← Back
BuildNYC
Elevator apt, semi-fireproof without stores
2911 BRIGHTON 5 STREET
BROOKLYN · Brighton Beach · BIN 3244448
💬 Discuss this project
1963Year Built
6Stories
D1Building Class
R6Zoning
100,300 sfGross Floor Area
106Units
LL97 CoveredRent Stabilized43 Active Violations ▸FISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: Erynn 5th Apartmentco · 23,621 sf lot · 4.25 FAR built · Flood zone AE
Locations of Work
ArchitectureElectricalMechanicalLandscape
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofEnergy analysis for alteration6p · 3 filings · 14 docs
Floor 7Brick crack repairs, repointing, sill and coping replacement4p · 1 filing · 5 docs
Floor 6Unit 6A4p · 2 filings · 12 docs
Floor 5Brick crack repairs, repointing, sill and coping replacement4p · 1 filing · 5 docs
Floor 4Brick crack repairs, repointing, sill and coping replacement4p · 1 filing · 5 docs
Floor 3Brick crack repairs, repointing, sill and coping replacement4p · 1 filing · 5 docs
Floor 2Brick crack repairs, repointing, sill and coping replacement4p · 1 filing · 5 docs
Floor 1Brick crack repairs, repointing, sill and coping replacement4p · 1 filing · 5 docs
Site & exteriorHeavy duty sidewalk shed4p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Eyrnn 5th Apartments703/22/2026
Erynn 5th Apts203/21/2026
2911 Brighton 5103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/29/2025$12.9M—ERYNN 5TH APARTMENTS CO., LLC → 2911 BRIGHTON 5 LLC$128/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Nazzareno Callipo P.E.111/25/2025
Grant101/27/2022
K & M Associates112/15/2021
Cna Builders & Consultant106/15/2021
Green Design110/31/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Construction Permit Services103/21/2026
GC1 Expediting203/21/2026
Atlantic Building Supply203/21/2026
GZ NC Code Planning Engineering103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JJS BuildersScaffold707/08/2026
Watch Hill Wireless Solutionsspecialty_contractor303/21/2026
Carrick ContractingGeneral Contractor207/08/2026
Priore Construction Servicesspecialty_contractor203/21/2026
KGB Electrical ContractingElectrical103/21/2026
Charter CommunicationsGeneral Contractor103/21/2026
J A Lee ElectricGeneral Contractor103/21/2026
Kwong Ming ElectricElectrical103/21/2026
Berliner CommunicationsGeneral Contractor104/30/2001
BMC PlumbingPlumbing109/22/1994
Costrotta Construction MaGeneral Contractor105/06/2014
F & T MechanicalPlumbing112/03/2009
Gotham CommunicationsGeneral Contractor110/03/2018
Odyssia Global CommercialGeneral Contractor111/25/2009
Squan Construction ServicesGeneral Contractor310/18/2016
Vertical SolutionsGeneral Contractor108/15/2016
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GZ & NC Code Consulting P7492111/25/2025
Grant Engineering Consulting3512101/27/2022
KM Consulting NY5305112/15/2021
Cna Builders and Consulta2898106/15/2021
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
07/30/2026
Elevator Category 1 inspection report filed
05/01/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
03/10/2026
Closed: Failed to file FISP cycle 9A technical report by 02/21/2022
DOB violation · closed on the city's record
03/10/2026
Closed: Failed to file FISP cycle 8A technical report by 02/21/2017
DOB violation · closed on the city's record
227 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaSigned-offPriore Construction Services03/21/2022
DOB NOWGeneral ConstructionSigned-offCarrick Contracting03/17/2022
DOB NOWAntennaSigned-offWatch Hill Wireless Solutions02/14/2022
DOB NOWGeneral ConstructionSigned-offCarrick Contracting11/04/2021
DOB NOWSidewalk ShedPermit IssuedJJS Builders04/03/2018
DOB NOWSidewalk ShedPermit IssuedJJS Builders01/04/2018
DOB NOWSidewalk ShedPermit IssuedJJS Builders11/01/2017
BISOTISSUEDGotham Communications10/03/2018
BISOTISSUEDJ.A. Lee Electric04/05/2017
BISOTISSUEDSquan Construction Services10/18/2016
BISOTISSUEDVertical Solutions08/15/2016
BISOTISSUEDSquan Construction Services10/21/2015
BISOTISSUEDSquan Construction Services07/22/2015
BISOTISSUEDCostrotta Construction Ma05/06/2014
BISPLISSUEDAura Plumbing12/03/2009
BISMHISSUEDOdyssia Global Commercial11/25/2009
BISOTISSUEDCharter Communications02/12/2003
BISMHISSUEDBerliner Communications04/30/2001
BISFSISSUEDAbilene09/22/1994
BISPLISSUEDBMC Plumbing09/22/1994
BISFBISSUEDAbilene09/01/1994
2 projects · most recent 12/12/2025
General Wiring
FiledStatusContractorScope
12/12/2025Permit IssuedKwong Ming ElectricGeneral Wiring
09/08/2023CompleteKGB Electrical ContractingGeneral Wiring
1 project · most recent 10/31/2017
Sidewalk Shed
FiledStatusContractorScope
10/31/2017Permit IssuedJJS BuildersSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
11/25/2025Fire-Resistant Penetrations and JointsNazzareno Callipospecial
11/25/2025Fire-Resistance Rated ConstructionNazzareno Callipoprogress
11/21/2025Tenant Protection Plan ComplianceNazzareno Callipospecial
11/04/2025FinalNazzareno Callipoprogress
06/07/2021MasonryChoudhry Yusafspecial
06/07/2021FinalChoudhry Yusafprogress
84 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account