HPD04/29/2026(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
HPD06/19/2020§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT WEST WALL IN THE 1st BATHROOM FROM EAST LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
HPD06/19/2020§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st BATHROOM FROM EAST LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
HPD06/19/2020§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st BATHROOM FROM EAST LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
HPD06/19/2020§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOWER SASH WINDOW FRAME AT WEST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
HPD06/19/2020§ 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
HPD06/19/2020§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
HPD01/29/2020HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3S, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD01/29/2020HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4S, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
HPD01/29/2020HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES AT PUBLIC HALL, 4th STORY
HPD01/29/2020§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT EAST AND WEST WALLS AT PUBLIC HALL, 4th STORY
HPD01/29/2020§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE METAL DOOR FRAME AT PUBLIC HALL, 4th STORY
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DOB03/16/1999V-DOB VIOLATION - ACTIVE
DOB05/04/1998V-DOB VIOLATION - ACTIVE
DOB09/16/1997V-DOB VIOLATION - ACTIVE
DOB08/29/1995V-DOB VIOLATION - ACTIVE
ECB08/12/2002PLUMBING WORK WITHOUT A PERMIT STOP ALL PLUMBING WORK PLUMBING WORK 95% COMPLETE AND IN STUBOAT CONDITION DEMOLITION INSTALLATION AND OR RENOVATION OF ALL REALATED ROUGHING WHICH INCLUDES WASTE, VENTING HOT ANDNothing owed — awaiting certificate of correction