Predominantly retail with other uses
2929 3 AVENUE
BRONX · BIN 2001350
💬 Discuss this project
1931Year Built
5Stories
K4Building Class
C4-4Zoning
27,730 sfGross Floor Area
2Units
LL97 Covered0 Open Violations
Predominantly retail with other uses · Owner of record: A&S 2929 LLC · 5,702 sf lot · 4.86 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof4p · 2 filings · 20 docs
Floor 515p · 5 filings · 20 docs
Floor 419p · 3 filings · 20 docs
Floor 314p · 3 filings · 20 docs
Floor 216p · 4 filings · 20 docs
Floor 1Under Construction13p · 4 filings · 20 docs
CellarUnder Construction9p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AMERICAN OUTLET 1186209/29/2026
A S 29291007/08/2026
HENERY MODEU CO INC103/22/2026
OWNER OF 2929 3 AVENUE103/22/2026
MODELLS DEPARTMENT STO103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/22/2020$4.0M—HENRY MODELL & COMPANY INC. → A&S 2929 LLC$144/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NAGAN EX CONSULTANTS3003/21/2026
HH BUILDING CONSULTING & ARCHITECTU203/21/2026
DIMO DESIGN403/21/2026
A1 EXPEDITING SERVICE203/21/2026
RITE ONE EXPEDITING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RMAC CONSTRUCTION CORPGeneral Contractor809/29/2026
AIRMARK HVAC, LLCGeneral Contractor303/21/2026
SJG CONSTRUCTION CORPGeneral Contractor207/08/2026
AKM CONSTRUCTION NY CORPGeneral Contractor203/21/2026
CASE PLUMBING LLCFire Protection207/08/2026
ORBIT PLBG & HTG INCPlumbing209/03/2026
ORBIT SPRINKLER CORPFire Protection207/08/2026
S & L PLUMBING INCPlumbing107/08/2026
INTERSYSTEM INSTALLATIONGeneral Contractor107/08/2026
TOWER CREATIONS CORPGeneral Contractor107/08/2026
DELTA-SIGMA MECH CORPPlumbing107/08/2026
GIUSEPPE ANZALONEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CITY SAFETY COMPLIANCE CO8919103/05/2026
PRUDIGM ENGINEERING LLCU4304312/11/2023
AKS ARCHITECTURAL & ENGIN1957607/14/2023
DIMO ENGINEERING PC4121406/07/2023
JACK GREEN ASSOCIATES422102/24/2021
Building Lifecycle
All (154)Filed (22)Permit Issued (18)Signed Off (10)Violation (54)Inspection (20)Special Inspection (30)
09/28/2026
Permit issued — General Construction
X01358504-I1-GC
09/02/2026
Permit issued — Plumbing
X01358504-S1-PL
03/06/2026
Filed — Alteration CO
Install plumbing fixtures as shown on plans.
X01358504-S1
03/05/2026
Filed — Alteration CO
Install plumbing fixtures as shown on plans.
X01358504-I1
02/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENIA MASUCCI
02/12/2026
Special inspection requirement — Energy Code Compliance Inspections
ERROL MCINTOSH
02/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
ERROL MCINTOSH
02/12/2026
Special inspection requirement — Fenestration air leakage
ERROL MCINTOSH
02/12/2026
Special inspection requirement — Maintenance information
ERROL MCINTOSH
02/12/2026
Special inspection requirement — Interior lighting power
ERROL MCINTOSH
02/12/2026
Special inspection requirement — Fenestration areas
ERROL MCINTOSH
02/12/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
ERROL MCINTOSH
02/12/2026
Special inspection requirement — Air barrier - visual inspection
ERROL MCINTOSH
02/12/2026
Special inspection requirement — Lighting controls
ERROL MCINTOSH
02/12/2026
Special inspection requirement — Insulation placement and R values
ERROL MCINTOSH
01/09/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/04/2024
Signed off — Alteration
Removal and construction of partitions, flooring and ceilings. Installation of HVAC equipment. No change to egress, use or occupancy.
X00662923-I1
01/04/2024
Signed off — Alteration
Modification to sprinkler system as shown on plans. No change to egress use or occupancy
X00953780-I1
12/21/2023
Signed off — Alteration
Rearrangement of partitions and HVAC system as show on plans. No change in use, occupancy or egress.
X00942809-I1
12/21/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/11/2023
Filed — Alteration
Rearrangement of partitions and HVAC system as show on plans. No change in use, occupancy or egress.
X00942809-P1
12/06/2023
Special inspection requirement — Mechanical Systems
Naeem Anwar
12/06/2023
Special inspection requirement — Final
Naeem Anwar
12/06/2023
Special inspection requirement — Fire-Resistance Rated Construction
Naeem Anwar
12/06/2023
Special inspection requirement — Maintenance information
Naeem Anwar
12/06/2023
Special inspection requirement — Lighting controls
Naeem Anwar
12/06/2023
Special inspection requirement — Interior lighting power
Naeem Anwar
12/06/2023
Special inspection requirement — Insulation placement and R values
Naeem Anwar
12/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Naeem Anwar
12/06/2023
Special inspection requirement — Energy Code Compliance Inspections
Naeem Anwar
11/27/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/20/2023
Permit issued — Sprinklers
X00953780-I1-EW-SP
10/31/2023
Filed — Alteration
Modification to sprinkler system as shown on plans. No change to egress use or occupancy
X00953780-I1
10/26/2023
Special inspection requirement — Sprinkler Systems
Naeem Anwar
10/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Naeem Anwar
10/20/2023
Permit issued — General Construction
X00942809-I1-GC-CX
10/10/2023
Filed — Alteration
Rearrangement of partitions and HVAC system as show on plans. No change in use, occupancy or egress.
X00942809-I1
07/28/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/26/2023
Signed off — Alteration
PROPOSING HEREWITH NEW INTERIOR WORK INCLUDING NEW NON-BEARING PARTITIONS NEW DOORS PARTIAL CEILING WORK AND PROPOSING TO ENCLOSE EXISTING CONVENIENT STAIR BETWEEN FIRST AND SECOND FLOORS USE AND OCCUPANCY CHANGE FILED UNDER APPLICATION X00635014-I1
X00796352-I1
07/25/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/18/2023
Signed off — Alteration
APPLICATION HEREBYFILED PROPOSING TO INSTALL NEW PLUMBING FIXTURES AND MODIFY EXISTING SPRINKLER SYSTEM
X00791017-I1
07/14/2023
Filed — Alteration
Removal and construction of partitions, flooring and ceilings. Installation of HVAC equipment. No change to egress, use or occupancy.
X00662923-P2
07/13/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
REZA KHAMCY
07/13/2023
Special inspection requirement — Final
Giuseppe Anzalone
07/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
REZA KHAMCY
07/13/2023
Special inspection requirement — Mechanical Systems
REZA KHAMCY
07/13/2023
Special inspection requirement — Energy Code Compliance Inspections
REZA KHAMCY
07/13/2023
Special inspection requirement — Fire-Resistance Rated Construction
REZA KHAMCY
07/13/2023
Special inspection requirement — HVAC-R and service water heating system controls
REZA KHAMCY
07/13/2023
Special inspection requirement — HVAC-R and service water heating equipment
REZA KHAMCY
06/21/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/16/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/15/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/13/2023
Filed — Alteration CO
No work application filed for change of use only. Change use of 2nd floor from store to community facility. Change use of 3rd through 5th floors from storage to offices. GC,, ME,, PL, SP andFA to be filed under separate applications
X00635014-P2
06/07/2023
Filed — Alteration
APPLICATION HEREBYFILED PROPOSING TO INSTALL NEW PLUMBING FIXTURES AND MODIFY EXISTING SPRINKLER SYSTEM
X00791017-P2
06/07/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/05/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/26/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/21/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/03/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
Latest 60 of 154 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedRMAC CONSTRUCTION CORP09/28/2026
DOB NOWPlumbingPermit IssuedORBIT PLBG & HTG INC09/02/2026
DOB NOWSprinklersSigned-offORBIT SPRINKLER CORP11/20/2023
DOB NOWGeneral ConstructionSigned-offRMAC CONSTRUCTION CORP10/20/2023
DOB NOWGeneral ConstructionSigned-offTOWER CREATIONS CORP01/11/2023
DOB NOWGeneral ConstructionPermit IssuedSJG CONSTRUCTION CORP12/27/2022
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC10/31/2022
DOB NOWSprinklersSigned-offORBIT SPRINKLER CORP10/31/2022
DOB NOWGeneral ConstructionSigned-offRMAC CONSTRUCTION CORP09/02/2022
DOB NOWGeneral ConstructionSigned-offRMAC CONSTRUCTION CORP09/02/2022
DOB NOWPlumbingSigned-offS & L PLUMBING INC08/01/2022
DOB NOWPlumbingSigned-offS & L PLUMBING INC07/25/2022
DOB NOWSidewalk ShedSigned-offAKM CONSTRUCTION NY05/26/2022
DOB NOWPlumbingSigned-offDELTA-SIGMA MECH CORP05/24/2022
DOB NOWGeneral ConstructionSigned-offAIRMARK HVAC, LLC05/20/2022
DOB NOWGeneral ConstructionSigned-offSJG CONSTRUCTION CORP05/18/2022
DOB NOWSprinklersSigned-offS & L PLUMBING INC04/26/2021
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION05/07/2020
BISOTISSUEDMODELL'S SPROTING GOODS05/05/2006
BISEQISSUEDSTONELEDGE SCAFFOLDING CORP08/16/2005
BISBLISSUEDDUAL FUEL PLG & HTG12/21/2000
BISPLISSUEDDUAL FUEL PLG & HTG12/21/2000
1 project · most recent 03/06/2026
Water/Sanitary
FiledStatusContractorScope
03/06/2026Permit IssuedORBIT PLBG & HTG INCWater/Sanitary
5 projects · most recent 10/18/2023
General Wiring
FiledStatusContractorScope
10/18/2023CompleteKINGS ELECTRIC CO., INC.General Wiring
02/22/2023CompleteACCURATE ELEC'L CORP.General Wiring
05/25/2022CompleteNASH ELECTRIC SERVICES IN—
05/14/2021CompleteSTAR ELEC'L CONTRACTORS C—
04/27/2020CompleteSTEVEN FARKAS—
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
01/09/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/21/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/27/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/28/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/21/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/16/2023Pass-Final CND-Occupancy InspectionPassView ↗
06/15/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/07/2023Fail-Final CND-Occupancy InspectionFailView ↗
06/05/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/26/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/27/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/08/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/10/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/15/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/12/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/01/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/21/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
02/12/2026Fire-Resistant Penetrations and JointsEUGENIA MASUCCIspecial
02/12/2026Energy Code Compliance InspectionsERROL MCINTOSHprogress
02/12/2026Fire-Resistance Rated ConstructionERROL MCINTOSHprogress
02/12/2026Fenestration air leakageERROL MCINTOSHenergy_progress
02/12/2026Maintenance informationERROL MCINTOSHenergy_progress
02/12/2026Interior lighting powerERROL MCINTOSHenergy_progress
02/12/2026Fenestration areasERROL MCINTOSHenergy_progress
02/12/2026Fenestration and door U-factor and product ratingsERROL MCINTOSHenergy_progress
02/12/2026Air barrier - visual inspectionERROL MCINTOSHenergy_progress
02/12/2026Lighting controlsERROL MCINTOSHenergy_progress
02/12/2026Insulation placement and R valuesERROL MCINTOSHenergy_progress
12/06/2023Mechanical SystemsNaeem Anwarspecial
12/06/2023FinalNaeem Anwarprogress
12/06/2023Fire-Resistance Rated ConstructionNaeem Anwarprogress
12/06/2023Maintenance informationNaeem Anwarenergy_progress
12/06/2023Lighting controlsNaeem Anwarenergy_progress
12/06/2023Interior lighting powerNaeem Anwarenergy_progress
12/06/2023Insulation placement and R valuesNaeem Anwarenergy_progress
12/06/2023Fire-Resistant Penetrations and JointsNaeem Anwarspecial
12/06/2023Energy Code Compliance InspectionsNaeem Anwarprogress
10/26/2023Sprinkler SystemsNaeem Anwarspecial
10/26/2023Fire-Resistant Penetrations and JointsNaeem Anwarspecial
07/13/2023HVAC-R and service water piping design and insulationREZA KHAMCYenergy_progress
07/13/2023FinalGiuseppe Anzaloneprogress
07/13/2023Fire-Resistant Penetrations and JointsREZA KHAMCYspecial
Latest 25 of 47.
▾Documents — 100 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch15
08/24/2026X00662923-P2Request digital key ↗
08/24/2026X00662923-P1Request digital key ↗
08/24/2026X00662923-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler Legalization1
08/25/2026X00473064-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/15/2026X00343901-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/25/2026X00471067-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWRestrictive Declaration/Easement 15
08/13/2026X01358504-I1Open ↗
08/13/2026X01358504-S1Open ↗
08/13/2026X00635014-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00635014-I1Open ↗
▸Seals & Professional Certifications47
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/26/2026X00343901-I1Open ↗
08/25/2026X00471067-I1Open ↗
08/25/2026X00473064-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026X00662923-P1Open ↗
09/01/2026X00662923-P1Open ↗
09/01/2026X00662923-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/02/2026X00662915-P2Open ↗
09/01/2026X00662923-P1Open ↗
09/01/2026X00473064-I1Open ↗
Showing 3 of 11 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist4
08/13/2026X00635014-P1Open ↗
08/13/2026X01358504-I1Open ↗
08/13/2026X00635014-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00635014-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00635014-I1Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
08/26/2026X00851685-I1Open ↗
08/25/2026X00471067-I1Open ↗
08/25/2026X00473064-I1Open ↗
Showing 3 of 16 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026X00796352-I1Open ↗
08/13/2026X00662923-I1Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification4
08/13/2026X01358504-I1Open ↗
08/13/2026X00635014-P2Open ↗
08/13/2026X00635014-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026X00635014-I1Open ↗