← Back
Two stories - detached, small or mid-size
291 WESTMINSTER ROAD
BROOKLYN · BIN 3118330
💬 Discuss this project
1899Year Built
2.75Stories
A1Building Class
R3XZoning
2,716 sfGross Floor Area
1Units
8 Open Violations 2 unresolved · 6 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 5,000 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 23p · 2 filings · 10 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SERVICES103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TECHNEMOTION DESIGN210/28/2021
INM ARCHITECTS PC112/06/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
VS CREATIVE DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRESTIGE BUILDERS GROUP LGeneral Contractor303/21/2026
SAMUEL & SONS P & H INCPlumbing207/08/2026
ROBERT J PALERMOElectrical103/21/2026
MOHAMMED HOSSAINGeneral Contractor103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ECOPLUSDESIGN2887210/28/2021
INM ARCHITECT, P.C.3351112/06/2019
Building Lifecycle
All (35)Filed (3)Permit Issued (2)Violation (9)Inspection (8)Objection (10)Special Inspection (3)
10/09/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/04/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/04/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/05/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/01/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/27/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/24/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/04/2024
Permit issued — Plumbing
B00513675-I1-PL
04/02/2024
Permit issued — General Construction
B00509812-I1-GC
12/09/2021
Violation issued (ECB, open)
Construction
11/17/2021
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
10/28/2021
Filed — Alteration
B00513675-I1
05/15/2021
Violation issued (ECB, open)
Construction
05/14/2021
Objection raised — Energy
05/14/2021
Objection resolved — Addressed
05/14/2021
Objection raised — Other
05/14/2021
Objection resolved — Addressed
05/14/2021
Objection raised — Cost
05/14/2021
Objection resolved — Addressed
05/14/2021
Objection raised — Scope
05/14/2021
Objection resolved — Addressed
05/14/2021
Objection raised — Scope
05/14/2021
Objection resolved — Addressed
05/10/2021
Filed — Alteration
B00509812-I1
04/23/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Seungchul Ok
04/23/2021
Special inspection requirement — Energy Code Compliance Inspections
Seungchul Ok
04/23/2021
Special inspection requirement — Fire-Resistance Rated Construction
Seungchul Ok
01/29/2021
Violation issued (ECB, open)
Construction
10/13/2020
Violation issued (ECB, open)
Construction
02/29/2020
Violation issued (ECB, open)
Construction
12/11/2019
Violation issued (ECB, open)
Construction
12/06/2019
Filed — Alteration
B00272167-I1
11/13/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/08/2019
Violation issued (ECB, open)
Construction
08/19/2019
Violation issued (ECB, open)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedSAMUEL & SONS P & H INC06/04/2024
DOB NOWGeneral ConstructionPermit IssuedPRESTIGE BUILDERS GROUP L04/02/2024
BISPLISSUEDORBIT PLBG & HTG INC11/22/2002
BIS—ISSUEDMETRO STRUCTURAL STEEL INC11/22/2002
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
10/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/04/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/04/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/05/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/01/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/27/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/24/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/17/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
04/23/2021Fire-Resistant Penetrations and JointsSeungchul Okspecial
04/23/2021Energy Code Compliance InspectionsSeungchul Okprogress
04/23/2021Fire-Resistance Rated ConstructionSeungchul Okprogress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
08/31/2026B00513675-I1Request digital key ↗
08/14/2026B00509812-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing Legalization1
09/02/2026B00272167-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/01/2026B00509812-I1Open ↗
08/31/2026B00513675-I1Open ↗
08/13/2026B00272167-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026B00509812-I1Open ↗
08/26/2026B00509812-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026B00509812-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026B00509812-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/31/2026B00513675-I1Open ↗
08/14/2026B00509812-I1Open ↗
08/13/2026B00272167-I1Open ↗