← Back
Office only, 2-6 stories
2925 AVENUE U
BROOKLYN · BIN 3198901
💬 Discuss this project
1958Year Built
2Stories
O2Building Class
R4Zoning
10,116 sfGross Floor Area
1Units
2 Open Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
Office only, 2-6 stories · 35,670 sf lot · 0.28 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof6p · 2 filings · 20 docs
Floor 24p · 2 filings · 20 docs
Floor 1
Cellar4p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FLAGSTAR BANK N A607/08/2026
FLAGSTAR BANK, N.A.603/22/2026
ROSLYN SAVINGS BANK703/22/2026
ROOSEVELT SAVINGS BANK103/22/2026
ROSELYN SAVING BANK103/21/2026
GEM REALTY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KMB DESIGN GROUP, LLC304/09/2025
LEON SKVIRSKY PE310/19/2023
STRATFORD ENGINEERING210/19/2020
CHARLES G. MICHEL ENGINEERING, PC.208/03/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV ASSOCIATES803/21/2026
BUILDING BROTHERS603/21/2026
MUNICIPAL BUILDING CONSULTANTS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DYNAIRE LLCGeneral Contractor603/21/2026
PAIGE, JAMES ROBERTElectrical403/21/2026
GOING SIGN SVCNGScaffold307/08/2026
ARTISAN SERVICES INCGeneral Contractor203/21/2026
MACCARONE PLUMBING INCPlumbing207/08/2026
PEREIRA, WESLLEYElectrical103/21/2026
MACCARONE PLUMBINGGeneral Contractor103/22/2026
ALPHONSE, MICHAELElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KMB DESIGN GROUP, LLC513204/09/2025
STRATFORD ENGINEERING997108/13/2019
CHARLES G MICHEL ENGINEER2871108/09/2019
Building Lifecycle
All (98)Filed (10)Permit Issued (8)Signed Off (7)Violation (29)Inspection (4)Objection (20)Special Inspection (20)
05/07/2025
Signed off — Alteration
PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01138315-I1
05/01/2025
Signed off — Alteration
PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01138315-S1
04/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/23/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Bray
04/11/2025
Objection raised — Scope
04/11/2025
Objection resolved — Addressed
04/09/2025
Filed — Alteration
PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01138315-P1
04/07/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/03/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/04/2025
Permit issued — Plumbing
B01138315-S1-PL
01/28/2025
Permit issued — General Construction
B01138315-I1-GC
01/15/2025
Objection resolved — Addressed
01/07/2025
Objection resolved — Addressed
12/31/2024
Objection resolved — Addressed
12/23/2024
Objection resolved — Addressed
12/17/2024
Objection raised — Scope
12/17/2024
Objection raised — Scope
12/17/2024
Objection raised — Scope
12/17/2024
Objection raised — Accessibility
12/06/2024
Filed — Alteration
PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01138315-I1
12/06/2024
Filed — Alteration
PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01138315-S1
04/11/2024
Signed off — Alteration
INSTALL EXTERIOR NON-ILLUMINATED WALL SIGN (FLAGSTAR)
B00938818-I1
04/11/2024
Signed off — Alteration
B00938817-I1
04/11/2024
Signed off — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (FLAGSTAR)
B00938807-I1
11/06/2023
Permit issued — Sign
B00938807-I1-SG
11/06/2023
Permit issued — Sign
B00938818-I1-SG
11/06/2023
Permit issued — Sign
B00938817-I1-SG
10/19/2023
Filed — Alteration
INSTALL EXTERIOR NON-ILLUMINATED WALL SIGN (FLAGSTAR)
B00938818-I1
10/19/2023
Filed — Alteration
B00938817-I1
10/19/2023
Filed — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (FLAGSTAR)
B00938807-I1
09/25/2023
Special inspection requirement — Final
LEON SKVIRSKY
09/13/2021
Violation issued (FDNY_NOV, closed)
06/30/2021
Signed off — Alteration
PROPOSED STRUCTURAL WORK RELATED TO INSTALLATION OF HVAC UNITS, DUCTS AND PIPIING WORK. ALL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00204240-I1
06/28/2021
Signed off — Alteration
Installation of new HVAC units with ducts and piping work. All as per plans filed herewith. No change in use, egress or occupancy.
B00204113-I1
06/07/2021
Permit issued — Structural
B00204240-I1-ST
10/27/2020
Special inspection requirement — Final
Xianzhang Chen
10/27/2020
Special inspection requirement — Structural Steel - High Strength Bolting
Xianzhang Chen
10/27/2020
Special inspection requirement — Structural Stability – Alterations of existing buildings
Xianzhang Chen
10/27/2020
Special inspection requirement — Structural Steel - Welding
Xianzhang Chen
10/27/2020
Special inspection requirement — Structural Steel - Details
Xianzhang Chen
10/22/2020
Objection resolved — Addressed
10/21/2020
Objection raised — Admin
10/19/2020
Filed — Alteration
PROPOSED STRUCTURAL WORK RELATED TO INSTALLATION OF HVAC UNITS, DUCTS AND PIPIING WORK. ALL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00204240-P1
10/08/2020
Permit issued — Mechanical Systems
B00204113-I1-MS
10/01/2020
Violation issued (ECB, closed)
Elevators
09/09/2020
Permit issued — Mechanical Systems
B00204113-I1-MS
08/05/2020
Special inspection requirement — HVAC insulation and sealing
Charles Michel
08/05/2020
Special inspection requirement — HVAC and service water heating equipment
Charles Michel
08/05/2020
Special inspection requirement — Final
Charles Michel
08/05/2020
Special inspection requirement — Duct leakage testing
Charles Michel
08/05/2020
Special inspection requirement — HVAC and service water heating system controls
Charles Michel
08/05/2020
Special inspection requirement — Maintenance information
Charles Michel
08/05/2020
Special inspection requirement — Shutoff dampers
Charles Michel
08/05/2020
Special inspection requirement — Mechanical Systems
Charles Michel
08/03/2020
Filed — Alteration
Installation of new HVAC units with ducts and piping work. All as per plans filed herewith. No change in use, egress or occupancy.
B00204113-P1
06/09/2020
Special inspection requirement — Structural Steel - Welding
Xianzhang Chen
06/09/2020
Special inspection requirement — Structural Steel - High Strength Bolting
Xianzhang Chen
06/09/2020
Special inspection requirement — Structural Steel - Details
Xianzhang Chen
06/09/2020
Special inspection requirement — Structural Stability – Alterations of existing buildings
Xianzhang Chen
Latest 60 of 98 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMACCARONE PLUMBING INC02/04/2025
DOB NOWGeneral ConstructionSigned-offWILMA ABREU01/28/2025
DOB NOWSignSigned-offPOLSINELLI, HENRY11/06/2023
DOB NOWSignSigned-offPOLSINELLI, HENRY11/06/2023
DOB NOWSignSigned-offPOLSINELLI, HENRY11/06/2023
DOB NOWStructuralSigned-offDYNAIRE06/07/2021
DOB NOWMechanical SystemsSigned-offDYNAIRE10/08/2020
DOB NOWMechanical SystemsSigned-offDYNAIRE09/09/2020
BISMHISSUEDCOOL BREEZE AIR CON INC09/16/2002
BISOTISSUEDW.E. BONNIE CONTRACTING INC.07/14/2000
BIS—ISSUEDGOING SIGN & SVCNG CO,INC08/17/1999
BIS—ISSUEDGOING SIGN & SVCNG CO,INC08/17/1999
BIS—ISSUEDGOING SIGN & SVCNG CO,INC08/17/1999
BISMHISSUEDROOSEVELT SAVINGS BANK03/14/1994
4 projects · most recent 04/09/2024
General Wiring
FiledStatusContractorScope
04/09/2024CompleteRAINBOW ELECTRIC CO., INC—
04/09/2024CompleteRAINBOW ELECTRIC CO., INC—
11/02/2020CompleteINTERPHASE ELECTRIC CORP.General Wiring
08/12/2019Permit IssuedNEE ELECTRICAL, LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
04/14/2025Fire-Resistant Penetrations and JointsStephen Brayspecial
09/25/2023FinalLEON SKVIRSKYprogress
10/27/2020FinalXianzhang Chenprogress
10/27/2020Structural Steel - High Strength BoltingXianzhang Chenspecial
10/27/2020Structural Stability – Alterations of existing buildingsXianzhang Chenspecial
10/27/2020Structural Steel - WeldingXianzhang Chenspecial
10/27/2020Structural Steel - DetailsXianzhang Chenspecial
08/05/2020HVAC insulation and sealing Charles Michelenergy_progress
08/05/2020HVAC and service water heating equipment Charles Michelenergy_progress
08/05/2020FinalCharles Michelprogress
08/05/2020Duct leakage testing Charles Michelenergy_progress
08/05/2020HVAC and service water heating system controls Charles Michelenergy_progress
08/05/2020Maintenance informationCharles Michelenergy_progress
08/05/2020Shutoff dampersCharles Michelenergy_progress
08/05/2020Mechanical SystemsCharles Michelspecial
06/09/2020Structural Steel - WeldingXianzhang Chenspecial
06/09/2020Structural Steel - High Strength BoltingXianzhang Chenspecial
06/09/2020Structural Steel - DetailsXianzhang Chenspecial
06/09/2020Structural Stability – Alterations of existing buildingsXianzhang Chenspecial
06/09/2020Final—progress
▾Documents — 72 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch6
08/26/2026B00938818-I1Request digital key ↗
08/26/2026B00938807-I1Request digital key ↗
08/26/2026B00938817-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Structural2
08/15/2026B00204240-I1Request digital key ↗
08/15/2026B00204240-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00204113-I1Request digital key ↗
08/15/2026B00204113-P1Request digital key ↗
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION6
10/26/2020321569673Open ↗
08/27/2020321569673Open ↗
08/10/2020321569673Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION1
04/30/2021321569673Open ↗
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/26/2026B00938818-I1Open ↗
08/26/2026B00938807-I1Open ↗
08/26/2026B00938817-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/27/2026B00204113-I1Open ↗
08/27/2026B00204113-I1Open ↗
08/27/2026B00204113-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/30/2026B01138315-S1Open ↗
08/28/2026B00204240-P1Open ↗
08/27/2026B00204113-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
08/22/2019321569673Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
10/09/2012320330566Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/23/2026B01138315-I1Open ↗
08/23/2026B01138315-S1Open ↗
08/15/2026B01138315-P1Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
07/12/2011320330566Open ↗
07/12/2011320330566Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/08/2021321569673Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
10/26/2020321569673Open ↗
▸Energy Compliance2
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/28/2021321569673Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00204113-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/16/2021321569673Open ↗
04/30/2021321569673Open ↗
▸BISFINAL INSPECTION2
06/16/2021321569673Open ↗
06/16/2021321569673Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
06/16/2021321569673Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
06/28/2021321569673Open ↗
11/30/2012320330566Open ↗
11/07/2012320330566Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/12/2011320330566Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/07/2012320330566Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
08/22/2019321569673Open ↗
11/07/2012320330566Open ↗
07/12/2011320330566Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
06/16/2021321569673Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
08/22/2019321569673Open ↗
07/12/2011320330566Open ↗
▸BISADDITIONAL INFORMATION1
01/08/2021321569673Open ↗