← Back
BuildNYC
Two family frame
295 RENSSELAER AVENUE
STATEN ISLAND · BIN 5176932
💬 Discuss this project
2025Year Built
2Stories
B2Building Class
R3XZoning
2,700 sfGross Floor Area
2Units
Two family frame · Owner of record: Sheldon SI · 4,000 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 20 docs
Floor 25p · 3 filings · 20 docs
Floor 111p · 3 filings · 20 docs
Basement3p · 2 filings · 20 docs
Sub-Basement1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
James V Morri410/29/2025
A Tech Engineering NYC104/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
James V Morri, RA303/21/2026
A Tech Engineering NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Madonia DevelopmentGeneral Contractor504/09/2026
DonatoPlumbing207/08/2026
R&M Piping & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738210/08/2025
Building Lifecycle
01/26/2026
Permit expired, never signed off — Foundation
The city's record still shows this permit as issued, with no sign-off on its filing
S01164040-I1-GC
11/10/2025
Signed off — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S01164040-S2
11/07/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/05/2025
Signed off — Alteration
INSTALLATION OF FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME
S01194162-I1
11/04/2025
Signed off — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S01164040-S1
60 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMadonia Development10/30/2025
DOB NOWPlumbingSigned-offDonato09/04/2025
DOB NOWPlumbingSigned-offR&M Piping & Heating07/02/2025
DOB NOWPlumbingSigned-offDonato03/21/2025
DOB NOWEarth WorkSigned-offMadonia Development02/20/2025
DOB NOWStructuralSigned-offMadonia Development02/20/2025
DOB NOWFoundationPermit IssuedMadonia Development02/20/2025
DOB NOWStructuralSigned-offMadonia Development02/20/2025
1 project · most recent 10/29/2025
Storm Water/Sanitary
FiledStatusContractorScope
10/29/2025Signed-offDonatoStorm, Water/Sanitary
1 project · most recent 07/08/2025
General Wiring
FiledStatusContractorScope
07/08/2025CompleteCatello ElectricalGeneral Wiring
1 project · most recent 10/29/2025
Steel Concrete Wood
FiledStatusContractorScope
10/29/2025Signed-offMadonia DevelopmentSteel, Concrete, Wood
1 project · most recent 10/29/2025
Earthwork
FiledStatusContractorScope
10/29/2025Signed-offMadonia DevelopmentEarthwork
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
11/07/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
10/02/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/19/2025Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
09/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/17/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
09/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/28/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/26/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/16/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
10/14/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
10/14/2025Structural Steel - Detailsanthony santorospecial
10/14/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
10/14/2025Subgrade Inspectionsanthony santorospecial
10/14/2025Concrete - Cast-In-Placeanthony santorospecial
10/14/2025Energy Code Compliance Inspectionsanthony santoroprogress
10/14/2025Finalanthony santoroprogress
10/14/2025Structural Wood Frameanthony santoroprogress
10/14/2025Fire-Resistance Rated Constructionanthony santoroprogress
10/14/2025Footing and Foundationanthony santoroprogress
10/14/2025Fenestration areasanthony santoroenergy_progress
10/14/2025Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
10/14/2025Air barrier — testing anthony santoroenergy_progress
10/14/2025Insulation placement and R valuesanthony santoroenergy_progress
10/14/2025Fenestration air leakageanthony santoroenergy_progress
10/14/2025Air barrier - visual inspectionanthony santoroenergy_progress
10/14/2025HVAC-R and service water piping design and insulationanthony santoroenergy_progress
10/14/2025HVAC-R and service water heating system controlsanthony santoroenergy_progress
10/14/2025Lighting controlsanthony santoroenergy_progress
10/14/2025Lighting in dwelling unitsanthony santoroenergy_progress
10/14/2025Permanent certificateanthony santoroenergy_progress
10/14/2025HVAC-R and service water heating equipmentanthony santoroenergy_progress
10/14/2025Meteringanthony santoroenergy_progress
10/14/2025Maintenance informationanthony santoroenergy_progress
10/06/2025Concrete - Cast-In-Placeanthony santorospecial
Latest 25 of 48.
36 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account