← Back
Over six families without stores
2911 ALBERMARLE ROAD
BROOKLYN · BIN 3428822
💬 Discuss this project
0Year Built
4.5Stories
C1Building Class
R6Zoning
6,037 sfGross Floor Area
9Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Over six families without stores · Owner of record: ALBERMARLE HEIGHTS LLC · 2,769 sf lot · 2.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof2p · 2 filings · 20 docs
Bulkhead2p · 1 filing · 2 docs
Penthouse3p · 3 filings · 20 docs
Floor 43p · 2 filings · 13 docs
Floor 36p · 3 filings · 20 docs
Floor 27p · 4 filings · 20 docs
Floor 14p · 3 filings · 20 docs
Cellar4p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TWIN GROUP ASSOCIATES2907/08/2026
OL TWIN GROUP ASSOCIATES103/22/2026
ALBERMARLE HEIGHTS LLC803/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/05/2020$1.5M—— → —$248/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HIDAMARI ENGINEERING SERVICES, P.C.705/20/2021
PATUXENT ENGINEERING LLC110/12/2020
H & O ENGINEERING, DPC105/11/2020
TITAN ENGINEERS PC103/16/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDITING 4 U803/21/2026
PATUXENT ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TWIN GROUP ASSOCIATES INCGeneral Contractor703/22/2026
BRUCHE MECHANICALPlumbing303/22/2026
PLBG P & H INCPlumbing307/08/2026
BRUCHE MECHANICAL NY LLCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BGM ENGINEERING, LLC1514805/20/2021
Building Lifecycle
All (60)Filed (10)Permit Issued (4)Signed Off (6)Violation (13)Special Inspection (27)
04/03/2026
Violation issued (HPD, closed)
A
01/08/2026
Violation issued (HPD, closed)
B
05/01/2025
Violation issued (HPD, closed)
B
05/01/2025
Violation issued (HPD, closed)
B
05/01/2025
Violation issued (HPD, closed)
B
02/08/2022
Violation issued (HPD, closed)
A
02/08/2022
Violation issued (HPD, closed)
A
02/08/2022
Violation issued (HPD, closed)
A
02/08/2022
Violation issued (HPD, closed)
A
06/24/2021
Signed off — Alteration
B00331919-I1
06/23/2021
Signed off — Alteration
B00331922-I1
06/14/2021
Signed off — Alteration
B00346643-I1
05/27/2021
Signed off — Alteration
B00327175-I1
05/26/2021
Signed off — Alteration
B00331917-I1
05/20/2021
Filed — Alteration
B00331922-P2
05/19/2021
Special inspection requirement — Sprinkler Systems
RAUL VELASQUEZ MARTINEZ
05/19/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAUL VELASQUEZ MARTINEZ
05/07/2021
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AND SUPPORT SCAFFOLD IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00411262-I1
05/07/2021
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH BADINTER
05/07/2021
Special inspection requirement — Maintenance information
JOSEPH BADINTER
05/07/2021
Special inspection requirement — HVAC insulation and sealing
JOSEPH BADINTER
05/07/2021
Special inspection requirement — HVAC and service water heating system controls
JOSEPH BADINTER
05/07/2021
Special inspection requirement — HVAC and service water heating equipment
JOSEPH BADINTER
05/07/2021
Special inspection requirement — Shutoff dampers
JOSEPH BADINTER
05/07/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH BADINTER
05/07/2021
Special inspection requirement — Mechanical Systems
JOSEPH BADINTER
05/07/2021
Special inspection requirement — Heating Systems
JOSEPH BADINTER
05/07/2021
Special inspection requirement — Final
JOSEPH BADINTER
05/04/2021
Filed — Alteration
B00331922-P1
04/26/2021
Filed — Alteration
B00331917-P1
04/26/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JOSEPH BADINTER
04/26/2021
Special inspection requirement — Maintenance information
JOSEPH BADINTER
04/26/2021
Special inspection requirement — HVAC and service water heating system controls
JOSEPH BADINTER
04/26/2021
Special inspection requirement — Electrical motors
JOSEPH BADINTER
04/26/2021
Special inspection requirement — HVAC insulation and sealing
JOSEPH BADINTER
04/26/2021
Special inspection requirement — HVAC and service water heating equipment
JOSEPH BADINTER
04/26/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH BADINTER
04/22/2021
Filed — Alteration
B00331919-P1
04/22/2021
Special inspection requirement — Electrical motors
JOSEPH BADINTER
04/22/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAUL VELASQUEZ MARTINEZ
04/22/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
RAUL VELASQUEZ MARTINEZ
04/22/2021
Special inspection requirement — Maintenance information
JOSEPH BADINTER
04/22/2021
Special inspection requirement — HVAC insulation and sealing
JOSEPH BADINTER
04/22/2021
Special inspection requirement — HVAC and service water heating system controls
JOSEPH BADINTER
04/22/2021
Special inspection requirement — HVAC and service water heating equipment
JOSEPH BADINTER
03/24/2021
Violation issued (ECB, closed)
Construction
03/12/2021
Permit issued — Structural
B00327175-I1-ST
03/05/2021
Permit issued — Sprinklers
B00331922-I1-EW-SP
03/05/2021
Permit issued — Plumbing
B00331919-I1-PL
03/03/2021
Permit issued — Mechanical Systems
B00331917-I1-MS
10/20/2020
Violation issued (ECB, closed)
Construction
10/20/2020
Violation issued (ECB, closed)
Construction
10/12/2020
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AND SUPPORT SCAFFOLD IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00411262-I1
10/09/2020
Special inspection requirement — Final
JOHN O'CONNOR, P.E.
05/11/2020
Filed — Alteration
B00346643-I1
03/23/2020
Filed — Alteration
B00331917-I1
03/18/2020
Filed — Alteration
B00331919-I1
03/18/2020
Filed — Alteration
B00331922-I1
03/16/2020
Filed — Alteration
B00327175-I1
08/02/2006
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offTWIN GROUP ASSOCIATES INC03/12/2021
DOB NOWSprinklersSigned-offBRUCHE MECHANICAL NY LLC03/05/2021
DOB NOWPlumbingSigned-offPLBG P & H INC03/05/2021
DOB NOWMechanical SystemsSigned-offTWIN GROUP ASSOCIATES INC03/03/2021
BIS—ISSUEDTWIN GROUP ASSOCIATES INC01/21/2021
BISEQISSUEDMANHATTAN D ENTERPRISES10/28/2020
BIS—ISSUEDTWIN GROUP ASSOCIATES INC07/20/2020
BIS—ISSUEDTWIN GROUP ASSOCIATES INC07/20/2020
BISEQISSUEDMANHATTAN D ENTERPRISES06/17/2020
4 projects · most recent 06/17/2021
General Wiring
FiledStatusContractorScope
06/17/2021CompleteTFK ELECTRIC CORPGeneral Wiring
10/15/2020CompleteV. VASS ELECTRIC CORP—
09/15/2020CompleteTFK ELECTRIC CORP—
06/12/2020CompleteV. VASS ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
05/19/2021Sprinkler SystemsRAUL VELASQUEZ MARTINEZspecial
05/19/2021Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
05/07/2021Energy Code Compliance InspectionsJOSEPH BADINTERprogress
05/07/2021Maintenance informationJOSEPH BADINTERenergy_progress
05/07/2021HVAC insulation and sealing JOSEPH BADINTERenergy_progress
05/07/2021HVAC and service water heating system controls JOSEPH BADINTERenergy_progress
05/07/2021HVAC and service water heating equipment JOSEPH BADINTERenergy_progress
05/07/2021Shutoff dampersJOSEPH BADINTERenergy_progress
05/07/2021Fire-Resistant Penetrations and JointsJOSEPH BADINTERspecial
05/07/2021Mechanical SystemsJOSEPH BADINTERspecial
05/07/2021Heating SystemsJOSEPH BADINTERspecial
05/07/2021FinalJOSEPH BADINTERprogress
04/26/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJOSEPH BADINTERspecial
04/26/2021Maintenance informationJOSEPH BADINTERenergy_progress
04/26/2021HVAC and service water heating system controls JOSEPH BADINTERenergy_progress
04/26/2021Electrical motorsJOSEPH BADINTERenergy_progress
04/26/2021HVAC insulation and sealing JOSEPH BADINTERenergy_progress
04/26/2021HVAC and service water heating equipment JOSEPH BADINTERenergy_progress
04/26/2021Fire-Resistant Penetrations and JointsJOSEPH BADINTERspecial
04/22/2021Electrical motorsJOSEPH BADINTERenergy_progress
04/22/2021Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
04/22/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRAUL VELASQUEZ MARTINEZspecial
04/22/2021Maintenance informationJOSEPH BADINTERenergy_progress
04/22/2021HVAC insulation and sealing JOSEPH BADINTERenergy_progress
04/22/2021HVAC and service water heating system controls JOSEPH BADINTERenergy_progress
Latest 25 of 27.
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch - Sprinkler3
09/02/2026B00331922-I1Request digital key ↗
08/15/2026B00331922-P1Request digital key ↗
08/15/2026B00331922-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00331919-I1Request digital key ↗
08/15/2026B00331919-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00331917-I1Request digital key ↗
08/15/2026B00331917-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00411262-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00346643-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00411262-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00327175-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
10/23/2020340778590Open ↗
06/12/2020340734664Open ↗
▸BISWORK PERMIT APPLICATION2
10/28/2020340778590Open ↗
06/12/2020340734664Open ↗
▸Seals & Professional Certifications43
▸DOB NOWProgress Inspector Seal & Signature18
08/27/2026B00331917-I1Open ↗
08/27/2026B00331917-I1Open ↗
08/27/2026B00331917-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/02/2026B00411262-I1Open ↗
08/13/2026B00346643-I1Open ↗
08/13/2026B00331919-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/10/2026B00331922-P2Open ↗
09/10/2026B00331922-P2Open ↗
08/27/2026B00331917-I1Open ↗
Showing 3 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
10/23/2020340778590Open ↗
06/12/2020340734664Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/23/2020340778590Open ↗
06/12/2020340734664Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
10/23/2020340778590Open ↗
06/12/2020340734664Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWFDNY: Letter of No Objection3
08/13/2026B00331922-P1Open ↗
08/13/2026B00331922-I1Open ↗
08/13/2026B00331922-P2Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
06/12/2020340734664Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
06/08/2021340734664Open ↗
06/01/2021340778590Open ↗
10/23/2020340778590Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
06/08/2021340734664Open ↗
06/01/2021340778590Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET2
10/23/2020340778590Open ↗
06/12/2020340734664Open ↗