Two family converted from one family
295 DECATUR STREET
BROOKLYN · BIN 3047099
💬 Discuss this project
1890Year Built
3Stories
B3Building Class
R6BZoning
2,560 sfGross Floor Area
2Units
Two family converted from one family · 1,867 sf lot · 1.37 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 32p · 1 filing · 10 docs
Floor 23p · 1 filing · 20 docs
Floor 1
Basement6p · 2 filings · 20 docs
Nothing on file for this building.
Building Lifecycle
All (70)Filed (12)Permit Issued (4)Signed Off (4)Inspection (6)Objection (14)Special Inspection (30)
05/24/2023
Signed off — Alteration
Replace one gas meter in basement and replace gas piping thru the building and replace existing hot water heater with new one as shown on submitted plans. Test new gas piping. No change in use or egress.
B00610064-I1
05/24/2023
Signed off — Alteration
Replace one gas meter in basement and replace gas piping thru the building and replace existing hot water heater with new one as shown on submitted plans. Test new gas piping. No change in use or egress.
B00610064-S1
04/27/2023
Signed off — Alteration
Various new plumbing fixtures & relocations.
B00474311-I1
04/26/2023
Signed off — Alteration
B00474275-I1
02/27/2023
Filed — Alteration
Replace one gas meter in basement and replace gas piping thru the building and replace existing hot water heater with new one as shown on submitted plans. Test new gas piping. No change in use or egress.
B00610064-P5
02/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMER ABOU-GHAIDA
02/15/2023
Special inspection requirement — Energy Code Compliance Inspections
SAMER ABOU-GHAIDA
02/15/2023
Special inspection requirement — HVAC-R and service water heating system controls
SAMER ABOU-GHAIDA
02/15/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMER ABOU-GHAIDA
02/15/2023
Special inspection requirement — HVAC-R and service water heating equipment
SAMER ABOU-GHAIDA
01/05/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/04/2022
Filed — Alteration
Various new plumbing fixtures & relocations.
B00474311-P2
11/10/2022
Objection resolved — Addressed
11/09/2022
Objection raised — Mechanical
11/09/2022
Objection resolved — Addressed
11/09/2022
Objection raised — Other
11/09/2022
Objection raised — Other
11/09/2022
Objection resolved — Addressed
11/01/2022
Filed — Alteration
Replace one gas meter in basement and replace gas piping thru the building and replace existing hot water heater with new one as shown on submitted plans. Test new gas piping. No change in use or egress.
B00610064-P4
10/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMER ABOU-GHAIDA
10/28/2022
Special inspection requirement — Energy Code Compliance Inspections
SAMER ABOU-GHAIDA
10/28/2022
Special inspection requirement — HVAC-R and service water heating equipment
SAMER ABOU-GHAIDA
10/28/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMER ABOU-GHAIDA
10/28/2022
Special inspection requirement — HVAC-R and service water heating system controls
SAMER ABOU-GHAIDA
09/06/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/13/2022
Objection resolved — Addressed
05/26/2022
Objection resolved — Addressed
05/25/2022
Objection raised — Scope
05/25/2022
Objection raised — Admin
05/20/2022
Filed — Alteration
Replace one gas meter in basement and replace gas piping thru the building and replace existing hot water heater with new one as shown on submitted plans. Test new gas piping. No change in use or egress.
B00610064-P3
05/12/2022
Special inspection requirement — Energy Code Compliance Inspections
SAMER ABOU-GHAIDA
05/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMER ABOU-GHAIDA
05/12/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMER ABOU-GHAIDA
05/12/2022
Special inspection requirement — HVAC-R and service water heating equipment
SAMER ABOU-GHAIDA
05/12/2022
Special inspection requirement — HVAC-R and service water heating system controls
SAMER ABOU-GHAIDA
05/07/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/21/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/20/2022
Permit issued — Mechanical Systems
B00610064-S1-MS
02/24/2022
Permit issued — Plumbing
B00610064-I1-PL
02/07/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/24/2022
Filed — Alteration
Replace one gas meter in basement and replace gas piping thru the building and replace existing hot water heater with new one as shown on submitted plans. Test new gas piping. No change in use or egress.
B00610064-P2
01/21/2022
Filed — Alteration
Various new plumbing fixtures & relocations.
B00474311-P1
01/11/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/06/2022
Special inspection requirement — Maintenance information
SAMER ABOU-GHAIDA
01/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMER ABOU-GHAIDA
01/06/2022
Special inspection requirement — Fire-Resistance Rated Construction
SAMER ABOU-GHAIDA
01/06/2022
Special inspection requirement — Energy Code Compliance Inspections
SAMER ABOU-GHAIDA
01/06/2022
Special inspection requirement — Final
SAMER ABOU-GHAIDA
01/01/2022
Objection resolved — Addressed
12/30/2021
Objection raised — Scope
12/28/2021
Filed — Alteration
Replace one gas meter in basement and replace gas piping thru the building and replace existing hot water heater with new one as shown on submitted plans. Test new gas piping. No change in use or egress.
B00610064-S1
12/28/2021
Filed — Alteration
Replace one gas meter in basement and replace gas piping thru the building and replace existing hot water heater with new one as shown on submitted plans. Test new gas piping. No change in use or egress.
B00610064-P1
12/20/2021
Filed — Alteration
B00474275-P1
12/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMER ABOU-GHAIDA
12/15/2021
Special inspection requirement — Mechanical Systems
SAMER ABOU-GHAIDA
12/15/2021
Special inspection requirement — Final
SAMER ABOU-GHAIDA
12/15/2021
Special inspection requirement — Maintenance information
SAMER ABOU-GHAIDA
12/15/2021
Special inspection requirement — HVAC-R and service water heating equipment
SAMER ABOU-GHAIDA
12/15/2021
Special inspection requirement — HVAC-R and service water heating system controls
SAMER ABOU-GHAIDA
12/14/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMER ABOU-GHAIDA
Latest 60 of 70 events.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
REAL CREATIVE MOTION ENGINEERING SE702/27/2023
PROFESSIONAL SOLUTIONS GROUP512/04/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN LIGHT EXPEDITING LLC2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DNA PLUMBING CONTR. INCPlumbing507/08/2026
DNA PLUMBING CONTRACTORSGeneral Contractor203/21/2026
KODRA CONSTRUCTION CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PROFESSIONAL SOLUTIONS GR1756802/27/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offDNA PLUMBING CONTRACTORS04/20/2022
DOB NOWPlumbingSigned-offDNA PLUMBING CONTR. INC02/24/2022
DOB NOWPlumbingSigned-offDNA PLUMBING CONTR. INC12/10/2021
DOB NOWGeneral ConstructionSigned-offKODRA CONSTRUCTION CORP10/19/2021
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/05/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/06/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/07/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/21/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/07/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
02/15/2023Fire-Resistant Penetrations and JointsSAMER ABOU-GHAIDAspecial
02/15/2023Energy Code Compliance InspectionsSAMER ABOU-GHAIDAprogress
02/15/2023HVAC-R and service water heating system controlsSAMER ABOU-GHAIDAenergy_progress
02/15/2023HVAC-R and service water piping design and insulationSAMER ABOU-GHAIDAenergy_progress
02/15/2023HVAC-R and service water heating equipmentSAMER ABOU-GHAIDAenergy_progress
10/28/2022Fire-Resistant Penetrations and JointsSAMER ABOU-GHAIDAspecial
10/28/2022Energy Code Compliance InspectionsSAMER ABOU-GHAIDAprogress
10/28/2022HVAC-R and service water heating equipmentSAMER ABOU-GHAIDAenergy_progress
10/28/2022HVAC-R and service water piping design and insulationSAMER ABOU-GHAIDAenergy_progress
10/28/2022HVAC-R and service water heating system controlsSAMER ABOU-GHAIDAenergy_progress
05/12/2022Energy Code Compliance InspectionsSAMER ABOU-GHAIDAprogress
05/12/2022Fire-Resistant Penetrations and JointsSAMER ABOU-GHAIDAspecial
05/12/2022HVAC-R and service water piping design and insulationSAMER ABOU-GHAIDAenergy_progress
05/12/2022HVAC-R and service water heating equipmentSAMER ABOU-GHAIDAenergy_progress
05/12/2022HVAC-R and service water heating system controlsSAMER ABOU-GHAIDAenergy_progress
01/06/2022Maintenance informationSAMER ABOU-GHAIDAenergy_progress
01/06/2022Fire-Resistant Penetrations and JointsSAMER ABOU-GHAIDAspecial
01/06/2022Fire-Resistance Rated ConstructionSAMER ABOU-GHAIDAprogress
01/06/2022Energy Code Compliance InspectionsSAMER ABOU-GHAIDAprogress
01/06/2022FinalSAMER ABOU-GHAIDAprogress
12/15/2021Fire-Resistant Penetrations and JointsSAMER ABOU-GHAIDAspecial
12/15/2021Mechanical SystemsSAMER ABOU-GHAIDAspecial
12/15/2021FinalSAMER ABOU-GHAIDAprogress
12/15/2021Maintenance informationSAMER ABOU-GHAIDAenergy_progress
12/15/2021HVAC-R and service water heating equipmentSAMER ABOU-GHAIDAenergy_progress
Latest 25 of 31.
▾Documents — 78 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch7
08/31/2026B00610064-I1Request digital key ↗
08/31/2026B00610064-S1Request digital key ↗
08/31/2026B00610064-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/01/2026B00474311-I1Request digital key ↗
09/01/2026B00474311-P1Request digital key ↗
09/01/2026B00474311-P2Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
09/01/2026B00474275-I1Request digital key ↗
09/01/2026B00474275-P1Request digital key ↗
▸Applications & Permits12
▸DOB NOWLPC Approval/Permit12
09/01/2026B00474275-I1Open ↗
09/01/2026B00474311-P2Open ↗
09/01/2026B00474311-I1Open ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications43
▸DOB NOWProgress Inspector Seal & Signature24
09/01/2026B00610064-P3Open ↗
09/01/2026B00610064-P3Open ↗
09/01/2026B00610064-P3Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/01/2026B00474275-P1Open ↗
09/01/2026B00474275-I1Open ↗
09/01/2026B00474311-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026B00610064-P3Open ↗
08/28/2026B00474275-I1Open ↗
08/27/2026B00610064-P5Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/31/2026B00610064-I1Open ↗
08/31/2026B00610064-S1Open ↗
08/31/2026B00610064-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/01/2026B00474311-I1Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
09/01/2026B00474275-I1Open ↗
08/13/2026B00610064-I1Open ↗
08/13/2026B00610064-S1Open ↗