Miscellaneous two family
291 ADA DRIVE
STATEN ISLAND · Mariner's Harbor-Arlington-Graniteville · BIN 5130789
💬 Discuss this project
1983Year Built
2Stories
B9Building Class
R3-2Zoning
2,121 sfGross Floor Area
2Units
Miscellaneous two family · 4,367 sf lot · 0.49 FAR built · Flood zone X500
Locations of Work
Electrical
Roof4p · 1 filing · 14 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC207/28/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272207/28/2025
Building Lifecycle
All (13)Filed (2)Permit Issued (1)Special Inspection (10)
07/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
07/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
07/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
07/29/2025
Special inspection requirement — Final
Walid Abdulla
07/29/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
07/28/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01211060-P1
06/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
06/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
06/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
06/16/2025
Special inspection requirement — Final
Walid Abdulla
06/16/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
04/24/2025
Permit issued — Solar
S01211060-I1-SL
04/21/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01211060-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC04/24/2025
1 project · most recent 04/21/2025
FiledStatusContractorScope
04/21/2025CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 07/28/2025
FiledStatusContractorScope
07/28/2025Signed-offSUNRUN INSTALLATION SVC42 panels, 17.22 kw, 443.52 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
07/29/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
07/29/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
07/29/2025Energy Code Compliance InspectionsWalid Abdullaprogress
07/29/2025FinalWalid Abdullaprogress
07/29/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
06/16/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
06/16/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
06/16/2025Energy Code Compliance InspectionsWalid Abdullaprogress
06/16/2025FinalWalid Abdullaprogress
06/16/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 14 on file (BIS + DOB NOW)
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026S01211060-I1Open ↗
09/01/2026S01211060-I1Open ↗
09/01/2026S01211060-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026S01211060-I1Open ↗
09/01/2026S01211060-I1Open ↗
09/01/2026S01211060-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026S01211060-P1Open ↗
08/13/2026S01211060-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026S01211060-P1Open ↗
08/13/2026S01211060-I1Open ↗