2900 GOULDEN AVENUE · Bedford Park · BIN 2097317
💬 Discuss this project
1930Year Built
4Stories
W5Building Class
R6Zoning
1,237,424 sfGross Floor Area
9Units
LL97 Covered1 Open Violation ▸
City university · Owner of record: DORMITORY AUTHORITY OF THE STATE OF NEW YORK · 925,614 sf lot · 1.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentCivilGeneralOther
Permit Issued — active, not yet Signed-off
Floor 2Under Construction25p · 1 filing · 17 docs
Floor 1Under Construction41p · 4 filings · 20 docs
Site & exteriorUnder Construction135p · 3 filings · 20 docs
Filed — no permit issued10p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CUNY1009/13/2026
DASNY1907/08/2026
DORMITORY AUTH THE STATE OF NY203/21/2026
DORMITORY AUTHORITY STATE OF NEW1203/21/2026
DORMITORY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES203/21/2026
CONAPAC SERVICES DBA203/21/2026
JM ZONING, LLC.203/21/2026
SUPERSTRUCTURES ENG + ARCH203/21/2026
CONAPAC SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZHN CONTRACTING CORPGeneral Contractor1108/07/2026
ADVANCED SCAFFOLD SER.LLCGeneral Contractor807/08/2026
SCAFFOLD DISTRIBUTORS OFGeneral Contractor707/08/2026
SKYLINE ELEC'L CONTR CORPElectrical103/22/2026
BORDUCCI, PETERElectrical103/21/2026
JAYLEX NYC CORPGeneral Contractor104/09/2026
MAY, BRIANElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106408/26/2026
Building Lifecycle
All (53)Filed (10)Permit Issued (17)Signed Off (3)Violation (3)Inspection (2)Objection (1)Special Inspection (17)
08/27/2026
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2022 B.C
X01311982-I1
08/26/2026
Filed — Alteration
LC, Campus Bridge & Entry Plaza repairs at Concert Hall: Removal / replacement /repairs of waterproofing, expansion joints, concrete ramp & staircases, railings, slab-on-grade concrete, spalled and cracked concrete, sliding bearing, stucco & lights. Drain
X00996606-P2
08/12/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/06/2026
Permit issued — Protection and Mechanical Methods
X00996606-S1-PMM
08/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
08/06/2026
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
07/30/2026
Permit issued — General Construction
X00996606-I1-EA
07/30/2026
Permit issued — Earth Work
X00996606-I1-ST
07/30/2026
Permit issued — Construction Fence
X01300865-I1-FN
07/30/2026
Permit issued — Structural
X00996606-I1-GC
04/15/2026
Objection raised — Other
04/02/2026
Filed — Alteration
LC, Campus Bridge & Entry Plaza repairs at Concert Hall: Removal / replacement /repairs of waterproofing, expansion joints, concrete ramp & staircases, railings, slab-on-grade concrete, spalled and cracked concrete, sliding bearing, stucco & lights. Drain
X00996606-S1
03/24/2026
Filed — Alteration
APPLICATION FILE FOR INTERIOR RENOVATIONS AS PER PLAN. PARTITIONS, DOORS, FLOORS, WALLS AND CEILING. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY FILED.
X01343431-I1
03/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
01/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
01/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/07/2026
Special inspection requirement — Final
01/07/2026
Special inspection requirement — Masonry
12/15/2025
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2022 B.C
X01311982-I1
12/15/2025
Permit issued — Sidewalk Shed
X01311982-I1-SH
11/19/2025
Permit issued — Construction Fence
X01300865-I1-FN
11/18/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 2855 PAUL AVENUE BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X01300865-I1
11/07/2025
Permit issued — Structural
X00996606-I1-ST
11/05/2025
Permit issued — Earth Work
X00996606-I1-EA
10/01/2025
Permit issued — Structural
X00996606-I1-GC
09/25/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
09/25/2025
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
09/25/2025
Special inspection requirement — Final
Paul Millman
09/25/2025
Special inspection requirement — Exterior lighting power
GEORGE GHEBRYAL
09/25/2025
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
09/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
09/25/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
GEORGE GHEBRYAL
09/24/2025
Filed — Alteration
LC, Campus Bridge & Entry Plaza repairs at Concert Hall: Removal / replacement /repairs of waterproofing, expansion joints, concrete ramp & staircases, railings, slab-on-grade concrete, spalled and cracked concrete, sliding bearing, stucco & lights. Drain
X00996606-P1
05/15/2025
Filed — No Work
X01135626-I1
02/14/2024
Filed — Alteration
LC, Campus Bridge & Entry Plaza repairs at Concert Hall: Removal / replacement /repairs of waterproofing, expansion joints, concrete ramp & staircases, railings, slab-on-grade concrete, spalled and cracked concrete, sliding bearing, stucco & lights. Drain
X00996606-I1
01/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/06/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/20/2019
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS SHOWN ON DRAWINGS. THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2014 B.C
X00004077-I1
07/20/2019
Signed off — Alteration
INSTALLATION OF SIDEWLAK SHED AS SHOWN ON DRAWINGS. THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2014 B.C
X00066376-I1
03/28/2019
Permit issued — Sidewalk Shed
X00066376-I1-SH
12/19/2018
Permit issued — Sidewalk Shed
X00066376-I1-SH
12/11/2018
Permit issued — Sidewalk Shed
X00066376-I1-SH
08/01/2018
Filed — Alteration
INSTALLATION OF SIDEWLAK SHED AS SHOWN ON DRAWINGS. THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2014 B.C
X00066376-I1
08/01/2018
Permit issued — Sidewalk Shed
X00066376-I1-SH
07/30/2018
Special inspection requirement — Final
ALLEN PARMET
07/27/2018
Permit issued — Sidewalk Shed
X00004077-I1-SH
05/01/2018
Permit issued — Sidewalk Shed
X00004077-I1-SH
12/13/2017
Permit issued — Sidewalk Shed
X00004077-I1-SH
12/12/2017
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS SHOWN ON DRAWINGS. THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2014 B.C
X00004077-I1
12/06/2017
Special inspection requirement — Preliminary
ALLEN PARMET
12/06/2017
Special inspection requirement — Final
ALLEN PARMET
09/15/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedZHN CONTRACTING CORP08/06/2026
DOB NOWGeneral ConstructionPermit IssuedZHN CONTRACTING CORP07/30/2026
DOB NOWEarth WorkPermit IssuedZHN CONTRACTING CORP07/30/2026
DOB NOWConstruction FencePermit IssuedZHN CONTRACTING CORP07/30/2026
DOB NOWStructuralPermit IssuedZHN CONTRACTING CORP07/30/2026
DOB NOWSidewalk ShedSigned-offJAYLEX NYC12/15/2025
DOB NOWConstruction FencePermit IssuedZHN CONTRACTING CORP11/19/2025
DOB NOWStructuralPermit IssuedZHN CONTRACTING CORP11/07/2025
DOB NOWEarth WorkPermit IssuedZHN CONTRACTING CORP11/05/2025
DOB NOWStructuralPermit IssuedZHN CONTRACTING CORP10/01/2025
DOB NOWSidewalk ShedSigned-offADVANCED SCAFFOLD SER.LLC03/28/2019
DOB NOWSidewalk ShedSigned-offADVANCED SCAFFOLD SER.LLC12/19/2018
DOB NOWSidewalk ShedSigned-offADVANCED SCAFFOLD SER.LLC12/11/2018
DOB NOWSidewalk ShedSigned-offADVANCED SCAFFOLD SER.LLC08/01/2018
DOB NOWSidewalk ShedSigned-offSCAFFOLD DISTRIBUTORS OF07/27/2018
DOB NOWSidewalk ShedSigned-offSCAFFOLD DISTRIBUTORS OF05/01/2018
DOB NOWSidewalk ShedSigned-offSCAFFOLD DISTRIBUTORS OF12/13/2017
BISPLISSUEDLOUIS L.BUTTERMARK & SONS09/23/2020
BISOTISSUEDDMD CONTRACTING NY LLC02/04/2020
BISMHISSUEDDMD CONTRACTING NY LLC02/04/2020
BISOTISSUEDDMD CONTRACTING NY LLC02/04/2020
BISOTISSUEDDMD CONTRACTING NY LLC06/03/2019
BISOTISSUEDDMD CONTRACTING NY LLC06/03/2019
BISMHISSUEDDMD CONTRACTING NY LLC06/03/2019
BISPLISSUEDLOUIS L.BUTTERMARK & SONS12/24/2018
BISEQISSUEDDMD CONTRACTING NY LLC12/12/2018
BISOTRE-ISSUEDDMD CONTRACTING NY LLC09/06/2018
BISOTISSUEDDMD CONTRACTING NY LLC09/06/2018
BISOTISSUEDDMD CONTRACTING NY LLC09/06/2018
BISOTISSUEDDMD CONTRACTING NY LLC09/06/2018
BISSPISSUEDAGGRESSIVE FIRE PROT LLC07/10/2018
BISOTISSUEDDMD CONTRACTING NY LLC06/15/2018
BISOTISSUEDDMD CONTRACTING NY LLC06/15/2018
BISOTISSUEDDMD CONTRACTING NY LLC06/12/2018
BISOTISSUEDDMD CONTRACTING NY LLC06/12/2018
BISOTISSUEDDMD CONTRACTING NY LLC06/12/2018
BISOTISSUEDDMD CONTRACTING NY LLC06/12/2018
BISMHISSUEDDMD CONTRACTING NY LLC06/12/2018
BISOTISSUEDDMD CONTRACTING NY LLC04/17/2018
BISOTISSUEDDMD CONTRACTING NY LLC04/17/2018
+ 12 more permits on file
3 projects · most recent 03/10/2026
General Wiring
FiledStatusContractorScope
03/10/2026Permit IssuedLABCO ELETRT CONTNG CORPGeneral Wiring
12/11/2019CompleteSKYLINE ELEC'L CONTR CORPGeneral Wiring
05/16/2019CompleteTHYSSENKRUPP ELEVATOR CO—
1 project · most recent 08/26/2026
Concrete
FiledStatusContractorScope
08/26/2026Permit IssuedZHN CONTRACTING CORPConcrete
1 project · most recent 11/18/2025
Fence
FiledStatusContractorScope
11/18/2025Permit IssuedZHN CONTRACTING CORPFence
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/12/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/11/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
08/06/2026Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
08/06/2026Subgrade InspectionsGEORGE GHEBRYALspecial
03/03/2026Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
01/07/2026Fire-Resistance Rated Construction—progress
01/07/2026Fire-Resistant Penetrations and Joints—special
01/07/2026Final—progress
01/07/2026Masonry—special
09/25/2025Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
09/25/2025Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
09/25/2025FinalPaul Millmanprogress
09/25/2025Exterior lighting powerGEORGE GHEBRYALenergy_progress
09/25/2025Post-installed AnchorsGEORGE GHEBRYALspecial
09/25/2025Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
09/25/2025Alternative Materials - OTCR Buildings Bulletin NumberGEORGE GHEBRYALspecial
07/30/2018FinalALLEN PARMETprogress
12/06/2017PreliminaryALLEN PARMETprogress
12/06/2017FinalALLEN PARMETprogress
▾Documents — 315 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch9
08/26/2026X00004077-I1Request digital key ↗
08/26/2026X00066376-I1Request digital key ↗
08/17/2026X01300865-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/19/2026X01135626-I1Request digital key ↗
▸Applications & Permits63
▸BISPLAN / WORK APPROVAL APPLICATION37
11/19/2025220743391Open ↗
05/09/2025220743391Open ↗
03/23/2022220637988Open ↗
Showing 3 of 37 on file for this type
▸BISWORK PERMIT APPLICATION26
08/19/2019220518116Open ↗
12/26/2018220517590Open ↗
12/12/2018220517590Open ↗
Showing 3 of 26 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
06/20/2017220517590Open ↗
▸Seals & Professional Certifications53
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION25
04/21/2020240099567Open ↗
02/20/2020220518116Open ↗
07/06/2018220518116Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/19/2026X01135626-I1Open ↗
08/17/2026X01300865-I1Open ↗
08/17/2026X01311982-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/25/2026X00996606-I1Open ↗
09/25/2026X00996606-I1Open ↗
09/02/2026X00066376-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/25/2026X00996606-I1Open ↗
09/25/2026X00996606-I1Open ↗
09/23/2026X00996606-P2Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
03/21/2018220637988Open ↗
12/14/2016220564510Open ↗
Showing 2 of 3 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
03/21/2018220637988Open ↗
12/14/2016220564510Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment13
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
03/23/2020240099567Open ↗
01/30/2017220518116Open ↗
03/11/2016220517590Open ↗
Showing 3 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
04/09/2021220518269Open ↗
Showing 1 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING3
02/02/2021220517590Open ↗
Showing 1 of 3 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
08/19/2020220517590Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST3
08/19/2020220517590Open ↗
06/26/2020220517590Open ↗
06/20/2017220517590Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
08/19/2020220517590Open ↗
▸Environmental & Asbestos14
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
07/06/2018220518116Open ↗
04/17/2018220635258Open ↗
01/03/2018220517590Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
12/14/2016220564510Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026X00996606-I1Open ↗
08/17/2026X00996606-P1Open ↗
▸BISDEP FORM V5 - ASBESTOS VARIANCE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
01/03/2018220517590Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/17/2026X01343431-I1Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
03/15/2018220635258Open ↗
12/22/2017220517590Open ↗
12/22/2017220517590Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
07/19/2020220517590Open ↗
03/02/2017220163472Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/19/2020220517590Open ↗
▸BISLIGHTING CONTROLS1
08/19/2020220517590Open ↗
▸BIS* HVAC INSULATION AND SEALING1
08/19/2020220517590Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/19/2020220517590Open ↗
▸BISFENESTRATION AIR LEAKAGE1
08/19/2020220517590Open ↗
▸Inspections & Test Reports25
▸BISTECHNICAL REPORT: RESPONSIBILITY7
01/07/2022220637988Open ↗
12/17/2021220637988Open ↗
03/31/2021220635258Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX4
04/17/2018220635258Open ↗
02/23/2018220517590Open ↗
12/22/2017220517590Open ↗
Showing 3 of 4 on file for this type
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT2
01/26/2021220635258Open ↗
12/08/2020220517590Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
04/17/2018220635258Open ↗
12/22/2017220517590Open ↗
▸BISPOST-INSTALLED ANCHORS1
08/19/2020220517590Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
08/19/2020220517590Open ↗
▸BISMASTIC AND INTUMESCENT FIRE-RESISTANT COATINGS1
08/19/2020220517590Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
08/19/2020220517590Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
08/19/2020220517590Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
08/19/2020220517590Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
03/31/2021220635258Open ↗
▸BISMECHANICAL SYSTEMS1
08/19/2020220517590Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
08/19/2020220517590Open ↗
▸BISDEEP FOUNDATIONS / PILES1
03/31/2021220635258Open ↗
▸Approvals, Objections & Sign-offs42
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
03/25/2022220637988Open ↗
07/19/2021220517590Open ↗
04/11/2021220518269Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
11/19/2025220743391Open ↗
10/07/2025220743391Open ↗
10/07/2025220743391Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/19/2026X01135626-I1Open ↗
08/17/2026X01343431-I1Open ↗
08/17/2026X00996606-P2Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSUPERSEDING LETTER4
09/06/2018220635258Open ↗
09/06/2018220637988Open ↗
09/06/2018220517590Open ↗
Showing 3 of 4 on file for this type
▸BIS__APPLICANT SHALL PROVIDE 1ACP21 FORM PRIOR TO SIGN OFF TRU5131BX171
08/19/2020220517590Open ↗
▸Cost, Insurance & Ownership24
▸BISCOST AFFIDAVIT18
05/01/2020220518116Open ↗
04/21/2020240099567Open ↗
03/28/2018220635258Open ↗
Showing 3 of 18 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
03/25/2022220637988Open ↗
01/26/2021220635258Open ↗
08/19/2020220517590Open ↗
Showing 3 of 4 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
06/13/2018220517590Open ↗
12/22/2017220517590Open ↗
▸Filing & Intake Forms27
▸BISEFILING COVER SHEET14
05/09/2025220743391Open ↗
03/21/2018220637988Open ↗
03/15/2018220635258Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION9
10/07/2025220743391Open ↗
05/17/2021220517590Open ↗
08/18/2020220517590Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM3
04/21/2020240099567Open ↗
04/09/2020240099567Open ↗
11/13/2019240099567Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents4
▸BISSTRUCTURAL COLD-FORMED STEEL1
08/19/2020220517590Open ↗
▸BISMAINTENANCE INFORMATION1
08/19/2020220517590Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
08/19/2020220517590Open ↗
▸BISSupporting Document: Fee Exempt1
06/09/2025220743391Open ↗