← Back
Two stories - detached, small or mid-size
295 HAROLD AVENUE
STATEN ISLAND · BIN 5069885
💬 Discuss this project
1980Year Built
1Stories
A1Building Class
R1-2Zoning
3,348 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 6,700 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREEN RIVER ENVIRONMENTAL ENGINEERI108/07/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYSS LLCGeneral Contractor108/26/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREEN RIVER ENVIRONMENTAL7841108/07/2026
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
08/12/2026
Permit issued — Solar
S01442301-I1-SL
08/07/2026
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
S01442301-I1
08/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT MASONE
08/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT MASONE
08/06/2026
Special inspection requirement — Energy Code Compliance Inspections
ROBERT MASONE
08/06/2026
Special inspection requirement — Final
ROBERT MASONE
08/06/2026
Special inspection requirement — Air barrier - visual inspection
ROBERT MASONE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYSS LLC08/12/2026
1 project · most recent 08/07/2026
FiledStatusContractorScope
08/07/2026CompleteNY SOLAR ELECTRICAL LLC—
1 project · most recent 08/07/2026
FiledStatusContractorScope
08/07/2026Signed-offNYSS LLC66 panels, 29.04 kw, 1,509 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/06/2026Fire-Resistant Penetrations and JointsROBERT MASONEspecial
08/06/2026Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
08/06/2026Energy Code Compliance InspectionsROBERT MASONEprogress
08/06/2026FinalROBERT MASONEprogress
08/06/2026Air barrier - visual inspectionROBERT MASONEenergy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026S01442301-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
09/05/2026S01442301-I1Open ↗
09/05/2026S01442301-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026S01442301-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/05/2026S01442301-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026S01442301-I1Open ↗