2921 BRIGHTON 4 STREET
BROOKLYN · Brighton Beach · BIN 3244400
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R6Zoning
0 sfGross Floor Area
0Units
5 Open Violations 0 unresolved · 5 paperwork only ▸FDNY Report ↗
Zoned residential, not Manhattan · Owner of record: 2921 BRIGHTON 4 LLC · 4,435 sf lot · 0 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction20p · 2 filings · 20 docs
Floor 6Under Construction22p · 1 filing · 20 docs
Floor 5Under Construction53p · 1 filing · 20 docs
Floor 4Under Construction53p · 1 filing · 20 docs
Floor 3Under Construction53p · 1 filing · 20 docs
Floor 2Under Construction53p · 1 filing · 20 docs
Floor 1Under Construction53p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2921 BRIGHTON 44109/15/2026
HPD303/22/2026
LKC GROUP403/22/2026
GZ BRIGHTON REALTY403/22/2026
4TH BRIGHTON REALTY703/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/22/2022$1.4M—— → —— not available
10/20/2015$1.2M—Private party → GZ BRIGHTON REALTY LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KINDO HOLDINGS, LLC808/19/2026
ZARINA KINDO104/29/2026
ASHRAF CORP207/26/2025
LEONID KRUPNIK, P.E.504/23/2025
ENTHINK ENGINEERS LLC103/16/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LAKH2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LKC GROUPGeneral Contractor1809/15/2026
PROFESSIONAL LINE CORPGeneral Contractor307/08/2026
AAKASH CONSTRUCTION INCGeneral Contractor203/21/2026
MEGA PLBG CORPFire Protection108/30/2026
MEGA PLBG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZARINA KINDO, RA4900304/29/2026
AA BUILDING & INSPECTION1519203/19/2026
LEONID KRUPNIK, PE6710111/18/2022
Building Lifecycle
All (126)Filed (17)Permit Issued (20)Signed Off (2)Violation (14)Inspection (4)Objection (39)Special Inspection (30)
09/14/2026
Permit issued — Support of Excavation
B01059134-S1-SE
08/27/2026
Permit issued — Sprinklers
B08042136-S3-EW-SP
08/25/2026
Permit issued — Structural
B08042136-S1-ST
08/20/2026
Permit issued — Curb Cut
B08042136-S5-CC
08/19/2026
Filed — New Building
Proposed installation of new curb cut in conjunction with NB#B08042136-I1
B08042136-S6
08/19/2026
Permit issued — Mechanical Systems
B08042136-S4-MS
07/27/2026
Permit issued — General Construction
B08042136-I1-GC
06/12/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01236008-I1
06/03/2026
Signed off — Alteration
Install supported scaffolding as an engineered enclosure system to meet NYC BC requirements for roof and overhead protection. Ensure stability, proper anchorage, and full compliance with safety and code standards.
B01207561-I1
06/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
06/01/2026
Permit issued — Sidewalk Shed
B01236008-I1-SH
05/13/2026
Permit issued — Construction Fence
B08006843-I1-FN
05/12/2026
Violation issued (ECB, open)
Construction
05/12/2026
Violation issued (ECB, open)
Construction
05/12/2026
Violation issued (ECB, open)
Construction
05/12/2026
Violation issued (ECB, open)
Construction
05/08/2026
Objection raised — Structural
05/08/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
05/05/2026
Permit issued — General Construction
B08042136-I1-GC
04/29/2026
Filed — New Building
Proposed installation of new curb cut in conjunction with NB#B08042136-I1
B08042136-P1
04/28/2026
Objection raised — Scope
04/28/2026
Objection raised — Structural
04/17/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
04/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/16/2026
Filed — New Building
Proposed installation of new curb cut in conjunction with NB#B08042136-I1
B08042136-S5
04/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/02/2026
Objection raised — Admin
04/02/2026
Objection raised — Zoning
04/02/2026
Objection raised — Energy
04/02/2026
Objection raised — Mechanical
03/19/2026
Filed — New Building
Proposed installation of new curb cut in conjunction with NB#B08042136-I1
B08042136-S4
03/19/2026
Permit issued — Plumbing
B08042136-S2-PL
03/19/2026
Special inspection requirement — Shutoff dampers
Younes Abouyaala
03/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
03/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
03/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
03/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
03/18/2026
Special inspection requirement — Final
NAVEEN KUMAR
03/18/2026
Special inspection requirement — Heating Systems
Younes Abouyaala
03/18/2026
Special inspection requirement — Preliminary
Younes Abouyaala
03/18/2026
Special inspection requirement — Lowest Floor Elevation
Younes Abouyaala
03/18/2026
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
03/18/2026
Special inspection requirement — Mechanical Systems
Younes Abouyaala
03/18/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
03/05/2026
Permit issued — Sidewalk Shed
B01236008-I1-SH
02/25/2026
Violation issued (ECB, closed)
Construction
02/17/2026
Objection resolved — Addressed
02/17/2026
Objection resolved — Addressed
02/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZARINA KINDO
01/22/2026
Objection resolved — Addressed
12/18/2025
Objection resolved — Addressed
11/26/2025
Objection resolved — Addressed
11/26/2025
Special inspection requirement — Energy Code Compliance Inspections
ZARINA KINDO
11/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
ZARINA KINDO
11/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
ZARINA KINDO
11/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ZARINA KINDO
11/05/2025
Violation issued (ECB, closed)
Construction
10/24/2025
Violation issued (ECB, closed)
Construction
09/12/2025
Permit issued — Protection and Mechanical Methods
B01207561-I1-PMM
Latest 60 of 126 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupport of ExcavationSigned-offLKC GROUP09/14/2026
DOB NOWSprinklersPermit IssuedMEGA PLBG CORP08/27/2026
DOB NOWStructuralPermit IssuedLKC GROUP08/25/2026
DOB NOWCurb CutPermit IssuedLKC GROUP08/20/2026
DOB NOWMechanical SystemsPermit IssuedLKC GROUP08/19/2026
DOB NOWGeneral ConstructionPermit IssuedLKC GROUP07/27/2026
DOB NOWSidewalk ShedSigned-offPROFESSIONAL LINE CORP06/01/2026
DOB NOWConstruction FencePermit IssuedLKC GROUP05/13/2026
DOB NOWGeneral ConstructionPermit IssuedLKC GROUP05/05/2026
DOB NOWPlumbingPermit IssuedMEGA PLBG CORP03/19/2026
DOB NOWSidewalk ShedSigned-offPROFESSIONAL LINE CORP03/05/2026
DOB NOWProtection and Mechanical MethodsSigned-offLKC GROUP09/12/2025
DOB NOWSidewalk ShedSigned-offPROFESSIONAL LINE CORP06/06/2025
DOB NOWGeneral ConstructionPermit IssuedLKC GROUP04/25/2025
DOB NOWConstruction FencePermit IssuedLKC GROUP04/24/2025
DOB NOWGeneral ConstructionPermit IssuedLKC GROUP03/25/2025
DOB NOWConstruction FencePermit IssuedLKC GROUP01/15/2025
DOB NOWFoundationPermit IssuedLKC GROUP07/10/2024
DOB NOWConstruction FencePermit IssuedLKC GROUP06/18/2024
DOB NOWConstruction FencePermit IssuedAAKASH CONSTRUCTION INC06/15/2022
BIS—ISSUED1ST EXCAVATION GROUP OF N05/17/2017
BIS—ISSUED4TH BRIGHTON REALTY LLC02/21/2017
BISEQISSUED1ST EXCAVATION GROUP OF N01/10/2017
BIS—ISSUED1ST EXCAVATION GROUP OF N01/10/2017
1 project · most recent 08/19/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/19/2026Permit IssuedLKC GROUPHeating and Air Conditioning Systems
Heat / Cool
1 project · most recent 08/19/2026
Sprinkler System
FiledStatusContractorScope
08/19/2026Permit IssuedREAL PLUMBING CORPSprinkler System
1 project · most recent 08/19/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/19/2026Permit IssuedMEGA PLBG CORPStorm, Water/Sanitary
3 projects · most recent 06/04/2026
General Wiring
FiledStatusContractorScope
06/04/2026Permit IssuedFIBERTEK DATA & ELEC CORP—
01/08/2026Permit IssuedACCURATE ELEC'L CORP.General Wiring
06/06/2025CompleteRICHARD NEU—
1 project · most recent 07/01/2024
FiledStatusContractorScope
07/01/2024Signed-offLKC GROUP2 scope_items
4 projects · most recent 07/26/2025
Sidewalk Shed Fence
FiledStatusContractorScope
07/26/2025Signed-offPROFESSIONAL LINE CORPSidewalk Shed
04/23/2025——Sidewalk Shed
05/31/2024Permit IssuedLKC GROUPFence
03/16/2022Permit IssuedAAKASH CONSTRUCTION INCFence
1 project · most recent 07/01/2024
Earthwork
FiledStatusContractorScope
07/01/2024Signed-offLKC GROUPEarthwork
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/17/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/15/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
06/02/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
05/08/2026Maintenance informationYounes Abouyaalaenergy_progress
03/19/2026Shutoff dampersYounes Abouyaalaenergy_progress
03/18/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
03/18/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
03/18/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
03/18/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
03/18/2026FinalNAVEEN KUMARprogress
03/18/2026Heating SystemsYounes Abouyaalaspecial
03/18/2026PreliminaryYounes Abouyaalaprogress
03/18/2026Lowest Floor ElevationYounes Abouyaalaprogress
03/18/2026Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
03/18/2026Mechanical SystemsYounes Abouyaalaspecial
03/18/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
02/17/2026Fire-Resistant Penetrations and JointsZARINA KINDOspecial
11/26/2025Energy Code Compliance InspectionsZARINA KINDOprogress
11/26/2025HVAC-R and service water heating equipmentZARINA KINDOenergy_progress
11/26/2025HVAC-R and service water heating system controlsZARINA KINDOenergy_progress
11/26/2025HVAC-R and service water piping design and insulationZARINA KINDOenergy_progress
04/22/2025Sprinkler SystemsYounes Abouyaalaspecial
09/26/2024Fenestration and door U-factor and product ratingsZARINA KINDOenergy_progress
08/28/2024FinalLeonid Krupnikprogress
05/30/2024Footing and FoundationLeonid Krupnikprogress
05/30/2024FinalLeonid Krupnikprogress
11/17/2022Concrete - Cast-In-PlaceLeonid Krupnikspecial
Latest 25 of 39.
▾Documents — 96 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/25/2026B08006843-P1Request digital key ↗
08/24/2026B01059134-I1Request digital key ↗
08/24/2026B08042136-S6Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION3
05/18/2017321395398Open ↗
02/22/2017321310318Open ↗
01/10/2017321395398Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
08/11/2016321310318Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B08042136-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B08042136-I1Open ↗
▸Seals & Professional Certifications31
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/25/2026B08006843-P1Open ↗
08/25/2026B08006843-I1Open ↗
08/24/2026B01059134-S1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/30/2026B08042136-S2Open ↗
09/30/2026B08042136-S2Open ↗
09/01/2026B08042136-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/30/2026B08042136-S2Open ↗
08/30/2026B08042136-S4Open ↗
08/25/2026B08042136-I1Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment5
▸BISELECTRIC CUT-OFF2
02/22/2017321310318Open ↗
01/10/2017321395398Open ↗
▸BISWATER CUT-OFF1
02/22/2017321310318Open ↗
▸BISSEWER CUT-OFF1
01/10/2017321395398Open ↗
▸BISGAS CUT-OFF1
01/10/2017321395398Open ↗
▸Safety & Tenant Protection11
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE3
05/18/2017321395398Open ↗
01/10/2017321395398Open ↗
01/10/2017321395398Open ↗
▸BISANTI-HARASSMENT CHECKLIST2
02/22/2017321310318Open ↗
01/10/2017321395398Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST2
02/22/2017321310318Open ↗
01/10/2017321395398Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
02/22/2017321310318Open ↗
01/10/2017321395398Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B08042136-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B08042136-I1Open ↗
▸Environmental & Asbestos3
▸BISRODENT CONTROL2
05/18/2017321395398Open ↗
01/10/2017321395398Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
01/10/2017321395398Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B08042136-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B08042136-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/05/2017321395398Open ↗
01/05/2017321395398Open ↗
▸BISLANDMARKS APPROVAL1
01/10/2017321395398Open ↗
▸Cost, Insurance & Ownership6
▸BISAcord 25 (Acord Certificate of Liability Insurance)3
05/18/2017321395398Open ↗
05/18/2017321395398Open ↗
01/10/2017321395398Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE2
05/18/2017321395398Open ↗
01/10/2017321395398Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
05/18/2017321395398Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION4
05/18/2017321395398Open ↗
03/07/2017321310318Open ↗
03/07/2017321310318Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
08/11/2016321310318Open ↗
08/01/2016321395398Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial2
08/24/2026B08042136-S6Open ↗
08/13/2026B08042136-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B01059134-I1Open ↗
08/13/2026B01059134-S1Open ↗
▸BISSupporting Document: Fee Deferment1
01/05/2017321395398Open ↗
▸BISSupporting Document: Fee Exempt1
02/14/2017321310318Open ↗
▸DOB NOWProperty Ownership Certification1
08/17/2026B08042136-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B08042136-I1Open ↗