← Back
BuildNYC
Over six families without stores
2919 HOLLAND AVENUE
BRONX · BIN 2054833
💬 Discuss this project
1930Year Built
2.5Stories
C1Building Class
R6Zoning
2,796 sfGross Floor Area
8Units
Rent Stabilized12 Active Violations ▸
Over six families without stores · Owner of record: 2919 Holland · 2,500 sf lot · 1.12 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Unit 2A29p · 1 filing · 20 docs
Floor 130p · 1 filing · 20 docs
Basement34p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NY Creative Developers2607/08/2026
2919 Holland103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/15/2023$725K—Private party → 2919 HOLLAND LLC$259/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Adb Associates812/21/2023
Vasilios Artemiou PE104/19/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC Design File903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Builders Group USAGeneral Contractor403/21/2026
A. M. Plumbing CompanyPlumbing107/08/2026
Prime Piping & HeatingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616612/21/2023
Building Lifecycle
06/10/2026
§ 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES AT ALL FIXTURES BATHROOM AND KITCHEN IN THE ENTIRE APARTMENT LOCATED AT…
HPD violation · closed
06/10/2026
§ 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT ALL HOT WATER FIXTURES BATHROOM AND KITCHEN IN THE ENTIRE APARTMENT…
HPD violation · closed
05/13/2026
566 (B) 27-2021.4 HMC: ABATE THE NUISANCE CONSISTING OF PESTS. EVIDENCE OF FLIES IN THE ENTIRE APARTMENT LOCATED AT APT 1C, 1st STORY, 1st…
HPD violation · open
05/13/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM WEST…
HPD violation · open
05/13/2026
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 1C, 1st…
HPD violation · open
68 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBuilders Group USA08/09/2023
DOB NOWSprinklersSigned-offAmb Mechanical08/04/2023
DOB NOWPlumbingSigned-offA. M. Plumbing Company08/03/2023
DOB NOWMechanical SystemsSigned-offBuilders Group USA08/03/2023
1 project · most recent 12/21/2023
Associated Ducts and Piping Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
12/21/2023Permit IssuedBuilders Group USAAssociated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 12/21/2023
Storm Water/Sanitary
FiledStatusContractorScope
12/21/2023Signed-offA. M. Plumbing CompanyStorm, Water/Sanitary
1 project · most recent 01/10/2024
General Wiring
FiledStatusContractorScope
01/10/2024CompletePlatinum PWR Electl ContGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
12/18/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/18/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/30/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/28/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
11/23/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/10/2023Pass-Final PL - UndergroundPassView ↗
08/18/2023Pass-Final PL - UndergroundPassView ↗
08/11/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 77
DateRequirementInspectorRole
01/10/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
01/10/2024Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
01/10/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/10/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
01/10/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
01/10/2024Interior lighting powerFAHAD FATEHenergy_progress
01/10/2024Fenestration air leakageFAHAD FATEHenergy_progress
01/10/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
01/10/2024Fenestration areasFAHAD FATEHenergy_progress
01/10/2024MeteringFAHAD FATEHenergy_progress
01/10/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
01/10/2024Maintenance informationFAHAD FATEHenergy_progress
01/10/2024Exterior lighting powerFAHAD FATEHenergy_progress
01/10/2024Lighting in dwelling unitsFAHAD FATEHenergy_progress
01/10/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
01/10/2024Lighting controlsFAHAD FATEHenergy_progress
01/10/2024Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
01/10/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/10/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
01/10/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
01/10/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
01/10/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
01/10/2024Lighting controlsFAHAD FATEHenergy_progress
01/10/2024Fenestration areasFAHAD FATEHenergy_progress
01/10/2024Fenestration air leakageFAHAD FATEHenergy_progress
Latest 25 of 77.
57 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account