ECB07/06/2026AT TIME OF INSPECTION OBSERVED: PROPOSED 4 STORY NB + PENTHOUSE TOP OFF. ACTIVE CONSTRUCTION REACHED 50' HEIGHT PLUS APPROX. NO OVERHEAD PROTECTION FOR ADJOINING PROPERTIES AT EXPOSURE# 2-4 CREATING POTENTIAL S$10K due
ECB07/06/2026AT TIME OF INSPECTION OBSERVED: SUPPORTED SCAFFOLD INSTALLED AT PERIMETER OF JOB SITE WORK CONTRARY TO DRAWINGS, PUMP JACK IN PLACE PASSING 40' HEIGHT APPROX. AT EXPO# 2, AT COURTYARD AREA FRAMES ON TOP OF BALC$1K due
ECB07/06/2026AT TIME OF INSPECTION OBSERVED: PROPOSED 4 STORIES NB TOP OFF. CONTRACTOR FAILURE TO DESIGNATE CONSTRUCTION SUPERINTENDENT. CS IS ALREADY ASSIGNED TO A DIFFERENT APPLICATION # B01225983-S3-ST CONTRARY TO BC 330$5K due
ECB07/06/2026AT TIME OF INSPECTION OBSERVED: SUPPORTED SCAFFOLD IN PLACE AT EXPO# 2-3-4 NOT MAINTAINED, LOOSE PLANKS MISSING GUARDRAILS, LOOSE NEEDING DEBRIS THROUGHOUT CONTRARY TO BC 3314.4.8. MATERIALS, TOOLS, AND DEBRISHearing held — result not yet published$2K proposed
ECB07/06/2026AT TIME OF INSPECTION OBSERVED: CONTRACTOR FAILURE TO INSTITUTE SAFETY MEASURES INADEQUATE/MISSING CONTENT ON PRE-SHIFT SAFETY MEETING, NO MENTION ABOUT SPECIFIC/ GENERAL WORK TASK HAZARDOUS AND PREVENTION ON SHearing held — result not yet published$5K proposed
ECB06/29/2026CONSTRUCTION FENCE UNDER PERMIT # BO1222238-S7-FN HAS AT EXPOSURE 4 ENTIRE FENCE MISSING., COMPLY WITH CODEHearing held — result not yet published$1K proposed
Two family converted from one family · 4,000 sf lot · 0.49 FAR built · Flood zone X