← Back
BuildNYC
One story - permanent living quarter
2930 COLDEN AVENUE
BRONX · BIN 2054974
💬 Discuss this project
1940Year Built
1Stories
A2Building Class
R5Zoning
1,490 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
One story - permanent living quarter · 5,000 sf lot · 0.3 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofPhotovoltaic solar panel installationUnder Construction3p · 1 filing · 5 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering108/04/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sunrun Installation Servicespecialty_contractor108/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272108/04/2026
Building Lifecycle
08/07/2026
Permit issued — Solar
X01440051-I1-SL
08/04/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01440051-I1
08/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/04/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
08/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
9 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSunrun Installation Service08/07/2026
1 project · most recent 11/11/2026
FiledStatusContractorScope
11/11/2026Permit IssuedSunrun Solar Electl—
1 project · most recent 08/04/2026
FiledStatusContractorScope
08/04/2026Permit IssuedSunrun Installation Service—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/04/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/04/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
08/03/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/03/2026Energy Code Compliance InspectionsWalid Abdullaprogress
08/03/2026FinalWalid Abdullaprogress
5 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account