Two family frame
291 ALTER AVENUE
STATEN ISLAND · BIN 5049288
💬 Discuss this project
2021Year Built
2Stories
B2Building Class
R3XZoning
2,410 sfGross Floor Area
2Units
Two family frame · 4,042 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2p · 1 filing · 20 docs
Floor 239p · 2 filings · 20 docs
Floor 161p · 3 filings · 20 docs
Basement41p · 2 filings · 20 docs
Site & exterior5p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
291 Alter Ave2107/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rogers Calvanico Group705/02/2022
William Montague Engineering105/01/2020
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DeltamerGeneral Contractor407/08/2026
DeltamerScaffold203/21/2026
Sken ServicesScaffold203/21/2026
A & R Electrical ContractingElectrical103/22/2026
Flow-Right Plumbing & HeatingPlumbing107/08/2026
K.M.D. Mechanical 1443Plumbing107/08/2026
Sken ServicesGeneral Contractor110/14/2020
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738204/05/2022
Building Lifecycle
11/10/2022
Signed off — New Building
9' TOTAL CURB CUT
S00518592-S2
11/10/2022
Signed off — New Building
9' TOTAL CURB CUT
S00518592-S1
07/09/2022
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
S00518592-I1-GC-CX
05/17/2022
Signed off — Alteration
S00344608-I1
05/12/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
56 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offDeltamer04/21/2022
DOB NOWCurb CutSigned-offDeltamer04/21/2022
DOB NOWPlumbingSigned-offK.M.D. Mechanical 144309/29/2021
DOB NOWPlumbingSigned-offFlow-Right Plumbing & Heating07/20/2021
DOB NOWGeneral ConstructionPermit IssuedDeltamer07/09/2021
DOB NOWConstruction FenceSigned-offDeltamer07/07/2021
DOB NOWConstruction FenceSigned-offTT & T Construction07/30/2020
BIS—ISSUEDSken Services10/14/2020
1 project · most recent 10/18/2021
General Wiring
FiledStatusContractorScope
10/18/2021CompleteA & R Electrical ContractingGeneral Wiring
1 project · most recent 05/02/2022
FiledStatusContractorScope
05/02/2022Signed-offDeltamer—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/12/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
04/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/08/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/09/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/23/2021Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/20/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/20/2021Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
04/20/2022Concrete - Cast-In-Placeanthony santorospecial
04/20/2022Fire-Resistant Penetrations and Jointsanthony santorospecial
04/20/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
04/20/2022Mechanical Systemsanthony santorospecial
04/20/2022Subgrade Inspectionsanthony santorospecial
04/20/2022Subsurface Investigations (Borings/Test Pits)anthony santorospecial
04/20/2022Structural Wood Frameanthony santoroprogress
04/20/2022Energy Code Compliance Inspectionsanthony santoroprogress
04/20/2022Footing and Foundationanthony santoroprogress
04/20/2022Finalanthony santoroprogress
04/20/2022Fire-Resistance Rated Constructionanthony santoroprogress
04/20/2022Fenestration air leakageanthony santoroenergy_progress
04/20/2022Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
04/20/2022Protection of exposed foundation insulationanthony santoroenergy_progress
04/20/2022Maintenance informationanthony santoroenergy_progress
04/20/2022Fenestration areasanthony santoroenergy_progress
04/20/2022Duct leakage testing, insulation and designanthony santoroenergy_progress
04/20/2022HVAC-R and service water heating system controlsanthony santoroenergy_progress
04/20/2022Ventilation and air distribution systemanthony santoroenergy_progress
04/20/2022HVAC-R and service water piping design and insulationanthony santoroenergy_progress
04/20/2022Meteringanthony santoroenergy_progress
04/20/2022Electric vehicle service equipment requirementsanthony santoroenergy_progress
04/20/2022Air barrier - visual inspectionanthony santoroenergy_progress
04/20/2022Interior lighting poweranthony santoroenergy_progress
04/20/2022Insulation placement and R valuesanthony santoroenergy_progress
Latest 25 of 56.