2951 WALLACE AVENUE
BRONX · BIN 2131355
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
Architecture
Roof1 filing · 20 docs
Floor 61 filing · 20 docs
Floor 51 filing · 20 docs
Floor 41 filing · 20 docs
Floor 31 filing · 20 docs
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1 filing · 20 docs
1 job · most recent 11/11/2025
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
11/11/2025Signed-offZEFI & CO. LLCAir Conditioning Systems, Heating Systems
Cooling
Trane 4WCC4060E1000AA 58,000 BTU · Rooftop Unit ×2
Heating
Trane 4WCC4060E1000AA 54,000 BTU · Rooftop Unit ×2
1 job · most recent 11/11/2025
Sprinkler System
FiledStatusContractorScope
11/11/2025Signed-offGO PRO FIRE PROTECTION CSprinkler System
1 job · most recent 11/11/2025
Storm Water/Sanitary
FiledStatusContractorScope
11/11/2025Signed-offINFINITI ESC PLUMBING CORStorm, Water/Sanitary
1 job · most recent 11/11/2025
Concrete Masonry
FiledStatusContractorScope
11/11/2025Signed-offZEFI & CO. LLCConcrete, Masonry
1 job · most recent 11/11/2025
Fence
FiledStatusContractorScope
11/11/2025Signed-offZEFI & CO. LLCFence
1 job · most recent 11/11/2025
Earthwork
FiledStatusContractorScope
11/11/2025Signed-offZEFI & CO. LLCEarthwork
Building Lifecycle
All (154)Filed (17)Permit Issued (11)Signed Off (9)Inspection (7)Objection (80)Special Inspection (30)
03/17/2026
Signed off — New Building
FILING SPRINKLER WORK TYPE IN CONJUNCTION WITH NB APPLICATION X00876463.
X00876463-I1
01/27/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/26/2025
Special inspection requirement — Exterior lighting power
RUWAN RAJAPAKSE
11/26/2025
Special inspection requirement — Electrical motors and elevators
RUWAN RAJAPAKSE
11/26/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
RUWAN RAJAPAKSE
11/26/2025
Special inspection requirement — Interior lighting power
RUWAN RAJAPAKSE
11/26/2025
Special inspection requirement — Air barrier — testing
RUWAN RAJAPAKSE
11/26/2025
Special inspection requirement — Air barrier - visual inspection
RUWAN RAJAPAKSE
11/26/2025
Special inspection requirement — Fenestration areas
RUWAN RAJAPAKSE
11/26/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
RUWAN RAJAPAKSE
11/26/2025
Special inspection requirement — Masonry
RUWAN RAJAPAKSE
11/26/2025
Special inspection requirement — Lighting in dwelling units
RUWAN RAJAPAKSE
11/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RUWAN RAJAPAKSE
11/26/2025
Special inspection requirement — Vestibules
RUWAN RAJAPAKSE
11/26/2025
Special inspection requirement — Fenestration air leakage
RUWAN RAJAPAKSE
11/26/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
RUWAN RAJAPAKSE
11/26/2025
Special inspection requirement — Metering
RUWAN RAJAPAKSE
11/26/2025
Special inspection requirement — Maintenance information
RUWAN RAJAPAKSE
11/26/2025
Special inspection requirement — Insulation placement and R values
RUWAN RAJAPAKSE
11/26/2025
Special inspection requirement — Lighting controls
RUWAN RAJAPAKSE
11/21/2025
Signed off — New Building
FILING SPRINKLER WORK TYPE IN CONJUNCTION WITH NB APPLICATION X00876463.
X00876463-S4
11/17/2025
Objection resolved — Addressed
11/11/2025
Filed — New Building
FILING SPRINKLER WORK TYPE IN CONJUNCTION WITH NB APPLICATION X00876463.
X00876463-P8
11/07/2025
Signed off — New Building
FILING SPRINKLER WORK TYPE IN CONJUNCTION WITH NB APPLICATION X00876463.
X00876463-S5
11/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
RUWAN RAJAPAKSE
11/06/2025
Special inspection requirement — Maintenance information
RUWAN RAJAPAKSE
11/06/2025
Special inspection requirement — Shutoff dampers
RUWAN RAJAPAKSE
11/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
RUWAN RAJAPAKSE
11/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
RUWAN RAJAPAKSE
11/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RUWAN RAJAPAKSE
11/06/2025
Special inspection requirement — Mechanical Systems
RUWAN RAJAPAKSE
11/06/2025
Special inspection requirement — Energy Code Compliance Inspections
RUWAN RAJAPAKSE
11/06/2025
Special inspection requirement — Final
RUWAN RAJAPAKSE
10/22/2025
Objection raised — Other
10/15/2025
Filed — New Building
FILING SPRINKLER WORK TYPE IN CONJUNCTION WITH NB APPLICATION X00876463.
X00876463-P7
10/14/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
RUWAN RAJAPAKSE
10/14/2025
Special inspection requirement — Masonry
RUWAN RAJAPAKSE
10/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RUWAN RAJAPAKSE
10/10/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/08/2025
Signed off — New Building
FILING SPRINKLER WORK TYPE IN CONJUNCTION WITH NB APPLICATION X00876463.
X00876463-S7
10/08/2025
Signed off — New Building
FILING SPRINKLER WORK TYPE IN CONJUNCTION WITH NB APPLICATION X00876463.
X00876463-S8
10/07/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/19/2025
Signed off — New Building
FILING SPRINKLER WORK TYPE IN CONJUNCTION WITH NB APPLICATION X00876463.
X00876463-S6
09/05/2025
Objection resolved — Addressed
08/12/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/08/2025
Permit issued — Curb Cut
X00876463-S8-CC
08/08/2025
Permit issued — Mechanical Systems
X00876463-S4-MS
08/08/2025
Objection resolved — Addressed
08/07/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/06/2025
Permit issued — General Construction
X00876463-I1-GC
08/02/2025
Objection resolved — Addressed
08/02/2025
Objection resolved — Addressed
07/31/2025
Objection raised — Other
07/31/2025
Objection raised — Other
07/25/2025
Filed — New Building
FILING SPRINKLER WORK TYPE IN CONJUNCTION WITH NB APPLICATION X00876463.
X00876463-P5
07/25/2025
Filed — New Building
FILING SPRINKLER WORK TYPE IN CONJUNCTION WITH NB APPLICATION X00876463.
X00876463-P6
07/25/2025
Objection raised — Other
07/25/2025
Objection raised — Other
07/18/2025
Filed — New Building
FILING SPRINKLER WORK TYPE IN CONJUNCTION WITH NB APPLICATION X00876463.
X00876463-P4
07/15/2025
Signed off — New Building
FILING SPRINKLER WORK TYPE IN CONJUNCTION WITH NB APPLICATION X00876463.
X00876463-S3
Latest 60 of 154 events.
▾Design Consultants (Architect / Engineer of Record)
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GRAND INSPECTION & CONSUL67921411/11/2025
GTA ENGINEERING SERVICES2940207/25/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offZEFI & CO. LLC08/08/2025
DOB NOWMechanical SystemsSigned-offZEFI & CO. LLC08/08/2025
DOB NOWGeneral ConstructionPermit IssuedZEFI & CO. LLC08/06/2025
DOB NOWConstruction FenceSigned-offZEFI & CO. LLC07/02/2025
DOB NOWSprinklersSigned-offGO PRO FIRE PROTECTION C02/13/2025
DOB NOWGeneral ConstructionPermit IssuedZEFI & CO. LLC12/10/2024
DOB NOWStructuralSigned-offZEFI & CO. LLC11/18/2024
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR09/23/2024
DOB NOWEarth WorkSigned-offVERA CARTING CORP08/15/2024
DOB NOWConstruction FenceSigned-offZEFI & CO. LLC07/10/2024
DOB NOWSupport of ExcavationSigned-offZEFI & CO. LLC07/09/2024
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
01/27/2026Pass-Final CND-Occupancy InspectionPassView ↗
10/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/07/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
08/12/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/07/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/03/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/03/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 80
DateRequirementInspectorRole
11/26/2025Exterior Insulation and Finish Systems (EIFS)RUWAN RAJAPAKSEspecial
11/26/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRUWAN RAJAPAKSEspecial
11/26/2025Air barrier - visual inspectionRUWAN RAJAPAKSEenergy_progress
11/26/2025MasonryRUWAN RAJAPAKSEspecial
11/26/2025Exterior lighting powerRUWAN RAJAPAKSEenergy_progress
11/26/2025Lighting in dwelling unitsRUWAN RAJAPAKSEenergy_progress
11/26/2025Fenestration areasRUWAN RAJAPAKSEenergy_progress
11/26/2025Lighting controlsRUWAN RAJAPAKSEenergy_progress
11/26/2025Electrical motors and elevatorsRUWAN RAJAPAKSEenergy_progress
11/26/2025Fenestration and door U-factor and product ratingsRUWAN RAJAPAKSEenergy_progress
11/26/2025VestibulesRUWAN RAJAPAKSEenergy_progress
11/26/2025Interior lighting powerRUWAN RAJAPAKSEenergy_progress
11/26/2025Air barrier — testing RUWAN RAJAPAKSEenergy_progress
11/26/2025Fenestration air leakageRUWAN RAJAPAKSEenergy_progress
11/26/2025MeteringRUWAN RAJAPAKSEenergy_progress
11/26/2025Maintenance informationRUWAN RAJAPAKSEenergy_progress
11/26/2025Insulation placement and R valuesRUWAN RAJAPAKSEenergy_progress
11/26/2025Fire-Resistant Penetrations and JointsRUWAN RAJAPAKSEspecial
11/06/2025HVAC-R and service water heating system controlsRUWAN RAJAPAKSEenergy_progress
11/06/2025Maintenance informationRUWAN RAJAPAKSEenergy_progress
11/06/2025HVAC-R and service water piping design and insulationRUWAN RAJAPAKSEenergy_progress
11/06/2025HVAC-R and service water heating equipmentRUWAN RAJAPAKSEenergy_progress
11/06/2025Shutoff dampersRUWAN RAJAPAKSEenergy_progress
11/06/2025FinalRUWAN RAJAPAKSEprogress
11/06/2025Energy Code Compliance InspectionsRUWAN RAJAPAKSEprogress
Latest 25 of 80.
▾Documents — 97 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/19/2026X00876463-P1Request digital key ↗
08/19/2026X00876463-P8Request digital key ↗
08/19/2026X00876463-P3Request digital key ↗
Showing 3 of 17 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/15/2026X00876463-I1Open ↗
08/13/2026X00876463-P7Open ↗
08/13/2026X00876463-P4Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/15/2026X00876463-I1Open ↗
08/13/2026X00876463-P4Open ↗
08/13/2026X00876463-P7Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026X00876463-I1Open ↗
▸Seals & Professional Certifications47
▸DOB NOWSpecial Inspector Seal & Signature19
09/02/2026X00876463-S2Open ↗
09/02/2026X00876463-S2Open ↗
09/01/2026X00876463-S5Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/19/2026X00876463-P8Open ↗
08/19/2026X00876463-P7Open ↗
08/19/2026X00876463-P6Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/02/2026X00876463-S2Open ↗
09/01/2026X00876463-S5Open ↗
09/01/2026X00876463-S5Open ↗
Showing 3 of 11 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/15/2026X00876463-I1Open ↗
08/13/2026X00876463-P4Open ↗
08/13/2026X00876463-P7Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/15/2026X00876463-I1Open ↗
08/15/2026X00876463-P4Open ↗
08/14/2026X00876463-P7Open ↗
▸DOB NOWStreet Trees Site Plan1
08/15/2026X00876463-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/15/2026X00876463-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026X00876463-I1Open ↗
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
08/19/2026X00876463-S5Open ↗
08/19/2026X00876463-S4Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026X00876463-S2Open ↗
08/13/2026X00876463-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X00876463-S2Open ↗
▸Other Documents12
▸DOB NOWSite Survey: Initial3
08/15/2026X00876463-I1Open ↗
08/13/2026X00876463-P4Open ↗
08/13/2026X00876463-P7Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/15/2026X00876463-I1Open ↗
08/13/2026X00876463-P7Open ↗
08/13/2026X00876463-P4Open ↗
▸DOB NOWProperty Ownership Certification3
08/15/2026X00876463-I1Open ↗
08/15/2026X00876463-P4Open ↗
08/14/2026X00876463-P7Open ↗
▸DOB NOWAdjoining Owners Notification2
08/14/2026X00876463-S1Open ↗
08/13/2026X00876463-S2Open ↗
▸DOB NOWFinal Survey1
08/15/2026X00876463-I1Open ↗