
01/13/2021CompleteKleinknecht Electric CoGeneral Wiring
12/22/2020CompleteDaven Electric—
07/11/2020CompleteDaven Electric—
1 project · most recent 04/17/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
04/17/2025Permit IssuedTribute RestorationSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
11/19/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/17/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/01/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/25/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/31/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/27/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/22/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 82
DateRequirementInspectorRole
08/27/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
05/22/2025Mechanical SystemsYoung Suhspecial
05/22/2025Heating SystemsYoung Suhspecial
05/22/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
05/22/2025Energy Code Compliance InspectionsYoung Suhprogress
05/22/2025HVAC-R and service water piping design and insulationYoung Suhenergy_progress
05/22/2025FinalYoung Suhprogress
04/04/2025Post-installed AnchorsFRANCISCO PEREZspecial
12/18/2024Tenant Protection Plan ComplianceARIEL GOLSHANspecial
11/16/2024FinalEric Cowleyprogress
11/16/2024Structural Stability – Alterations of existing buildingsEric Cowleyspecial
11/16/2024Exterior Insulation and Finish Systems (EIFS)Eric Cowleyspecial
08/29/2024Fire-Resistant Penetrations and JointsYoung Suhspecial
08/29/2024Sprinkler SystemsYoung Suhspecial
07/01/2024FinalYoung Suhprogress
07/01/2024Post-installed AnchorsYoung Suhspecial
07/01/2024Fire-Resistant Penetrations and JointsYoung Suhspecial
07/01/2024Fire-Resistance Rated ConstructionYoung Suhprogress
07/01/2024Lighting in dwelling unitsYoung Suhenergy_progress
07/01/2024Interior lighting powerYoung Suhenergy_progress
07/01/2024Lighting controlsYoung Suhenergy_progress
07/01/2024Energy Code Compliance InspectionsYoung Suhprogress
11/30/2023Fire-Resistant Penetrations and JointsYoung Suhspecial
11/30/2023Post-installed AnchorsYoung Suhspecial
11/30/2023Lighting in dwelling unitsYoung Suhenergy_progress
Latest 25 of 82.
622 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account