DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB10/01/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB12/31/2009V-DOB VIOLATION - ACTIVE
DOB01/01/2009V-DOB VIOLATION - ACTIVE
DOB01/03/2008V-DOB VIOLATION - ACTIVE
DOB01/19/2007V-DOB VIOLATION - ACTIVE
DOB01/06/2006V-DOB VIOLATION - ACTIVE
DOB01/31/2005V-DOB VIOLATION - ACTIVE
DOB02/13/2004V-DOB VIOLATION - ACTIVE
DOB03/19/2003V-DOB VIOLATION - ACTIVE
DOB03/26/2002V-DOB VIOLATION - ACTIVE
DOB08/29/1995V-DOB VIOLATION - ACTIVE
DOB07/25/1994V-DOB VIOLATION - ACTIVE
ECB05/14/2010BC1509.9 MISC COMBUSTIBLE ROOF STRUCTURES THE FOLLOWING ROOF IS COVERING ENTIRE W/ COMBUSTIBLE DECK MATERIAL AT 1STORY REAR PORTION ON BLDG FRAMMING DUCKBOARDING OR DECKING IS NOT TO EXCEED MORE THAN 20PERCENTNothing owed — awaiting certificate of correction
ECB05/14/2010OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERT OF OCCUPANCY OR BLDG DEPT RECORDS CERT OF OCCUPANCY STATES PREMISES AS RETAIL STORES AT 1ST FL & TWO FAMILY DWELLINGS AT 2ND FL NOW 2ND FL CONVERTED ENTIRE TO COMMNothing owed — awaiting certificate of correction