← Back
Two family frame
2927 GRACE AVENUE
BRONX · BIN 2112912
💬 Discuss this project
2003Year Built
2Stories
B2Building Class
R4Zoning
2,040 sfGross Floor Area
2Units
Two family frame · 2,375 sf lot · 0.86 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 6 docs
Floor 29p · 1 filing · 20 docs
Floor 19p · 1 filing · 20 docs
Sub-Basement9p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CAVA CONSTRUCTION403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREEN RIVER ENVIRONMENTAL ENGINEERI112/12/2024
BADALY ENGINEERING PLLC307/20/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NY State Solar LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JAMIE MINNICKElectrical303/21/2026
NOBLE CONSTRUCTION BX INCGeneral Contractor303/21/2026
NYSS LLCGeneral Contractor303/21/2026
SERAFIM TSIOUGRISElectrical103/21/2026
ROY B PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREEN RIVER ENVIRONMENTAL7841112/12/2024
BADALY ARCHITECT PLLC7137307/20/2023
Building Lifecycle
All (29)Filed (4)Permit Issued (3)Signed Off (1)Inspection (2)Special Inspection (19)
06/11/2025
Signed off — Alteration
X01135538-I1
12/16/2024
Permit issued — Solar
X01135538-I1-SL
12/12/2024
Filed — Alteration
X01135538-I1
10/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT MASONE
10/31/2024
Special inspection requirement — Air barrier - visual inspection
ROBERT MASONE
10/31/2024
Special inspection requirement — Final
ROBERT MASONE
10/31/2024
Special inspection requirement — Energy Code Compliance Inspections
ROBERT MASONE
10/31/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT MASONE
02/26/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/18/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/21/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHIN BADALY
07/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHIN BADALY
07/21/2023
Special inspection requirement — HVAC-R and service water heating system controls
SHAHIN BADALY
07/21/2023
Special inspection requirement — Permanent certificate
SHAHIN BADALY
07/21/2023
Special inspection requirement — HVAC-R and service water heating equipment
SHAHIN BADALY
07/21/2023
Special inspection requirement — Maintenance information
SHAHIN BADALY
07/20/2023
Filed — Alteration
RENOVATION OF EXISTING 2-FAMILY AS PER PLANS.
X00858592-P1
07/13/2023
Special inspection requirement — Permanent certificate
SHAHIN BADALY
07/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHIN BADALY
07/13/2023
Special inspection requirement — HVAC-R and service water heating system controls
SHAHIN BADALY
07/13/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHIN BADALY
07/13/2023
Special inspection requirement — Maintenance information
SHAHIN BADALY
07/13/2023
Special inspection requirement — HVAC-R and service water heating equipment
SHAHIN BADALY
06/15/2023
Permit issued — Plumbing
X00858592-S1-PL
06/08/2023
Filed — Alteration
RENOVATION OF EXISTING 2-FAMILY AS PER PLANS.
X00858592-S1
05/25/2023
Permit issued — General Construction
X00858592-I1-GC
05/09/2023
Filed — Alteration
RENOVATION OF EXISTING 2-FAMILY AS PER PLANS.
X00858592-I1
04/12/2023
Special inspection requirement — Final
SHAHIN BADALY
04/12/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
SHAHIN BADALY
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYSS LLC12/16/2024
DOB NOWPlumbingPermit IssuedROY B PLUMBING & HEATING06/15/2023
DOB NOWGeneral ConstructionPermit IssuedNOBLE CONSTRUCTION BX INC05/25/2023
BIS—ISSUEDCAVA CONSTRUCTION INC.03/03/2005
BIS—ISSUEDCAVA CONSTRUCTION INC.01/04/2005
BIS—ISSUEDCAVA CONSTRUCTION INC.03/10/2004
BIS—ISSUEDCAVA CONSTRUCTION INC.09/22/2003
2 projects · most recent 03/18/2025
General Wiring
FiledStatusContractorScope
03/18/2025CompleteNY SOLAR ELECTRICAL LLC—
04/25/2023CompleteATTRACTIVE LIGHTING ELECLGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/26/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
10/31/2024Fire-Resistant Penetrations and JointsROBERT MASONEspecial
10/31/2024Air barrier - visual inspectionROBERT MASONEenergy_progress
10/31/2024FinalROBERT MASONEprogress
10/31/2024Energy Code Compliance InspectionsROBERT MASONEprogress
10/31/2024Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
07/21/2023HVAC-R and service water piping design and insulationSHAHIN BADALYenergy_progress
07/21/2023Fire-Resistant Penetrations and JointsSHAHIN BADALYspecial
07/21/2023HVAC-R and service water heating system controlsSHAHIN BADALYenergy_progress
07/21/2023Permanent certificateSHAHIN BADALYenergy_progress
07/21/2023HVAC-R and service water heating equipmentSHAHIN BADALYenergy_progress
07/21/2023Maintenance informationSHAHIN BADALYenergy_progress
07/13/2023Permanent certificateSHAHIN BADALYenergy_progress
07/13/2023Fire-Resistant Penetrations and JointsSHAHIN BADALYspecial
07/13/2023HVAC-R and service water heating system controlsSHAHIN BADALYenergy_progress
07/13/2023HVAC-R and service water piping design and insulationSHAHIN BADALYenergy_progress
07/13/2023Maintenance informationSHAHIN BADALYenergy_progress
07/13/2023HVAC-R and service water heating equipmentSHAHIN BADALYenergy_progress
04/12/2023FinalSHAHIN BADALYprogress
04/12/2023Structural Stability – Alterations of existing buildingsSHAHIN BADALYspecial
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/22/2026X00858592-P1Request digital key ↗
08/22/2026X00858592-S1Request digital key ↗
08/22/2026X00858592-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature13
09/23/2026X00858592-S1Open ↗
09/23/2026X00858592-S1Open ↗
09/23/2026X00858592-S1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/22/2026X00858592-S1Open ↗
08/13/2026X00858592-P1Open ↗
08/13/2026X00858592-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026X00858592-S1Open ↗
08/27/2026X00858592-I1Open ↗
08/26/2026X00858592-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/22/2026X00858592-S1Open ↗
08/13/2026X00858592-I1Open ↗
08/13/2026X00858592-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01135538-I1Open ↗