← Back
Primarily 5-6 family with 1 store or office
294 ELIZABETH STREET
MANHATTAN · Greenwich Village · BIN 1008193
💬 Discuss this project
1878Year Built
4Stories
S5Building Class
C6-2Zoning
6,344 sfGross Floor Area
7Units
Rent Stabilized1 Open Violation ▸
Primarily 5-6 family with 1 store or office · Owner of record: 294 ELIZABETH LLC · 1,815 sf lot · 3.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Floor 215p · 3 filings · 20 docs
Floor 16p · 2 filings · 4 docs
Cellar9p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNITED KING CONSTRUCTION707/08/2026
294 ELIZABETH REALTOR403/21/2026
294 ELIZABETH LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/26/2023$3.5M—294 ELIZABETH ST, LLC → 294 ELIZABETH LLC$552/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGH QUALITY 338603/21/2026
4444 PPPP CORP403/21/2026
HIGHQUALITY CONSTRUCTION VNW203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UNITED KING CONSTRUCTIONGeneral Contractor807/08/2026
HIGH QUALITY CONSTRUCTIONGeneral Contractor203/21/2026
STA CONSTRUCTION INCGeneral Contractor107/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
MC CREADY & RICE PLBG INC.Plumbing107/08/2026
SIDERIS PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244602/03/2025
NEW AGE ENGINEERING PLLC7746406/05/2024
Building Lifecycle
All (82)Filed (11)Permit Issued (9)Signed Off (6)Violation (11)Inspection (12)Objection (12)Special Inspection (21)
04/29/2026
Violation issued (HPD, closed)
A
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/25/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/20/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/31/2025
Signed off — Alteration
INSTALL NEW GAS METER AND PIPING FOR COMMERCIAL TENANT HOT WATER HEATER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01026852-I1
03/06/2025
Signed off — Alteration
INTERIOR RENOVATION ON 2ND FLOOR OF AN EXISTING MIXED USE BUILDING WITH, RELOCATE BATHROOM AND KITCHEN PLUMBING FIXTURES AS PER PLAN. ADDRESS ECB VIOLATION #39105320N. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01003456-I1
03/05/2025
Signed off — Alteration
INTERIOR RENOVATION OF 2ND FLOOR AT AN EXISTING MIXED USE BUILDING, WITH PARTITIONING, FLOOR TILES AND CEILING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00958742-I1
03/03/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/03/2025
Filed — Alteration
INTERIOR RENOVATION ON 2ND FLOOR OF AN EXISTING MIXED USE BUILDING WITH, RELOCATE BATHROOM AND KITCHEN PLUMBING FIXTURES AS PER PLAN. ADDRESS ECB VIOLATION #39105320N. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01003456-P2
01/31/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/15/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/23/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/13/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/13/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/06/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
11/21/2024
Special inspection requirement — Interior lighting power
NARESH MAHANGU
11/21/2024
Special inspection requirement — Lighting in dwelling units
NARESH MAHANGU
11/21/2024
Special inspection requirement — Metering
NARESH MAHANGU
11/21/2024
Special inspection requirement — Fire-Resistance Rated Construction
NARESH MAHANGU
11/21/2024
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
11/15/2024
Objection resolved — Addressed
11/14/2024
Objection raised — Accessibility
11/04/2024
Filed — Alteration
INTERIOR RENOVATION ON 2ND FLOOR OF AN EXISTING MIXED USE BUILDING WITH, RELOCATE BATHROOM AND KITCHEN PLUMBING FIXTURES AS PER PLAN. ADDRESS ECB VIOLATION #39105320N. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01003456-P1
11/01/2024
Filed — Alteration CO
alteration to renovate the 2nd story of a mixed use building. the application is convert the 1 application on the 2nd floor into 2 apts
M01098471-P1
11/01/2024
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
11/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
11/01/2024
Special inspection requirement — Tenant Protection Plan Compliance
NARESH MAHANGU
10/30/2024
Permit issued — Plumbing
M01003456-I1-PL
10/30/2024
Permit issued — General Construction
M01098471-I1-GC
09/25/2024
Objection resolved — Addressed
09/25/2024
Objection resolved — Addressed
09/25/2024
Objection resolved — Addressed
09/05/2024
Objection resolved — Addressed
09/05/2024
Objection resolved — Addressed
08/30/2024
Objection raised — Scope
08/30/2024
Objection raised — Structural
08/30/2024
Objection raised — Scope
08/30/2024
Objection raised — Admin
08/30/2024
Objection raised — Fire_Protection
08/20/2024
Filed — Alteration CO
alteration to renovate the 2nd story of a mixed use building. the application is convert the 1 application on the 2nd floor into 2 apts
M01098471-I1
08/15/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/22/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/10/2024
Permit issued — Plumbing
M01026852-I1-PL
06/05/2024
Filed — Alteration
INSTALL NEW GAS METER AND PIPING FOR COMMERCIAL TENANT HOT WATER HEATER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01026852-I1
06/05/2024
Special inspection requirement — Maintenance information
Stephen Shishko
06/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
06/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
04/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
04/01/2024
Violation issued (HPD, closed)
A
03/27/2024
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
02/09/2024
Filed — Alteration
INTERIOR RENOVATION ON 2ND FLOOR OF AN EXISTING MIXED USE BUILDING WITH, RELOCATE BATHROOM AND KITCHEN PLUMBING FIXTURES AS PER PLAN. ADDRESS ECB VIOLATION #39105320N. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01003456-I1
02/06/2024
Violation issued (ECB, closed)
Construction
02/06/2024
Violation issued (ECB, closed)
Construction
02/06/2024
Violation issued (ECB, closed)
Construction
11/30/2023
Permit issued — General Construction
M00958742-I1-GC
11/17/2023
Filed — Alteration
INTERIOR RENOVATION OF 2ND FLOOR AT AN EXISTING MIXED USE BUILDING, WITH PARTITIONING, FLOOR TILES AND CEILING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00958742-I1
11/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
11/16/2023
Special inspection requirement — Final
Chun Feng
11/16/2023
Special inspection requirement — Fire-Resistance Rated Construction
NARESH MAHANGU
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.10/30/2024
DOB NOWGeneral ConstructionPermit IssuedSTA CONSTRUCTION INC10/30/2024
DOB NOWPlumbingSigned-offMC CREADY & RICE PLBG INC07/10/2024
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY CONSTRUCTION11/30/2023
DOB NOWPlumbingSigned-offSIDERIS PLBG & HTG CORP02/24/2023
DOB NOWSupported ScaffoldSigned-offUNITED KING CONSTRUCTION04/26/2022
DOB NOWSidewalk ShedSigned-offUNITED KING CONSTRUCTION04/26/2022
DOB NOWSupported ScaffoldSigned-offUNITED KING CONSTRUCTION04/01/2022
DOB NOWSidewalk ShedSigned-offUNITED KING CONSTRUCTION03/31/2022
BISMHISSUEDGOOD-WILL MECHANICAL CORP.12/05/2003
BISMHISSUED9 J BUILDING INC09/10/2003
BISPLISSUEDKIN CHI PLBG AND HTG CORP09/02/2003
BISOTISSUED9 J BUILDING INC08/14/2003
BIS—ISSUEDLOTUS MECHINCAL11/01/1996
2 projects · most recent 09/09/2025
General Wiring
FiledStatusContractorScope
09/09/2025Permit IssuedALL AROUND ELECTRIC CORP.General Wiring
03/30/2022Permit IssuedRICHARD NEU—
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
08/25/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/20/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/31/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/15/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/13/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/06/2024Fail-Final CND-Occupancy InspectionFailView ↗
08/15/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/22/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
11/21/2024Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
11/21/2024Interior lighting powerNARESH MAHANGUenergy_progress
11/21/2024Lighting in dwelling unitsNARESH MAHANGUenergy_progress
11/21/2024MeteringNARESH MAHANGUenergy_progress
11/21/2024Fire-Resistance Rated ConstructionNARESH MAHANGUprogress
11/21/2024Energy Code Compliance InspectionsNARESH MAHANGUprogress
11/01/2024Energy Code Compliance InspectionsNARESH MAHANGUprogress
11/01/2024Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
11/01/2024Tenant Protection Plan ComplianceNARESH MAHANGUspecial
06/05/2024Maintenance informationStephen Shishkoenergy_progress
06/05/2024HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
06/05/2024HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
04/22/2024Fire-Resistant Penetrations and JointsStephen Shishkospecial
03/27/2024Tenant Protection Plan ComplianceStephen Shishkospecial
11/16/2023Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
11/16/2023FinalChun Fengprogress
11/16/2023Fire-Resistance Rated ConstructionNARESH MAHANGUprogress
11/16/2023Energy Code Compliance InspectionsNARESH MAHANGUprogress
11/16/2023Tenant Protection Plan ComplianceNARESH MAHANGUspecial
08/30/2023Fire-Resistant Penetrations and JointsStephen Shishkospecial
08/30/2023Tenant Protection Plan Compliance—special
▾Documents — 58 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/02/2026M00708581-I1Request digital key ↗
09/02/2026M00710161-I1Request digital key ↗
08/31/2026M00821318-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits6
▸DOB NOWLPC Approval/Permit6
08/25/2026M01003456-P1Open ↗
08/25/2026M01003456-I1Open ↗
08/13/2026M01003456-P2Open ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026M01098471-P1Open ↗
08/13/2026M01098471-I1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/02/2026M00708581-I1Open ↗
09/02/2026M00710161-I1Open ↗
08/31/2026M00821318-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/22/2026M01026852-I1Open ↗
09/22/2026M01026852-I1Open ↗
09/22/2026M01026852-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/22/2026M01026852-I1Open ↗
09/22/2026M01026852-I1Open ↗
08/25/2026M00821318-P1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026M01098471-I1Open ↗
08/13/2026M01098471-P1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/31/2026M00821318-I1Open ↗
08/31/2026M00821318-P1Open ↗
08/27/2026M01026852-I1Open ↗
Showing 3 of 9 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M01026852-I1Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/25/2026M01098471-I1Open ↗
08/15/2026M01098471-P1Open ↗