← Back
Over six families without stores
2900 BRIGGS AVENUE
BRONX · BIN 2016913
💬 Discuss this project
1915Year Built
5Stories
C1Building Class
R7BZoning
22,080 sfGross Floor Area
22Units
Rent Stabilized11 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: 2900 BRIGGS AVENUE LLC · 4,930 sf lot · 4.48 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 41p · 1 filing · 2 docs
Floor 3
Floor 2
Floor 1
Cellar1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2900 BRIGGS AVENUE1607/08/2026
ARAMCO CONTRACTING LLC703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASR ENGINEERING PC205/12/2024
BAZINI ENGINEERING, P.C.209/16/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARAMCO CONTRACTING LLCGeneral Contractor603/21/2026
ZEESHAN CONSTRUCTION INCGeneral Contractor303/21/2026
RICHARD NEUElectrical103/21/2026
ARCO PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SYED ENGINEERING, P.C.7054105/12/2024
BAZINI ENGINEERING, P.C.1808109/16/2021
Building Lifecycle
All (76)Filed (4)Permit Issued (5)Signed Off (3)Violation (60)Inspection (2)Special Inspection (2)
08/21/2026
Violation issued (HPD, open)
C
08/21/2026
Violation issued (HPD, open)
B
08/21/2026
Violation issued (HPD, open)
B
05/22/2026
Violation issued (HPD, closed)
C
05/22/2026
Violation issued (HPD, closed)
A
05/22/2026
Violation issued (HPD, closed)
A
05/22/2026
Violation issued (HPD, closed)
C
05/22/2026
Violation issued (HPD, closed)
C
05/22/2026
Violation issued (HPD, closed)
C
05/22/2026
Violation issued (HPD, closed)
A
05/22/2026
Violation issued (HPD, closed)
A
05/22/2026
Violation issued (HPD, closed)
A
05/22/2026
Violation issued (HPD, closed)
C
05/22/2026
Violation issued (HPD, open)
C
05/22/2026
Violation issued (HPD, closed)
C
05/22/2026
Violation issued (HPD, closed)
C
05/22/2026
Violation issued (HPD, closed)
A
05/22/2026
Violation issued (HPD, open)
B
05/22/2026
Violation issued (HPD, open)
C
05/22/2026
Violation issued (HPD, closed)
C
05/22/2026
Violation issued (HPD, closed)
A
05/22/2026
Violation issued (HPD, open)
B
05/22/2026
Violation issued (HPD, closed)
A
07/29/2025
Signed off — Alteration
PROPOSED OF BRICKS REPLACEMENT OF PARAPET WALL TO BE DONE AS NEEDED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01043174-I1
06/04/2025
Violation issued (HPD, closed)
A
05/15/2024
Permit issued — General Construction
X01043174-I1-GC
05/12/2024
Filed — Alteration
PROPOSED OF BRICKS REPLACEMENT OF PARAPET WALL TO BE DONE AS NEEDED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01043174-I1
05/06/2024
Filed — Alteration
X01046114-I1
05/06/2024
Permit issued — Sidewalk Shed
X01046114-I1-SH
05/06/2024
Permit issued — Supported Scaffold
X01046114-I1-SF
04/17/2024
Violation issued (HPD, closed)
A
04/17/2024
Violation issued (HPD, closed)
B
04/17/2024
Violation issued (HPD, closed)
A
04/17/2024
Violation issued (HPD, closed)
A
04/17/2024
Violation issued (HPD, open)
C
04/02/2024
Violation issued (HPD, closed)
A
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/2023
Violation issued (HPD, closed)
A
09/09/2022
Signed off — Alteration
REPLACE BOILER AND OIL BURNER WITH BOILER AND GAS/OIL BURNER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00591310-I1
09/09/2022
Signed off — Alteration
INSTALL NEW GAS PIPING AND GAS METER FOR REPLACEMENT BOILER AND GAS/OIL BURNER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00591326-I1
09/07/2022
Violation issued (HPD, closed)
A
09/07/2022
Violation issued (HPD, closed)
A
09/07/2022
Violation issued (HPD, closed)
C
09/07/2022
Violation issued (HPD, closed)
B
09/07/2022
Violation issued (HPD, closed)
C
09/07/2022
Violation issued (HPD, closed)
C
09/07/2022
Violation issued (HPD, closed)
A
09/07/2022
Violation issued (HPD, closed)
A
09/07/2022
Violation issued (HPD, open)
C
06/01/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/25/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/20/2022
Violation issued (HPD, closed)
B
02/17/2022
Violation issued (HPD, closed)
A
09/17/2021
Permit issued — Plumbing
X00591326-I1-PL
09/17/2021
Permit issued — Boiler Equipment
X00591310-I1-BE
09/16/2021
Filed — Alteration
REPLACE BOILER AND OIL BURNER WITH BOILER AND GAS/OIL BURNER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00591310-I1
09/16/2021
Filed — Alteration
INSTALL NEW GAS PIPING AND GAS METER FOR REPLACEMENT BOILER AND GAS/OIL BURNER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00591326-I1
09/09/2021
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
09/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Bazini
08/20/2021
Violation issued (HPD, closed)
B
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offZEESHAN CONSTRUCTION INC05/15/2024
DOB NOWSidewalk ShedPermit IssuedARAMCO CONTRACTING LLC05/06/2024
DOB NOWSupported ScaffoldPermit IssuedARAMCO CONTRACTING LLC05/06/2024
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC09/17/2021
DOB NOWBoiler EquipmentSigned-offAPPROVED OIL OF BKLYN,INC09/17/2021
BISFBISSUEDBAYRIDGE FUEL CORP12/04/2001
3 projects · most recent 05/06/2024
Boiler Controls General Wiring
FiledStatusContractorScope
05/06/2024Permit IssuedRICHARD NEU—
06/16/2022CompleteDEMAND ELECTRIC INCBoiler Controls
04/11/2022CompleteOM ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/01/2022Pass-Final Boiler Equipment InspectionPassView ↗
05/25/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
09/09/2021HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
09/09/2021Fire-Resistant Penetrations and JointsJoseph Bazinispecial
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/25/2026X00591310-I1Request digital key ↗
08/25/2026X00591326-I1Request digital key ↗
08/21/2026X01046114-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026X00591310-I1Open ↗
08/25/2026X00591326-I1Open ↗
08/21/2026X01046114-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
09/03/2026X00591326-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/23/2026X00591310-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/25/2026X00591310-I1Open ↗
08/25/2026X00591326-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00591310-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00591310-I1Open ↗