← Back
City residence, one family
292 14 STREET
BROOKLYN · BIN 3023706
💬 Discuss this project
1899Year Built
2Stories
A4Building Class
R6BZoning
2,052 sfGross Floor Area
1Units
City residence, one family · 2,500 sf lot · 0.82 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MILLWARD ARCHITECTURE DESIGN310/05/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASSURE PROFESSIONAL ENGIN6962310/05/2023
Building Lifecycle
All (11)Filed (3)Permit Issued (1)Signed Off (1)Inspection (4)Special Inspection (2)
10/18/2023
Signed off — Alteration
Interior renovation to basement Laundry Room, Kitchen and 1st Floor bathroom.
B00793174-I1
10/05/2023
Filed — Alteration
Interior renovation to basement Laundry Room, Kitchen and 1st Floor bathroom.
B00793174-P2
10/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GUNJAN KHANDWALA
07/19/2023
Filed — Alteration
Interior renovation to basement Laundry Room, Kitchen and 1st Floor bathroom.
B00793174-P1
07/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GUNJAN KHANDWALA
12/27/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/27/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/27/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/22/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/25/2022
Permit issued — Plumbing
B00793174-I1-PL
09/09/2022
Filed — Alteration
Interior renovation to basement Laundry Room, Kitchen and 1st Floor bathroom.
B00793174-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR10/25/2022
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/27/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/27/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/27/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/22/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
10/05/2023Fire-Resistant Penetrations and JointsGUNJAN KHANDWALAspecial
07/19/2023Fire-Resistant Penetrations and JointsGUNJAN KHANDWALAspecial
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/27/2026B00793174-P2Request digital key ↗
08/27/2026B00793174-P1Request digital key ↗
08/27/2026B00793174-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026B00793174-P1Open ↗
08/27/2026B00793174-I1Open ↗
08/13/2026B00793174-P2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B00793174-P2Open ↗
08/28/2026B00793174-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026B00793174-P1Open ↗
08/27/2026B00793174-I1Open ↗
08/13/2026B00793174-P2Open ↗