Two family frame
295 RENSSELAER AVENUE
STATEN ISLAND · BIN 5176932
💬 Discuss this project
2025Year Built
2Stories
B2Building Class
R3XZoning
2,700 sfGross Floor Area
2Units
Two family frame · Owner of record: Sheldon SI · 4,000 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 20 docs
Floor 26p · 3 filings · 20 docs
Floor 111p · 3 filings · 20 docs
Basement4p · 2 filings · 20 docs
Sub-Basement1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
James V Morri410/29/2025
A Tech Engineering NYC104/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
James V Morri, RA303/21/2026
A Tech Engineering NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Madonia DevelopmentGeneral Contractor504/09/2026
DonatoPlumbing207/08/2026
R&M Piping & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738210/08/2025
Building Lifecycle
All (59)Filed (5)Permit Issued (8)Signed Off (3)Inspection (11)Objection (2)Special Inspection (30)
11/10/2025
Signed off — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S01164040-S2
11/07/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/05/2025
Signed off — Alteration
INSTALLATION OF FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME
S01194162-I1
11/04/2025
Signed off — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S01164040-S1
10/30/2025
Permit issued — Curb Cut
S01164040-S2-CC
10/29/2025
Filed — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S01164040-S2
10/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
10/14/2025
Special inspection requirement — Structural Steel - Details
anthony santoro
10/14/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
10/14/2025
Special inspection requirement — Subgrade Inspections
anthony santoro
10/14/2025
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
10/14/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
10/14/2025
Special inspection requirement — Final
anthony santoro
10/14/2025
Special inspection requirement — Structural Wood Frame
anthony santoro
10/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
10/14/2025
Special inspection requirement — Footing and Foundation
anthony santoro
10/14/2025
Special inspection requirement — Fenestration areas
anthony santoro
10/14/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
10/14/2025
Special inspection requirement — Air barrier — testing
anthony santoro
10/14/2025
Special inspection requirement — Insulation placement and R values
anthony santoro
10/14/2025
Special inspection requirement — Fenestration air leakage
anthony santoro
10/14/2025
Special inspection requirement — Air barrier - visual inspection
anthony santoro
10/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
10/14/2025
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
10/14/2025
Special inspection requirement — Lighting controls
anthony santoro
10/14/2025
Special inspection requirement — Lighting in dwelling units
anthony santoro
10/14/2025
Special inspection requirement — Permanent certificate
anthony santoro
10/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
10/14/2025
Special inspection requirement — Metering
anthony santoro
10/14/2025
Special inspection requirement — Maintenance information
anthony santoro
10/08/2025
Filed — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S01164040-P1
10/06/2025
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
10/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
10/06/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
10/06/2025
Special inspection requirement — Structural Steel - Details
anthony santoro
10/06/2025
Special inspection requirement — Subgrade Inspections
anthony santoro
10/06/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
10/02/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/30/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/19/2025
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
09/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/17/2025
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
09/04/2025
Permit issued — Plumbing
S01194162-I1-PL
09/03/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/28/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/26/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/02/2025
Permit issued — Plumbing
S23818930-S1-PL
06/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/08/2025
Filed — Alteration
INSTALLATION OF FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME
S01194162-I1
03/21/2025
Permit issued — Plumbing
S01164040-S1-PL
02/20/2025
Permit issued — Structural
S01164040-I1-GC
02/20/2025
Permit issued — General Construction
S01164040-I1-ST
02/20/2025
Permit issued — General Construction
S01164040-I1-FO
02/20/2025
Permit issued — Foundation
S01164040-I1-EA
02/19/2025
Filed — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S01164040-S1
01/30/2025
Objection resolved — Addressed
01/21/2025
Objection raised — Scope
01/15/2025
Filed — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S01164040-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMadonia Development10/30/2025
DOB NOWPlumbingSigned-offDonato09/04/2025
DOB NOWPlumbingSigned-offR&M Piping & Heating07/02/2025
DOB NOWPlumbingSigned-offDonato03/21/2025
DOB NOWStructuralPermit IssuedMadonia Development02/20/2025
DOB NOWGeneral ConstructionSigned-offMadonia Development02/20/2025
DOB NOWGeneral ConstructionSigned-offMadonia Development02/20/2025
DOB NOWFoundationSigned-offMadonia Development02/20/2025
1 project · most recent 10/29/2025
Storm Water/Sanitary
FiledStatusContractorScope
10/29/2025Signed-offDonatoStorm, Water/Sanitary
1 project · most recent 07/08/2025
General Wiring
FiledStatusContractorScope
07/08/2025CompleteCatello Electrical ContGeneral Wiring
1 project · most recent 10/29/2025
Steel Concrete Wood
FiledStatusContractorScope
10/29/2025Signed-offMadonia DevelopmentSteel, Concrete, Wood
1 project · most recent 10/29/2025
Earthwork
FiledStatusContractorScope
10/29/2025Signed-offMadonia DevelopmentEarthwork
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
11/07/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
10/02/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/19/2025Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
09/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/17/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
09/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/28/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/26/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/16/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
10/14/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
10/14/2025Structural Steel - Detailsanthony santorospecial
10/14/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
10/14/2025Subgrade Inspectionsanthony santorospecial
10/14/2025Concrete - Cast-In-Placeanthony santorospecial
10/14/2025Energy Code Compliance Inspectionsanthony santoroprogress
10/14/2025Finalanthony santoroprogress
10/14/2025Structural Wood Frameanthony santoroprogress
10/14/2025Fire-Resistance Rated Constructionanthony santoroprogress
10/14/2025Footing and Foundationanthony santoroprogress
10/14/2025Fenestration areasanthony santoroenergy_progress
10/14/2025Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
10/14/2025Air barrier — testing anthony santoroenergy_progress
10/14/2025Insulation placement and R valuesanthony santoroenergy_progress
10/14/2025Fenestration air leakageanthony santoroenergy_progress
10/14/2025Air barrier - visual inspectionanthony santoroenergy_progress
10/14/2025HVAC-R and service water piping design and insulationanthony santoroenergy_progress
10/14/2025HVAC-R and service water heating system controlsanthony santoroenergy_progress
10/14/2025Lighting controlsanthony santoroenergy_progress
10/14/2025Lighting in dwelling unitsanthony santoroenergy_progress
10/14/2025Permanent certificateanthony santoroenergy_progress
10/14/2025HVAC-R and service water heating equipmentanthony santoroenergy_progress
10/14/2025Meteringanthony santoroenergy_progress
10/14/2025Maintenance informationanthony santoroenergy_progress
10/06/2025Concrete - Cast-In-Placeanthony santorospecial
Latest 25 of 48.
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026S01164040-S2Request digital key ↗
08/20/2026S01164040-P1Request digital key ↗
08/20/2026S01164040-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/20/2026S01164040-I1Open ↗
08/13/2026S01164040-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/20/2026S01164040-I1Open ↗
08/13/2026S01164040-P1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/20/2026S01164040-I1Open ↗
08/13/2026S01164040-P1Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/20/2026S01164040-I1Open ↗
08/13/2026S01164040-S1Open ↗
08/13/2026S01164040-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026S01164040-P1Open ↗
09/01/2026S01164040-P1Open ↗
08/31/2026S01164040-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026S01164040-P1Open ↗
08/31/2026S01164040-I1Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/20/2026S01164040-I1Open ↗
08/13/2026S01164040-P1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/20/2026S01164040-I1Open ↗
08/13/2026S01164040-P1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S01164040-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S01164040-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S01164040-I1Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/20/2026S01164040-I1Open ↗
08/13/2026S01164040-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/20/2026S01164040-I1Open ↗
08/13/2026S01164040-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/20/2026S01164040-I1Open ↗
08/13/2026S01164040-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S01164040-I1Open ↗