Condo, residential unit in elevator building
290 WEST STREET
MANHATTAN · Tribeca-Civic Center · BIN 1089819
💬 Discuss this project
2013Year Built
9Stories
R4Building Class
C6-2AZoning
32,690 sfGross Floor Area
13Units
LL97 CoveredRent Stabilized1 Open Violation ▸FISP: SAFE
Condo, residential unit in elevator building · 6,740 sf lot · 4.85 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction20p · 3 filings · 20 docs
BulkheadUnder Construction1p · 1 filing · 5 docs
Penthouse37p · 4 filings · 20 docs
Floor 94p · 1 filing · 4 docs
Floor 87p · 2 filings · 20 docs
Floor 76p · 2 filings · 20 docs
Floor 65p · 2 filings · 20 docs
Floor 58p · 1 filing · 11 docs
Floor 4
Floor 3
Floor 24p · 2 filings · 11 docs
Floor 112p · 3 filings · 20 docs
Site & exterior7p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
290 WEST VE2803/21/2026
DOUGLAS ELLIMAN PROPERTY MANAGEMENT2307/08/2026
290 WEST703/21/2026
KINGS GROUP NY507/08/2026
ROCK GROUP NY203/21/2026
290 WEST VE LLC 40 VE EQUITIES203/21/2026
290 WEST STREET CONDOMINIUM103/21/2026
FirstService Residential103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.1203/21/2026
THERESA VOLTAGGIO103/21/2026
J CALLAHAN CONSULTING2403/21/2026
KUSHNER STUDIOS303/21/2026
PS ENGINEERS203/21/2026
KMA DESIGNS LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW RELIANT CONSTRUCTIONGeneral Contractor1407/08/2026
QMB PLUMBING & HTG INCFire Protection407/08/2026
ALGOZINI PLUMBING CORPPlumbing403/22/2026
QMB PLUMBING & HEATING INCPlumbing307/08/2026
JSD CONSTRUCTION GROUP INGeneral Contractor303/21/2026
UNITY CONSTRUCTION GROUPGeneral Contractor307/08/2026
AUTHENTIC PLBG CORPPlumbing207/08/2026
KINGS GROUP NY CORPGeneral Contractor107/08/2026
KJK ELECTRIC INCElectrical103/22/2026
NEW RISING CONSTRUCTIONGeneral Contractor107/08/2026
TRIBUTE RESTORATION INCGeneral Contractor104/09/2026
ALEXANDER EUGENEElectrical103/21/2026
AAA TOTAL PLUMBING, INCPlumbing107/08/2026
HIGH QUALITY ELEC.OF NYCElectrical103/22/2026
PAR FIRE PROTECTION LLCFire Protection107/08/2026
GURRI INSTALLATION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN MARGOLIN & ASSOC4231207/24/2025
FRANCISCO D. PEREZ PE3306104/17/2025
COWLEY ENGINEERING186112/30/2024
AG ENGINEERING PLLC8899112/30/2024
RLC HVAC CONTROLS LLC5082102/07/2023
BILOTTA ARCHITECTURE7904108/04/2022
ACE STRUCTURAL ENGINEERIN496709/23/2021
CROSSCHECK INSPECTION SER544312/14/2020
Building Lifecycle
All (197)Filed (29)Permit Issued (28)Signed Off (13)Facade (FISP) (3)Violation (29)Inspection (15)Objection (50)Special Inspection (30)
08/20/2026
Filed — Alteration
REPLACEMENT AND RELOCATION OF EXISTING PLUMBING FIXTURES AS PART OF PARTIAL APT. 5B INTERIOR RENOVATION.
M00821376-P1
05/08/2026
Violation issued (HPD, open)
A
04/15/2026
Signed off — Alteration
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycbc.
M01211961-I1
02/19/2026
Signed off — Alteration
M00821617-I1
02/19/2026
Signed off — Alteration
SPRINKLER WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00821690-I1
02/19/2026
Signed off — Alteration
PLUMBNG WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00821665-I1
02/19/2026
Signed off — Alteration
MECHANICAL WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00821635-I1
01/22/2026
Signed off — Alteration
M00823790-I1
01/07/2026
Permit issued — Sprinklers
M00821690-I1-EW-SP
11/19/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/17/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/17/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/17/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/10/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/03/2025
Permit issued — Suspended Scaffold
M01206270-I1-SC
09/08/2025
Permit issued — General Construction
M00821617-I1-GC
08/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
08/15/2025
Objection resolved — Addressed
08/11/2025
Objection raised — Cost
07/24/2025
Filed — Alteration
MECHANICAL WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00821635-P2
07/24/2025
Filed — Alteration
PLUMBNG WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00821665-P2
05/22/2025
Special inspection requirement — Heating Systems
Young Suh
05/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
05/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
05/22/2025
Special inspection requirement — Final
Young Suh
05/22/2025
Special inspection requirement — Mechanical Systems
Young Suh
05/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Young Suh
04/25/2025
Permit issued — General Construction
M01143420-I1-GC
04/18/2025
Filed — Alteration
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycbc.
M01211961-I1
04/18/2025
Permit issued — Sidewalk Shed
M01211961-I1-SH
04/18/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/17/2025
Filed — Alteration
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
M01206270-I1
04/17/2025
Permit issued — Suspended Scaffold
M01206270-I1-SC
04/04/2025
Special inspection requirement — Post-installed Anchors
FRANCISCO PEREZ
04/02/2025
Permit issued — Plumbing
M00821376-S1-PL
01/28/2025
Permit issued — General Construction
M00821617-I1-GC
01/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/30/2024
Filed — Alteration
M01143420-I1
12/18/2024
Special inspection requirement — Tenant Protection Plan Compliance
ARIEL GOLSHAN
11/16/2024
Special inspection requirement — Final
Eric Cowley
11/16/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Eric Cowley
11/16/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Eric Cowley
10/15/2024
Permit issued — Structural
M00823790-I1-ST
10/15/2024
Permit issued — Mechanical Systems
M00821635-I1-MS
10/11/2024
Permit issued — General Construction
M00821617-I1-GC
09/12/2024
Filed — Alteration
SPRINKLER WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00821690-P2
08/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
08/29/2024
Special inspection requirement — Sprinkler Systems
Young Suh
07/01/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/01/2024
Special inspection requirement — Lighting controls
Young Suh
07/01/2024
Special inspection requirement — Fire-Resistance Rated Construction
Young Suh
07/01/2024
Special inspection requirement — Interior lighting power
Young Suh
07/01/2024
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
07/01/2024
Special inspection requirement — Final
Young Suh
07/01/2024
Special inspection requirement — Lighting in dwelling units
Young Suh
07/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
07/01/2024
Special inspection requirement — Post-installed Anchors
Young Suh
12/26/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/11/2023
Permit issued — Plumbing
M00821376-S1-PL
Latest 60 of 197 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offQMB PLUMBING & HTG INC01/07/2026
DOB NOWSuspended ScaffoldPermit IssuedTRIBUTE RESTORATION INC10/03/2025
DOB NOWGeneral ConstructionSigned-offNEW RELIANT CONSTRUCTION09/08/2025
DOB NOWGeneral ConstructionPermit IssuedTRIBUTE RESTORATION INC04/25/2025
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP04/18/2025
DOB NOWSuspended ScaffoldPermit IssuedTRIBUTE RESTORATION INC04/17/2025
DOB NOWPlumbingSigned-offAUTHENTIC PLBG CORP04/02/2025
DOB NOWGeneral ConstructionSigned-offNEW RELIANT CONSTRUCTION01/28/2025
DOB NOWStructuralSigned-offNEW RELIANT CONSTRUCTION10/15/2024
DOB NOWMechanical SystemsSigned-offNEW RELIANT CONSTRUCTION10/15/2024
DOB NOWGeneral ConstructionSigned-offNEW RELIANT CONSTRUCTION10/11/2024
DOB NOWPlumbingSigned-offAUTHENTIC PLBG CORP12/11/2023
DOB NOWStructuralSigned-offNEW RELIANT CONSTRUCTION10/10/2023
DOB NOWMechanical SystemsSigned-offNEW RELIANT CONSTRUCTION10/10/2023
DOB NOWGeneral ConstructionPermit IssuedJSD CONSTRUCTION GROUP IN09/07/2023
DOB NOWSprinklersSigned-offQMB PLUMBING & HTG INC08/03/2023
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC08/03/2023
DOB NOWMechanical SystemsSigned-offNEW RELIANT CONSTRUCTION07/27/2023
DOB NOWStructuralSigned-offNEW RELIANT CONSTRUCTION07/26/2023
DOB NOWGeneral ConstructionSigned-offNEW RELIANT CONSTRUCTION07/26/2023
DOB NOWPlumbingSigned-offAAA TOTAL PLUMBING, INC08/18/2022
DOB NOWGeneral ConstructionSigned-offGURRI INSTALLATION08/17/2022
DOB NOWStructuralSigned-offUNITY CONSTRUCTION GROUP10/01/2021
DOB NOWSprinklersSigned-offLAWRENCE J. LEVINE09/21/2021
DOB NOWSprinklersSigned-offQMB PLUMBING & HTG INC02/16/2021
DOB NOWMechanical SystemsSigned-offUNITY CONSTRUCTION GROUP12/21/2020
DOB NOWStructuralSigned-offNEW RISING CONSTRUCTION09/19/2019
DOB NOWSprinklersSigned-offQMB PLUMBING & HTG INC09/18/2019
BISOTISSUEDUNITY CONSTRUCTION GROUP12/01/2020
BISMHISSUEDNEW RISING CONSTRUCTION09/01/2020
BISOTISSUEDNEW RISING CONSTRUCTION09/01/2020
BIS—ISSUEDNEW RISING CONSTRUCTION06/29/2020
BISPLISSUEDARIEL SERVICES INC02/16/2018
BISSDISSUEDARIEL SERVICES INC01/05/2016
BISOTISSUEDFOUNDATIONS INTERIOR DESIGN12/09/2015
BISPLISSUEDARIEL SERVICES INC11/05/2015
BISSDISSUEDARIEL SERVICES INC08/28/2015
BISEQISSUEDROCK GROUP NY CORP08/12/2015
BISSPISSUEDGO PRO FIRE PROTECTION C08/11/2015
BIS—ISSUEDFOUNDATIONS INTERIOR DESIGN06/22/2015
+ 29 more permits on file
1 project · most recent 08/20/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/20/2026Signed-offAUTHENTIC PLBG CORPGas, Water/Sanitary
7 projects · most recent 05/06/2025
General Wiring
FiledStatusContractorScope
05/06/2025CompleteHIGH QUALITY ELEC.OF NYC—
10/03/2023CompleteMAGNETIC ELECTRIC CORPGeneral Wiring
08/30/2022Permit IssuedLION HEART ELECTRIC CORPGeneral Wiring
02/04/2021CompleteKJK ELECTRIC INCGeneral Wiring
01/13/2021CompleteKLEINKNECHT ELEC. CO.,INCGeneral Wiring
12/22/2020CompleteDAVEN ELECTRIC CORP—
07/11/2020CompleteDAVEN ELECTRIC CORP—
1 project · most recent 04/17/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
04/17/2025Permit IssuedTRIBUTE RESTORATION INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
11/19/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/17/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/10/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/18/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/01/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/25/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/31/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/27/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/22/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 82
DateRequirementInspectorRole
08/27/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
05/22/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
05/22/2025Heating SystemsYoung Suhspecial
05/22/2025Mechanical SystemsYoung Suhspecial
05/22/2025Energy Code Compliance InspectionsYoung Suhprogress
05/22/2025FinalYoung Suhprogress
05/22/2025HVAC-R and service water piping design and insulationYoung Suhenergy_progress
04/04/2025Post-installed AnchorsFRANCISCO PEREZspecial
12/18/2024Tenant Protection Plan ComplianceARIEL GOLSHANspecial
11/16/2024Exterior Insulation and Finish Systems (EIFS)Eric Cowleyspecial
11/16/2024FinalEric Cowleyprogress
11/16/2024Structural Stability – Alterations of existing buildingsEric Cowleyspecial
08/29/2024Fire-Resistant Penetrations and JointsYoung Suhspecial
08/29/2024Sprinkler SystemsYoung Suhspecial
07/01/2024Fire-Resistant Penetrations and JointsYoung Suhspecial
07/01/2024Post-installed AnchorsYoung Suhspecial
07/01/2024Interior lighting powerYoung Suhenergy_progress
07/01/2024Lighting controlsYoung Suhenergy_progress
07/01/2024Energy Code Compliance InspectionsYoung Suhprogress
07/01/2024FinalYoung Suhprogress
07/01/2024Fire-Resistance Rated ConstructionYoung Suhprogress
07/01/2024Lighting in dwelling unitsYoung Suhenergy_progress
11/30/2023FinalYoung Suhprogress
11/30/2023Fire-Resistant Penetrations and JointsYoung Suhspecial
11/30/2023Post-installed AnchorsYoung Suhspecial
Latest 25 of 82.
▾Documents — 622 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch21
09/03/2026M00506840-I1Request digital key ↗
09/02/2026M00752216-I1Request digital key ↗
09/02/2026M00754033-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Structural4
09/05/2026M00212194-I1Request digital key ↗
08/15/2026M00212194-P2Request digital key ↗
08/15/2026M00205588-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
09/05/2026M00213838-P1Request digital key ↗
08/14/2026M00213838-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00212137-P1Request digital key ↗
08/15/2026M00212137-I1Request digital key ↗
▸Applications & Permits103
▸BISPLAN / WORK APPROVAL APPLICATION56
10/18/2021123800903Open ↗
07/09/2021123819591Open ↗
07/02/2021123819591Open ↗
Showing 3 of 56 on file for this type
▸BISWORK PERMIT APPLICATION44
12/01/2020123800903Open ↗
06/29/2020123819591Open ↗
07/29/2019123781611Open ↗
Showing 3 of 44 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
06/30/2020123819591Open ↗
Showing 1 of 2 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records9
▸BISZRD1-Zoning Resolution Determination3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISZoning Diagram (ZD1)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications159
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION64
09/26/2019123800903Open ↗
09/06/2019123819591Open ↗
08/16/2019123800903Open ↗
Showing 3 of 64 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature39
09/29/2026M00212194-P2Open ↗
09/29/2026M00212194-P2Open ↗
09/29/2026M00212194-P2Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature29
09/05/2026M00205588-I1Open ↗
09/05/2026M00213838-I1Open ↗
09/05/2026M00212194-P1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/29/2026M00212194-P2Open ↗
09/11/2026M00821617-P1Open ↗
09/11/2026M00821617-P1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
02/05/2018123205922Open ↗
Showing 1 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
02/05/2018123205922Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment43
▸BISEQUIPMENT USE APPLICATION/PERMIT14
11/28/2016121323914Open ↗
11/28/2016121323914Open ↗
11/28/2016121323914Open ↗
Showing 3 of 14 on file for this type
▸BISSELF-CERT PLUMBING NOTICE11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
12/08/2016121323914Open ↗
10/21/2016121734748Open ↗
07/08/2016121734748Open ↗
▸BISEQUIPMENT USE PERMITS2
11/28/2016121323914Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
06/07/2019123781611Open ↗
02/05/2018123205922Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection22
▸DOB NOWTenant Protection Plan8
09/05/2026M00212137-P1Open ↗
08/15/2026M00205588-I1Open ↗
08/15/2026M00212137-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTenant Protection Plan and Notes4
09/26/2019123800903Open ↗
08/06/2019123819591Open ↗
06/07/2019123781611Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST3
08/06/2019123819591Open ↗
03/17/2016121323914Open ↗
03/07/2016121323914Open ↗
▸BISST-1 Street Tree Checklist2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREE SUPPORTING DOCUMENT2
10/05/2016121325627Open ↗
10/05/2016121325627Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREES SITE PLAN1
10/05/2016121325627Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos31
▸DOB NOWOER: Notice to Proceed12
08/14/2026M00213838-I1Open ↗
08/13/2026M00821376-I1Open ↗
08/13/2026M00821635-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWOER: Notice of Satisfaction8
08/13/2026M00821617-I1Open ↗
08/13/2026M00823790-I1Open ↗
08/13/2026M00821665-I1Open ↗
Showing 3 of 8 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION4
11/30/2021123800903Open ↗
11/23/2021123819591Open ↗
04/16/2021123781611Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED4
09/30/2019123800903Open ↗
08/26/2019123819591Open ↗
06/13/2019123781611Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance24
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS14
09/06/2019123819591Open ↗
08/16/2019123800903Open ↗
08/06/2019123819591Open ↗
Showing 3 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
11/23/2021123819591Open ↗
04/15/2021123781611Open ↗
04/03/2018123205922Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
02/22/2023123819591Open ↗
11/30/2021123800903Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
02/22/2023123819591Open ↗
12/16/2021123800903Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/23/2021123819591Open ↗
04/15/2021123781611Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY8
11/23/2021123819591Open ↗
04/15/2021123781611Open ↗
Showing 2 of 8 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
01/12/2016121323914Open ↗
Showing 1 of 3 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
02/22/2023123819591Open ↗
11/30/2021123800903Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs55
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST23
12/16/2021123800903Open ↗
04/19/2021123781611Open ↗
04/03/2018123205922Open ↗
Showing 3 of 23 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION15
04/03/2018123205922Open ↗
11/28/2016121323914Open ↗
11/28/2016121325627Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
04/01/2022123819591Open ↗
07/09/2021123819591Open ↗
07/02/2021123819591Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSUPERSEDING LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026M01143420-I1Open ↗
▸Cost, Insurance & Ownership19
▸BISCOST AFFIDAVIT13
11/23/2021123819591Open ↗
04/15/2021123781611Open ↗
09/26/2019123800903Open ↗
Showing 3 of 13 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
02/22/2023123819591Open ↗
11/30/2021123800903Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms63
▸BISADDITIONAL INFORMATION44
11/12/2021123800903Open ↗
12/10/2020123781611Open ↗
12/07/2020123800903Open ↗
Showing 3 of 44 on file for this type
▸BISEFILING COVER SHEET13
08/16/2019123800903Open ↗
08/06/2019123819591Open ↗
06/07/2019123781611Open ↗
Showing 3 of 13 on file for this type
▸BISeFiling Job Application Cover Sheet5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISBOROUGH INTAKE FORM1
04/03/2018123205922Open ↗
▸Other Documents24
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION14
02/15/2018121323914Open ↗
11/28/2016121325627Open ↗
10/05/2016121325627Open ↗
Showing 3 of 14 on file for this type
▸BISENVIRONMENTAL(E) DEP NOTICE TO PROCEED4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPLOT DIAGRAM3
08/06/2019123819591Open ↗
11/28/2016121325627Open ↗
Showing 2 of 3 on file for this type
▸BIS* FEMA FORM (81-31): ELEVATION CERTIFICATE1
02/10/2016121323914Open ↗
▸DOB NOWCalculations1
08/13/2026M01206270-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01206270-I1Open ↗