← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
292 BEDFORD AVENUE
BROOKLYN · BIN 3062776
💬 Discuss this project
1910Year Built
5Stories
RMBuilding Class
R6BZoning
17,621 sfGross Floor Area
21Units
Rent Stabilized16 Open Violations 15 unresolved · 1 paperwork only ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 292 BEDFORD LLC · 3,619 sf lot · 4.87 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneral
Permit Issued — active, not yet Signed-off
Roof2p · 1 filing · 3 docs
Floor 1Under Construction2p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RANCO MANAGEMENT609/17/2026
292 BEDFORD6003/22/2026
292 BEDFORD AVE203/22/2026
A & L CONSTRUCTION USA103/22/2026
TAIYAKINYC WILLIAMSBURG INC.303/22/2026
RESTAURANT303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEON SKVIRSKY PE108/18/2026
SOYU ARCHITECTURE, INC.103/29/2026
KMB DESIGN GROUP, LLC106/13/2025
1+1 DESIGN STUDIO LLC410/31/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JRK CREATIVE803/21/2026
CONSTRUCTION PERMIT SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SIGMOND FRIEDElectrical203/21/2026
GEHRKE, BRIANElectrical103/21/2026
P.L. ELEC'L CONTR'G CORPElectrical103/22/2026
REY, JOHNElectrical103/21/2026
PAUL SIGNS INCGeneral Contractor109/17/2026
SQUAN CONSTRUCTION SERVICGeneral Contractor104/09/2026
TESS CONTRACTING CORPGeneral Contractor107/08/2026
ASSET ELECTRIC CORPElectrical103/22/2026
CROSSFIELD PLBG.&HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JKM ARCHITECTURE P.C.8906103/29/2026
KMB DESIGN GROUP, LLC513106/13/2025
1+1 DESIGN STUDIO LLC1039410/31/2023
Building Lifecycle
All (93)Filed (7)Permit Issued (4)Signed Off (3)Violation (60)Inspection (2)Objection (2)Special Inspection (15)
09/16/2026
Permit issued — General Construction
B01439549-I1-GC
08/18/2026
Filed — Alteration
INSTALL STOREFRONT AWNING WITH NON-ILLUMINATED COPY READING "AFTERGLOW". COPY NOT TO EXCEED 12 SQ FT TOTAL. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B01439549-I1
07/31/2026
Violation issued (HPD, closed)
C
07/31/2026
Special inspection requirement — Tenant Protection Plan Compliance
ARIEL GOLSHAN
07/31/2026
Special inspection requirement — Final
LEON SKVIRSKY
07/21/2026
Violation issued (HPD, open)
B
07/21/2026
Violation issued (HPD, open)
B
07/21/2026
Violation issued (HPD, open)
B
07/21/2026
Violation issued (HPD, open)
C
07/21/2026
Violation issued (HPD, open)
B
07/21/2026
Violation issued (HPD, open)
B
07/21/2026
Violation issued (HPD, open)
B
07/21/2026
Violation issued (HPD, open)
C
05/11/2026
Permit issued — General Construction
B01376835-I1-GC
05/01/2026
Violation issued (HPD, closed)
A
04/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Min
04/14/2026
Objection raised — Cost
04/14/2026
Objection raised — Fire_Protection
03/29/2026
Filed — Alteration
RENOVATION OF EXISTING STORE, INCLUDING REMOVAL AND INSTALLATION OF PARTITION AND NEW COUNTER. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
B01376835-I1
03/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
John Min
02/04/2026
Violation issued (FDNY_ORDER, closed)
12/03/2025
Signed off — Alteration
Modification to existing VERIZON site. Install 2 sectors (5 antennas), 7 RRH units, and 2 OVPs. Replace 2 antennas, 4 RRHs, and 1 OVP. Relocate 1 antenna. Remove 1 equipment cabinet and install new equipment platform with 3 cabinets on the roof.
B00819247-I1
10/07/2025
Violation issued (ECB, open)
Construction
09/27/2025
Violation issued (FDNY_ORDER, closed)
08/20/2025
Permit issued — Antenna
B00819247-I1-AN
06/13/2025
Filed — Alteration
Modification to existing VERIZON site. Install 2 sectors (5 antennas), 7 RRH units, and 2 OVPs. Replace 2 antennas, 4 RRHs, and 1 OVP. Relocate 1 antenna. Remove 1 equipment cabinet and install new equipment platform with 3 cabinets on the roof.
B00819247-I1
03/10/2025
Violation issued (ECB, closed)
Construction
11/23/2024
Violation issued (ECB, open)
Unknown
04/08/2024
Violation issued (HPD, closed)
A
01/11/2024
Signed off — Alteration
FILING THIS APPLICATION TO INSTALL NEW PLUMBING ON 1ST FL.GENERAL CONSTRUCTION WILL BE FILING SEPARATE APPLICATION.NO CHANGE IN MEANS OF USE,EGRESS OR OCCUPANCY
B00918371-I1
01/08/2024
Signed off — Alteration
INTERIOR RENOVATION FOR CAFE LOUNGE ON 1ST FL AND MINOR PARTITION WALL & MODIFICATION EXIST. STORE FRONT .PLUMBING WORK WILL BE FILING SEPARATE APPLICATION ,NO CHANGE IN MEANS OF USE,EGRESS OR OCCUPANCY
B00916863-I1
01/08/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/07/2023
Violation issued (HPD, closed)
C
12/07/2023
Violation issued (HPD, closed)
C
10/31/2023
Filed — Alteration
FILING THIS APPLICATION TO INSTALL NEW PLUMBING ON 1ST FL.GENERAL CONSTRUCTION WILL BE FILING SEPARATE APPLICATION.NO CHANGE IN MEANS OF USE,EGRESS OR OCCUPANCY
B00918371-P1
10/31/2023
Filed — Alteration
INTERIOR RENOVATION FOR CAFE LOUNGE ON 1ST FL AND MINOR PARTITION WALL & MODIFICATION EXIST. STORE FRONT .PLUMBING WORK WILL BE FILING SEPARATE APPLICATION ,NO CHANGE IN MEANS OF USE,EGRESS OR OCCUPANCY
B00916863-P1
10/31/2023
Special inspection requirement — Tenant Protection Plan Compliance
Hung Pui Ho
10/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hung Pui Ho
10/31/2023
Special inspection requirement — Energy Code Compliance Inspections
Hung Pui Ho
10/24/2023
Special inspection requirement — Interior lighting power
Hung Pui Ho
10/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hung Pui Ho
10/24/2023
Special inspection requirement — Tenant Protection Plan Compliance
10/24/2023
Special inspection requirement — Energy Code Compliance Inspections
Hung Pui Ho
10/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hung Pui Ho
10/24/2023
Special inspection requirement — Tenant Protection Plan Compliance
10/24/2023
Special inspection requirement — Energy Code Compliance Inspections
Hung Pui Ho
10/24/2023
Special inspection requirement — Final
Hung Pui Ho
09/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/07/2023
Permit issued — Plumbing
B00918371-I1-PL
08/15/2023
Filed — Alteration
FILING THIS APPLICATION TO INSTALL NEW PLUMBING ON 1ST FL.GENERAL CONSTRUCTION WILL BE FILING SEPARATE APPLICATION.NO CHANGE IN MEANS OF USE,EGRESS OR OCCUPANCY
B00918371-I1
08/15/2023
Filed — Alteration
INTERIOR RENOVATION FOR CAFE LOUNGE ON 1ST FL AND MINOR PARTITION WALL & MODIFICATION EXIST. STORE FRONT .PLUMBING WORK WILL BE FILING SEPARATE APPLICATION ,NO CHANGE IN MEANS OF USE,EGRESS OR OCCUPANCY
B00916863-I1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2023
Violation issued (HPD, closed)
B
05/02/2023
Violation issued (HPD, closed)
B
05/02/2023
Violation issued (HPD, closed)
B
05/02/2023
Violation issued (HPD, closed)
B
05/02/2023
Violation issued (HPD, closed)
B
05/02/2023
Violation issued (HPD, closed)
B
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPAUL SIGNS INC09/16/2026
DOB NOWGeneral ConstructionPermit IssuedTESS CONTRACTING CORP05/11/2026
DOB NOWAntennaSigned-offSQUAN CONSTRUCTION SERVIC08/20/2025
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG09/07/2023
BISPLISSUEDL&J PLG & HTG CO OF NY IN07/03/2019
BISPLISSUEDDNA PLUMBING CONTR. INC04/05/2019
BISOTISSUEDDART AWNING INC03/28/2019
BISOTISSUEDCITYWIDE BUILDERS NY INC03/01/2019
BISOTISSUEDSMVP MGMT INC05/08/2018
BISPLISSUEDTOP PLUMBING GROUP,INC05/08/2018
BISPLISSUEDBT'S PLUMBING AND HEATING01/23/2018
BISOTISSUEDB.K. CONSTRUCTION GROUP I01/18/2018
BISBLISSUEDS.J. VISION&SON P&H INC08/24/2016
BISOTISSUEDEC ELECTRICAL CONTRACTOR08/02/2016
BISPLISSUEDS.J. VISION&SON P&H INC06/29/2016
BISOTISSUEDS.J. VISION & SON PLBNG &06/29/2016
BISMHISSUEDS.J. VISION & SON PLBNG &06/29/2016
BISPLISSUEDDNA PLUMBING CONTR. INC07/08/2015
BISFPISSUEDACTIVE FIRE CONTROL, INC03/19/2015
BISBLRE-ISSUEDORION PLUMBING & HTG CORP09/23/2014
BISPLISSUEDCK PLUMBING & MECH INC09/23/2014
BISEQISSUEDVERNE GROUP INC05/01/2014
BISPLISSUEDCITYWIDE PLUMBING NYC COR11/18/2013
BISEQISSUEDNAVICO B N S CONSTRUCTION10/29/2009
7 projects · most recent 10/06/2025
General Wiring
FiledStatusContractorScope
10/06/2025Permit IssuedPJ ELECTRICAL.LLCGeneral Wiring
08/02/2023CompleteJ Y ELECTRIC INCGeneral Wiring
07/11/2023CompleteASSET ELECTRIC CORPGeneral Wiring
07/14/2021CompleteASSET ELECTRIC CORPGeneral Wiring
07/12/2021CancelledASSET ELECTRIC CORPGeneral Wiring
07/29/2019Permit IssuedTRUE POWER ELECL CONT LLCGeneral Wiring
05/15/2018CompleteP.L. ELEC'L CONTR'G CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/08/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
07/31/2026Tenant Protection Plan ComplianceARIEL GOLSHANspecial
07/31/2026FinalLEON SKVIRSKYprogress
04/21/2026Fire-Resistant Penetrations and JointsJohn Minspecial
03/23/2026Tenant Protection Plan ComplianceJohn Minspecial
10/31/2023Tenant Protection Plan ComplianceHung Pui Hospecial
10/31/2023Fire-Resistant Penetrations and JointsHung Pui Hospecial
10/31/2023Energy Code Compliance InspectionsHung Pui Hoprogress
10/24/2023Interior lighting powerHung Pui Hoenergy_progress
10/24/2023Fire-Resistant Penetrations and JointsHung Pui Hospecial
10/24/2023Tenant Protection Plan Compliance—special
10/24/2023Energy Code Compliance InspectionsHung Pui Hoprogress
10/24/2023Fire-Resistant Penetrations and JointsHung Pui Hospecial
10/24/2023Tenant Protection Plan Compliance—special
10/24/2023Energy Code Compliance InspectionsHung Pui Hoprogress
10/24/2023FinalHung Pui Hoprogress
▾Documents — 305 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/27/2026B00918371-I1Request digital key ↗
08/27/2026B00918371-P1Request digital key ↗
08/27/2026B00916863-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits77
▸BISPLAN / WORK APPROVAL APPLICATION38
05/04/2020320979991Open ↗
04/30/2020320979991Open ↗
03/11/2020321696955Open ↗
Showing 3 of 38 on file for this type
▸BISWORK PERMIT APPLICATION28
08/20/2019321696955Open ↗
04/08/2019320843842Open ↗
03/29/2019321806159Open ↗
Showing 3 of 28 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION11
03/06/2020320979991Open ↗
07/11/2019320843842Open ↗
01/28/2019320843842Open ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records4
▸BISZONING APPEAL1
01/10/2020320859718Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
01/10/2020320859718Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
01/28/2019321696955Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
01/10/2020320859718Open ↗
▸Seals & Professional Certifications53
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION19
08/05/2019320843842Open ↗
04/23/2019321806159Open ↗
04/12/2019320843842Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026B00918371-I1Open ↗
08/27/2026B00916863-P1Open ↗
08/27/2026B00916863-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
03/12/2019321806159Open ↗
04/19/2018321743985Open ↗
12/12/2017321696955Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026B01439549-I1Open ↗
08/29/2026B00918371-P1Open ↗
08/28/2026B00916863-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026B01439549-I1Open ↗
08/29/2026B00918371-P1Open ↗
08/28/2026B00916863-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
03/12/2019321806159Open ↗
04/19/2018321743985Open ↗
Showing 2 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISProfessional and Owner Certification (POC3)1
12/12/2017321696955Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/18/2015340282054Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment12
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
03/11/2020321696955Open ↗
04/19/2018321743985Open ↗
12/12/2017321696955Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING2
08/18/2015340282054Open ↗
Showing 1 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS1
08/01/2018321743985Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
04/08/2016321062256Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
08/01/2018321743985Open ↗
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes4
03/12/2019321806159Open ↗
04/19/2018321743985Open ↗
08/01/2016321363225Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos14
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
04/27/2018321743985Open ↗
12/13/2017321696955Open ↗
04/13/2016321363225Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/27/2026B00918371-I1Open ↗
08/27/2026B00916863-P1Open ↗
08/27/2026B00916863-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
03/23/2016340282054Open ↗
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
08/05/2019320843842Open ↗
08/05/2019320843842Open ↗
07/31/2019320843842Open ↗
Showing 3 of 13 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
07/31/2019320843842Open ↗
08/13/2018321363225Open ↗
08/01/2018321743985Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/15/2020320979991Open ↗
06/15/2020320979991Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/15/2020320979991Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/15/2020320979991Open ↗
Showing 1 of 2 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
08/01/2018321743985Open ↗
▸Approvals, Objections & Sign-offs31
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
06/18/2020320979991Open ↗
08/05/2019320843842Open ↗
07/31/2019320843842Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
06/11/2019320843842Open ↗
03/15/2019321806159Open ↗
03/15/2019321806159Open ↗
Showing 3 of 11 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
03/12/2019321806159Open ↗
Showing 1 of 5 on file for this type
▸BISSUPERSEDING LETTER2
03/04/2019321696955Open ↗
01/23/2019320843842Open ↗
▸BISACPE Objection Review Request1
06/21/2019320843842Open ↗
▸Cost, Insurance & Ownership19
▸BISCOST AFFIDAVIT14
08/05/2019320843842Open ↗
07/31/2019320843842Open ↗
04/23/2019321806159Open ↗
Showing 3 of 14 on file for this type
▸BISCIVIL PENALTY AFFIDAVIT/REQUEST4
05/09/2018321743985Open ↗
05/09/2018321743985Open ↗
05/09/2018321743985Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
06/15/2020320979991Open ↗
▸Filing & Intake Forms55
▸BISADDITIONAL INFORMATION33
03/18/2020321696955Open ↗
06/21/2019320843842Open ↗
06/21/2019320843842Open ↗
Showing 3 of 33 on file for this type
▸BISBOROUGH INTAKE FORM11
08/05/2019320843842Open ↗
07/31/2019320843842Open ↗
04/23/2019321806159Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET9
11/29/2019320859718Open ↗
03/12/2019321806159Open ↗
04/19/2018321743985Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
08/18/2015340282054Open ↗
Showing 1 of 2 on file for this type
▸Other Documents4
▸BISCOMMUNITY BOARD NOTIFICATION2
07/31/2019320843842Open ↗
02/04/2019320979991Open ↗
▸BISENVIRONMENTAL 'E' DEP NOTICE TO PROCEED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
01/10/2020320859718Open ↗