← Back
Condo, residential unit in 1-3 story building
Two Bridges Condominium
291 CHERRY STREET · BIN 1083382
💬 Discuss this project
1986Year Built
3Stories
R3Building Class
C6-4Zoning
56,553 sfGross Floor Area
57Units
LL97 CoveredRent Stabilized20 Open Violations ▸
Condo, residential unit in 1-3 story building · 42,811 sf lot · 1.32 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ALL AREA REALTY SERVICES1407/08/2026
TWO BRIDGES TOWNHOUSE CONDO903/22/2026
OWNER OF 305 CHERRY ST403/22/2026
TWO BRIDGES CONDOMINIUM403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EN-POWER GROUP909/23/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J A EXPEDITING1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CC CONTROLLED PLBG CO INCPlumbing207/08/2026
ASR ENGINEERING PCElectrical103/21/2026
C C CONTROLLED COMBUSTIONGeneral Contractor107/08/2026
CC CONTROLLED PLBG CO.,INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GROUP-S LLC5216507/12/2021
Building Lifecycle
All (57)Filed (9)Permit Issued (4)Signed Off (3)Violation (11)Special Inspection (30)
05/09/2023
Signed off — Alteration
Installation of hot and cold water lines. Installation of RPZ. Installation of gas piping in conjunction with boiler installation filed under related application #140964197, (ME) M00410142-I1, (BE)M00402879-I1 . No change in use, egress, or occupancy
M00402661-I1
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/27/2022
Special inspection requirement — HVAC insulation and sealing
MICHAEL SCORRANO
09/27/2022
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL SCORRANO
09/27/2022
Special inspection requirement — HVAC and service water heating system controls
MICHAEL SCORRANO
09/27/2022
Special inspection requirement — Maintenance information
MICHAEL SCORRANO
09/23/2022
Filed — Alteration
Installation of hot and cold water lines. Installation of RPZ. Installation of gas piping in conjunction with boiler installation filed under related application #140964197, (ME) M00410142-I1, (BE)M00402879-I1 . No change in use, egress, or occupancy
M00402661-P3
07/15/2022
Signed off — Alteration
FILING APPLICATION FOR THE INSTALLATION OF (4) BOILERS IN CELLAR.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00402879-I1
07/06/2022
Signed off — Alteration
filing application to remove existing steam boiler associated breeching upto chimney. Provide new directed ventilated boiler intake air duct and breeching. provide one new inline draft inducer. all work as per plans filed herewith.
M00410142-I1
02/09/2022
Violation issued (ECB, closed)
Boilers
01/27/2022
Filed — Alteration
Installation of hot and cold water lines. Installation of RPZ. Installation of gas piping in conjunction with boiler installation filed under related application #140964197, (ME) M00410142-I1, (BE)M00402879-I1 . No change in use, egress, or occupancy
M00402661-P2
12/10/2021
Special inspection requirement — HVAC insulation and sealing
MICHAEL SCORRANO
12/10/2021
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL SCORRANO
12/10/2021
Special inspection requirement — Maintenance information
MICHAEL SCORRANO
12/10/2021
Special inspection requirement — HVAC and service water heating system controls
MICHAEL SCORRANO
07/29/2021
Permit issued — Plumbing
M00402661-I1-PL
07/14/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL SCORRANO
07/14/2021
Special inspection requirement — Heating Systems
MICHAEL SCORRANO
07/14/2021
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
MICHAEL SCORRANO
07/14/2021
Special inspection requirement — HVAC and service water heating equipment
MICHAEL SCORRANO
07/14/2021
Special inspection requirement — HVAC and service water heating system controls
MICHAEL SCORRANO
07/14/2021
Special inspection requirement — Maintenance information
MICHAEL SCORRANO
07/14/2021
Special inspection requirement — Heating Systems
MICHAEL SCORRANO
07/14/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL SCORRANO
07/14/2021
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
MICHAEL SCORRANO
07/14/2021
Special inspection requirement — Mechanical Systems
MICHAEL SCORRANO
07/14/2021
Special inspection requirement — Final
MICHAEL SCORRANO
07/14/2021
Special inspection requirement — Shutoff dampers
MICHAEL SCORRANO
07/14/2021
Special inspection requirement — HVAC insulation and sealing
MICHAEL SCORRANO
07/14/2021
Special inspection requirement — Maintenance information
MICHAEL SCORRANO
07/12/2021
Filed — Alteration
Installation of hot and cold water lines. Installation of RPZ. Installation of gas piping in conjunction with boiler installation filed under related application #140964197, (ME) M00410142-I1, (BE)M00402879-I1 . No change in use, egress, or occupancy
M00402661-P1
07/12/2021
Filed — Alteration
FILING APPLICATION FOR THE INSTALLATION OF (4) BOILERS IN CELLAR.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00402879-P1
07/12/2021
Filed — Alteration
filing application to remove existing steam boiler associated breeching upto chimney. Provide new directed ventilated boiler intake air duct and breeching. provide one new inline draft inducer. all work as per plans filed herewith.
M00410142-P2
05/14/2021
Special inspection requirement — Final
MICHAEL SCORRANO
05/14/2021
Special inspection requirement — Maintenance information
MICHAEL SCORRANO
05/14/2021
Special inspection requirement — HVAC insulation and sealing
MICHAEL SCORRANO
05/14/2021
Special inspection requirement — Shutoff dampers
MICHAEL SCORRANO
05/14/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL SCORRANO
05/14/2021
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
MICHAEL SCORRANO
05/14/2021
Special inspection requirement — Heating Systems
MICHAEL SCORRANO
05/14/2021
Special inspection requirement — Maintenance information
MICHAEL SCORRANO
12/08/2020
Filed — Alteration
filing application to remove existing steam boiler associated breeching upto chimney. Provide new directed ventilated boiler intake air duct and breeching. provide one new inline draft inducer. all work as per plans filed herewith.
M00410142-P1
10/20/2020
Permit issued — Mechanical Systems
M00410142-I1-MS
10/14/2020
Permit issued — Boiler Equipment
M00402879-I1-BE
10/13/2020
Permit issued — Plumbing
M00402661-I1-PL
10/12/2020
Filed — Alteration
FILING APPLICATION FOR THE INSTALLATION OF (4) BOILERS IN CELLAR.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00402879-I1
10/09/2020
Filed — Alteration
Installation of hot and cold water lines. Installation of RPZ. Installation of gas piping in conjunction with boiler installation filed under related application #140964197, (ME) M00410142-I1, (BE)M00402879-I1 . No change in use, egress, or occupancy
M00402661-I1
10/09/2020
Filed — Alteration
filing application to remove existing steam boiler associated breeching upto chimney. Provide new directed ventilated boiler intake air duct and breeching. provide one new inline draft inducer. all work as per plans filed herewith.
M00410142-I1
10/25/2019
Violation issued (HPD, closed)
I
10/24/2016
Violation issued (HPD, closed)
I
08/06/2010
Violation issued (ECB, closed)
Boilers
08/06/2010
Violation issued (ECB, closed)
Boilers
08/06/2010
Violation issued (ECB, closed)
Boilers
08/06/2010
Violation issued (ECB, closed)
Boilers
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCC CONTROLLED PLBG CO.,IN07/29/2021
DOB NOWMechanical SystemsSigned-offC C CONTROLLED COMBUSTION10/20/2020
DOB NOWBoiler EquipmentSigned-offCC CONTROLLED PLBG CO INC10/14/2020
DOB NOWPlumbingSigned-offCC CONTROLLED PLBG CO INC10/13/2020
BISOTISSUEDARTISAN PRESERVATION LLC04/15/2016
BISEQISSUEDEVEREST SCAFFOLDING INC03/08/2016
BISEQISSUEDEVEREST SCAFFOLDING INC03/08/2016
BISOTISSUEDCUSTOMBUILT HOMES INC05/15/2013
1 project · most recent 10/22/2020
FiledStatusContractorScope
10/22/2020CompleteKRAFT ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
09/27/2022HVAC insulation and sealing MICHAEL SCORRANOenergy_progress
09/27/2022Energy Code Compliance InspectionsMICHAEL SCORRANOprogress
09/27/2022HVAC and service water heating system controls MICHAEL SCORRANOenergy_progress
09/27/2022Maintenance informationMICHAEL SCORRANOenergy_progress
12/10/2021HVAC insulation and sealing MICHAEL SCORRANOenergy_progress
12/10/2021Energy Code Compliance InspectionsMICHAEL SCORRANOprogress
12/10/2021Maintenance informationMICHAEL SCORRANOenergy_progress
12/10/2021HVAC and service water heating system controls MICHAEL SCORRANOenergy_progress
07/14/2021Fire-Resistant Penetrations and JointsMICHAEL SCORRANOspecial
07/14/2021Heating SystemsMICHAEL SCORRANOspecial
07/14/2021Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)MICHAEL SCORRANOspecial
07/14/2021HVAC and service water heating equipment MICHAEL SCORRANOenergy_progress
07/14/2021HVAC and service water heating system controls MICHAEL SCORRANOenergy_progress
07/14/2021Maintenance informationMICHAEL SCORRANOenergy_progress
07/14/2021Heating SystemsMICHAEL SCORRANOspecial
07/14/2021Fire-Resistant Penetrations and JointsMICHAEL SCORRANOspecial
07/14/2021Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)MICHAEL SCORRANOspecial
07/14/2021Mechanical SystemsMICHAEL SCORRANOspecial
07/14/2021FinalMICHAEL SCORRANOprogress
07/14/2021Shutoff dampersMICHAEL SCORRANOenergy_progress
07/14/2021HVAC insulation and sealing MICHAEL SCORRANOenergy_progress
07/14/2021Maintenance informationMICHAEL SCORRANOenergy_progress
05/14/2021FinalMICHAEL SCORRANOprogress
05/14/2021Maintenance informationMICHAEL SCORRANOenergy_progress
05/14/2021HVAC insulation and sealing MICHAEL SCORRANOenergy_progress
Latest 25 of 44.
▾Documents — 154 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch - Plumbing4
09/04/2026M00402661-P3Request digital key ↗
09/04/2026M00402661-P2Request digital key ↗
09/04/2026M00402661-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/04/2026M00410142-I1Request digital key ↗
08/15/2026M00410142-P1Request digital key ↗
08/15/2026M00410142-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/04/2026M00402879-I1Request digital key ↗
08/15/2026M00402879-P1Request digital key ↗
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION8
08/11/2021140964197Open ↗
11/05/2020140964197Open ↗
10/09/2020140964197Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION4
04/20/2016122565125Open ↗
03/07/2016140466797Open ↗
03/07/2016140466751Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISFLOOD ZONE DESIGN CERTIFICATION1
10/09/2020140964197Open ↗
▸Seals & Professional Certifications73
▸DOB NOWProgress Inspector Seal & Signature26
09/23/2026M00402879-I1Open ↗
09/23/2026M00402879-I1Open ↗
09/23/2026M00402879-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/23/2026M00402879-I1Open ↗
09/23/2026M00402879-I1Open ↗
09/23/2026M00402879-I1Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
12/14/2016122565125Open ↗
12/14/2016122565125Open ↗
10/24/2016140466797Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/04/2026M00402661-I1Open ↗
09/04/2026M00402661-P1Open ↗
09/04/2026M00402661-P3Open ↗
Showing 3 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
10/09/2020140964197Open ↗
03/07/2016140466797Open ↗
03/07/2016140466751Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
10/09/2020140964197Open ↗
03/07/2016140466797Open ↗
03/07/2016140466751Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
10/09/2020140964197Open ↗
03/07/2016140466797Open ↗
03/07/2016140466751Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING2
04/30/2013121496229Open ↗
11/14/2012121496229Open ↗
▸Safety & Tenant Protection13
▸DOB NOWTenant Protection Plan9
09/04/2026M00402879-I1Open ↗
08/13/2026M00402661-P1Open ↗
08/13/2026M00410142-P1Open ↗
Showing 3 of 9 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES3
10/09/2020140964197Open ↗
03/07/2016140466797Open ↗
03/07/2016140466751Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
05/16/2013121496229Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/04/2026M00402661-P3Open ↗
09/04/2026M00402661-P2Open ↗
09/04/2026M00402661-P1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
10/09/2020140964197Open ↗
03/07/2016140466797Open ↗
11/09/2015122565125Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
12/14/2016122565125Open ↗
03/14/2016122565125Open ↗
11/09/2015122565125Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/09/2020140964197Open ↗
▸BISNYCECC ANALYSIS1
10/09/2020140964197Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
03/07/2016140466751Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/09/2020140964197Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/14/2016122565125Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00402879-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
10/09/2020140964197Open ↗
03/07/2016140466797Open ↗
03/07/2016140466751Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
12/14/2016122565125Open ↗
10/24/2016140466797Open ↗
10/14/2016140466751Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
11/14/2012121496229Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
10/09/2020140964197Open ↗
12/14/2016122565125Open ↗
11/09/2015122565125Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms8
▸BISEFILING JOB APPLICATION COVER SHEET3
10/09/2020140964197Open ↗
03/07/2016140466797Open ↗
03/07/2016140466751Open ↗
▸BISADDITIONAL INFORMATION3
05/05/2016140466797Open ↗
08/02/2013121496229Open ↗
04/30/2013121496229Open ↗
▸BISEFILING COVER SHEET2
11/09/2015122565125Open ↗
11/14/2012121496229Open ↗
▸Other Documents2
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
10/09/2020140964197Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
05/16/2013121496229Open ↗