ECB06/05/2026Reissue#35721176L failure to maintain building in code-compliant manner.noted:there were several broken windows at t.o.i.outside classroom 309 and 333.rem:repair/replace.Nothing owed — awaiting certificate of correction
ECB06/05/2026Reissue#35721175J failure to maintain building in code-compliant manner.noted:a leak in the roof is causing water damage to ceilings and walls at corridors and rooms by stairwell b and d.rem:repair/replace fixNothing owed — awaiting certificate of correction
ECB06/05/2026Reissue#35720999H failure to maintain building in code-compliant manner.noted: the railing parapet at roof level on the 27TH street side EXP3 is in disrepair dangerous to anyone on the roof.rem:repair/replace.xNothing owed — awaiting certificate of correction
ECB06/05/2026Reissue#35721177N failure to maintain building in code-compliant manner.noted:at 2ND floor,auditorium entrance door not closing properly.remrepair/replace.Nothing owed — awaiting certificate of correction
ECB06/05/2026Reissue#35721179R failure to maintain building in code compliant manner.noted:in boiler room at basement level,the columns,ceilings and walls are cracked,chipped,and flaking off.rem:repair/replace.Nothing owed — awaiting certificate of correction
ECB06/05/2026Reissue#35720998X noted:the bulkhead at stair b allows water penetration when raining.rem:repair/replace-fix the leak.Nothing owed — awaiting certificate of correction
ECB06/05/2026Failure to maintain building in code-compliant manner.noted:the concrete pavement at the front courtyard,exposure 1,at the base of the flagpole is severly cracked causing a dangerous trip hazard.rem:repair/replNothing owed — awaiting certificate of correction
ECB06/05/2026Failure to maintain building in code-compliant manner.noted:there wereclassrooms,corridors and offices that have hanging combustible material as decorations and display.rem:remove all hanging materials.Nothing owed — awaiting certificate of correction
ECB06/05/2026Failure to maintain building in code-compliant manner.noted:the entry stairs at exposure 1 and 3 are in need of repair.concrete chipped,falling out and the steel nosing treads are loose causing trip hazards.remNothing owed — awaiting certificate of correction
ECB08/19/2025Failure to maintain building in code-compliant manner. Noted at outside classrooms 309 and 333 14 broken windows. Remedy: repair and/or replace.Nothing owed — awaiting certificate of correction
ECB08/19/2025Failure to maintain building in code-compliant manner. Noted at bulkhead stair b water penetration in stairwell. Remedy: repair and/or replace.Nothing owed — awaiting certificate of correction
ECB08/19/2025Failure to maintain building in code-compliant manner. Noted at roof fencing on 27 street side disconnected and angled in disrepair. Remedy:repair and/or replace.Nothing owed — awaiting certificate of correction
ECB08/19/2025Failure to maintain building in code-compliant manner. Noted at 4 floor and stairwell b and d hallways, classrooms roof leaking water penetration; spalling. Remedy: repair and/or replace.Nothing owed — awaiting certificate of correction
ECB08/19/2025Failure to maintain building in code-compliant manner. Noted at gas, electrical and boiler room. Ceilings, walls and columns running cracks.remedy: repair and/or replace.Nothing owed — awaiting certificate of correction
ECB08/19/2025Failure to maintain building in code-compliant manner. Noted at 2 floor corridor by 239, 221, auditorium entrance, stage front left, 1 fl. 127, 129, kitchen 163 and cafeteria by EXIT6 doors are not closing propNothing owed — awaiting certificate of correction