← Back
BuildNYC
Two stories - detached, small or mid-size
294 LYNDALE AVENUE
STATEN ISLAND · BIN 5069229
💬 Discuss this project
1955Year Built
2Stories
A1Building Class
R1-2Zoning
3,152 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,850 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPhotovoltaic solar panel installation1p · 1 filing · 8 docs
Floor 25p · 1 filing · 16 docs
Floor 15p · 1 filing · 16 docs
Site & exterior1p · 1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering110/17/2025
Think Design Architecture304/12/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sunrun103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Maximum ContractingScaffold303/21/2026
Sunrun Installation ServiceGeneral Contractor104/09/2026
Premier PL, Heating & MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272110/17/2025
Think Design Architectura683204/12/2022
Building Lifecycle
01/15/2026
Signed off — Alteration
S01304608-I1
10/28/2025
Permit issued — Solar
S01304608-I1-SL
10/17/2025
Filed — Alteration
S01304608-I1
10/17/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
10/17/2025
Special inspection requirement — Final
Walid Abdulla
37 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunrun Installation Service10/28/2025
DOB NOWPlumbingSigned-offPremier PL, Heating & Mechanical08/20/2021
DOB NOWConstruction FenceSigned-offMaximum Contracting08/12/2021
BIS—ISSUEDMaximum Contracting07/30/2021
3 projects · most recent 10/17/2025
General Wiring
FiledStatusContractorScope
10/17/2025CompleteSunrun Solar Electl—
01/06/2022CompleteTop Shelf ElectricGeneral Wiring
08/24/2021CompleteAll Pro Electric Controls—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/24/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/23/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/04/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/04/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/02/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
10/17/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
10/17/2025FinalWalid Abdullaprogress
10/17/2025Energy Code Compliance InspectionsWalid Abdullaprogress
10/17/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/17/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
04/12/2022Electrical energy consumptionFrank Martarella IIIenergy_progress
04/12/2022Maintenance informationFrank Martarella IIIenergy_progress
04/12/2022HVAC insulation and sealing Frank Martarella IIIenergy_progress
04/12/2022Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
04/12/2022Fire-Resistance Rated ConstructionFrank Martarella IIIprogress
04/12/2022Energy Code Compliance InspectionsFrank Martarella IIIprogress
04/12/2022HVAC and service water heating system controls Frank Martarella IIIenergy_progress
04/12/2022HVAC and service water heating equipment Frank Martarella IIIenergy_progress
03/24/2022Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
03/24/2022HVAC and service water heating system controls Frank Martarella IIIenergy_progress
03/24/2022Maintenance informationFrank Martarella IIIenergy_progress
03/24/2022Electrical energy consumptionFrank Martarella IIIenergy_progress
03/24/2022HVAC insulation and sealing Frank Martarella IIIenergy_progress
03/24/2022HVAC and service water heating equipment Frank Martarella IIIenergy_progress
03/24/2022Fire-Resistance Rated ConstructionFrank Martarella IIIprogress
03/24/2022Energy Code Compliance InspectionsFrank Martarella IIIprogress
04/30/2020FinalFrank Martarella IIIprogress
110 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account