← Back
Primarily 2 family with 1 store or office
291 MANHATTAN AVENUE
BROOKLYN · East Williamsburg · BIN 3068851
💬 Discuss this project
1910Year Built
3Stories
S2Building Class
R6BZoning
2,640 sfGross Floor Area
3Units
2 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 291 MANHATTAN AVENUE LLC · 1,480 sf lot · 1.78 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
291MANHATTAN AVE307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRANK J QUATELA ARCHITECT P.C410/20/2022
ENTHINK ENGINEERS LLC106/24/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FRANK J QUATELA ARCHITECT P C603/21/2026
Manetta architecture design pllc203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ONE CAPITAL RENOVATION COGeneral Contractor107/08/2026
PHOENIX SUTTON STR INCGeneral Contractor107/08/2026
TRI STATE PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FRANK J. QUATELA, ARCHITE1632410/20/2022
Building Lifecycle
All (38)Filed (5)Permit Issued (3)Signed Off (3)Violation (5)Inspection (4)Special Inspection (18)
12/01/2022
Signed off — Alteration
INTERIOR RENOVATION TO REPAIR FIRE DAMAGE TO EXISTING MIXED-USE BUILDING. REPLACEMENT OF EXISTING ROOF FINISH, REMOVAL OF EXTERIOR PANEL TO BRICK, NEW GYPSUM BOARD, FINISHES, DOORS, WINDOWS, KITCHEN CABINETS, . NO CHANGE TO USE, EGRESS OR OCCUPANCY
B00697903-I1
11/30/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/21/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/20/2022
Filed — Alteration
INTERIOR RENOVATION TO REPAIR FIRE DAMAGE TO EXISTING MIXED-USE BUILDING. REPLACEMENT OF EXISTING ROOF FINISH, REMOVAL OF EXTERIOR PANEL TO BRICK, NEW GYPSUM BOARD, FINISHES, DOORS, WINDOWS, KITCHEN CABINETS, . NO CHANGE TO USE, EGRESS OR OCCUPANCY
B00697903-P2
10/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANK QUATELA
10/20/2022
Special inspection requirement — Fire-Resistance Rated Construction
FRANK QUATELA
10/20/2022
Special inspection requirement — Energy Code Compliance Inspections
FRANK QUATELA
10/20/2022
Special inspection requirement — Fenestration air leakage
FRANK QUATELA
10/20/2022
Special inspection requirement — Air barrier - visual inspection
FRANK QUATELA
10/20/2022
Special inspection requirement — Lighting controls
FRANK QUATELA
10/20/2022
Special inspection requirement — Interior lighting power
FRANK QUATELA
10/20/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
FRANK QUATELA
09/16/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B00763821-I1
08/30/2022
Special inspection requirement — Interior lighting power
FRANK QUATELA
08/30/2022
Special inspection requirement — Lighting controls
FRANK QUATELA
08/30/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
FRANK QUATELA
08/30/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANK QUATELA
08/30/2022
Special inspection requirement — Energy Code Compliance Inspections
FRANK QUATELA
08/30/2022
Special inspection requirement — Fire-Resistance Rated Construction
FRANK QUATELA
08/30/2022
Special inspection requirement — Fenestration air leakage
FRANK QUATELA
08/30/2022
Special inspection requirement — Air barrier - visual inspection
FRANK QUATELA
07/05/2022
Signed off — Alteration
INTERIOR RENOVATION TO REPAIR FIRE DAMAGE TO EXISTING MIXED-USE BUILDING. REPLACEMENT OF EXISTING ROOF FINISH, REMOVAL OF EXTERIOR PANEL TO BRICK, NEW GYPSUM BOARD, FINISHES, DOORS, WINDOWS, KITCHEN CABINETS, . NO CHANGE TO USE, EGRESS OR OCCUPANCY
B00697903-S1
06/27/2022
Permit issued — Sidewalk Shed
B00763821-I1-SH
06/27/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/24/2022
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B00763821-I1
06/24/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/09/2022
Filed — Alteration
INTERIOR RENOVATION TO REPAIR FIRE DAMAGE TO EXISTING MIXED-USE BUILDING. REPLACEMENT OF EXISTING ROOF FINISH, REMOVAL OF EXTERIOR PANEL TO BRICK, NEW GYPSUM BOARD, FINISHES, DOORS, WINDOWS, KITCHEN CABINETS, . NO CHANGE TO USE, EGRESS OR OCCUPANCY
B00697903-P1
03/23/2022
Permit issued — Plumbing
B00697903-S1-PL
03/18/2022
Permit issued — General Construction
B00697903-I1-GC
03/16/2022
Filed — Alteration
INTERIOR RENOVATION TO REPAIR FIRE DAMAGE TO EXISTING MIXED-USE BUILDING. REPLACEMENT OF EXISTING ROOF FINISH, REMOVAL OF EXTERIOR PANEL TO BRICK, NEW GYPSUM BOARD, FINISHES, DOORS, WINDOWS, KITCHEN CABINETS, . NO CHANGE TO USE, EGRESS OR OCCUPANCY
B00697903-S1
03/15/2022
Filed — Alteration
INTERIOR RENOVATION TO REPAIR FIRE DAMAGE TO EXISTING MIXED-USE BUILDING. REPLACEMENT OF EXISTING ROOF FINISH, REMOVAL OF EXTERIOR PANEL TO BRICK, NEW GYPSUM BOARD, FINISHES, DOORS, WINDOWS, KITCHEN CABINETS, . NO CHANGE TO USE, EGRESS OR OCCUPANCY
B00697903-I1
03/15/2022
Special inspection requirement — Energy Code Compliance Inspections
FRANK QUATELA
03/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANK QUATELA
03/07/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/05/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/01/1995
Violation issued (ECB, closed)
Construction
01/05/1990
Violation issued (ECB, closed)
Public Assembly
06/02/1987
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC06/27/2022
DOB NOWPlumbingSigned-offDW PLUMBING INC03/23/2022
DOB NOWGeneral ConstructionSigned-offONE CAPITAL RENOVATION CO03/18/2022
3 projects · most recent 06/17/2022
General Wiring
FiledStatusContractorScope
06/17/2022CompleteELPO ELECTRICAL CONTG INC—
05/05/2022CompleteDELTA GREEN ELECTRIC INCGeneral Wiring
04/13/2022CompleteTMF ELEC'L CONTR. INC.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/30/2022Pass-Final General Construction Non-Directive 14PassView ↗
11/21/2022Fail-Final General Construction Non-Directive 14FailView ↗
06/27/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/24/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
10/20/2022Fire-Resistant Penetrations and JointsFRANK QUATELAspecial
10/20/2022Fire-Resistance Rated ConstructionFRANK QUATELAprogress
10/20/2022Energy Code Compliance InspectionsFRANK QUATELAprogress
10/20/2022Fenestration air leakageFRANK QUATELAenergy_progress
10/20/2022Air barrier - visual inspectionFRANK QUATELAenergy_progress
10/20/2022Lighting controlsFRANK QUATELAenergy_progress
10/20/2022Interior lighting powerFRANK QUATELAenergy_progress
10/20/2022Fenestration and door U-factor and product ratingsFRANK QUATELAenergy_progress
08/30/2022Interior lighting powerFRANK QUATELAenergy_progress
08/30/2022Lighting controlsFRANK QUATELAenergy_progress
08/30/2022Fenestration and door U-factor and product ratingsFRANK QUATELAenergy_progress
08/30/2022Fire-Resistant Penetrations and JointsFRANK QUATELAspecial
08/30/2022Energy Code Compliance InspectionsFRANK QUATELAprogress
08/30/2022Fire-Resistance Rated ConstructionFRANK QUATELAprogress
08/30/2022Fenestration air leakageFRANK QUATELAenergy_progress
08/30/2022Air barrier - visual inspectionFRANK QUATELAenergy_progress
03/15/2022Energy Code Compliance InspectionsFRANK QUATELAprogress
03/15/2022Fire-Resistant Penetrations and JointsFRANK QUATELAspecial
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/30/2026B00697903-I1Request digital key ↗
08/30/2026B00697903-P2Request digital key ↗
08/30/2026B00697903-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/30/2026B00697903-P2Open ↗
08/30/2026B00697903-P1Open ↗
08/30/2026B00697903-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/25/2026B00697903-S1Open ↗
08/25/2026B00697903-I1Open ↗
08/25/2026B00697903-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/25/2026B00697903-S1Open ↗
08/25/2026B00697903-I1Open ↗
08/25/2026B00697903-P2Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/30/2026B00697903-P2Open ↗
08/30/2026B00697903-P1Open ↗
08/30/2026B00697903-S1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/30/2026B00697903-I1Open ↗