Elevator apt, fireproof without stores
Sheepshead Bay (NYCHA)
2953 AVENUE W · BIN 3337295
💬 Discuss this project
1950Year Built
7Stories
D3Building Class
R5Zoning
585,546 sfGross Floor Area
528Units
LL97 Covered0 Active Violations 1 old, status unconfirmed ▸FISP: UNSAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC Housing Authority · 584,000 sf lot · 1 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
CellarDoor and enclosure replacement in EMR and basement1 filing · 8 docs
Filed — no permit issuedDemolition and site work38p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority2509/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Sherwood Design Engineers206/16/2026
RKTB Architects112/11/2024
Albert Aronov Architect112/11/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Joel Phagoo P.E103/21/2026
Shenoy Engineering P C403/21/2026
Joel Phagoo P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Drummond RucklinElectrical103/21/2026
Approved Electric Cont'gElectrical103/21/2026
Jemco Electric ContractorsElectrical103/22/2026
Prospect Electric ServiceElectrical103/21/2026
Stanco System Electrical ContElectrical103/21/2026
Segreti JosephElectrical103/21/2026
Syed-Naqvi AltafElectrical103/21/2026
Alson Electrical ContractingElectrical103/21/2026
The Maintenance CoElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Joel Phagoo, PE2416110/23/2024
Building Lifecycle
All (80)Filed (5)Permit Issued (1)Signed Off (1)Facade (FISP) (21)Violation (31)Objection (6)Special Inspection (15)
06/29/2026
Objection resolved — Addressed
06/22/2026
Objection raised — Other
06/16/2026
Filed — Alteration
As per HUB Consultation with Rami Bitar on 5/22/26, the job is to be reviewed by Central HUB Development. Job includes the demolition of existing Waste Yard, vehicular and pedestrian pavements, surface amenities and site elements, and landscaping. Job al
B01351458-I1
06/16/2026
Filed — Alteration
As per HUB Consultation with Rami Bitar on 5/22/26, the job is to be reviewed by Central HUB Development. Job includes the demolition of existing Waste Yard, vehicular and pedestrian pavements, surface amenities and site elements, and landscaping. Job al
B01351458-S1
06/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/27/2026
Special inspection requirement — Subgrade Inspections
05/27/2026
Special inspection requirement — Concrete - Cast-In-Place
01/26/2026
Special inspection requirement — Final
07/24/2025
Cycle 10 facade report submitted
07/24/2025
Cycle 10 facade report signed — UNSAFE
07/23/2025
Cycle 10 facade inspection completed
05/13/2025
Violation issued (FDNY_NOV, closed)
05/13/2025
Violation issued (FDNY_NOV, closed)
03/17/2025
Signed off — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD FOR EMERGENCY FACADE REPAIRS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B01129248-I1
01/23/2025
Objection resolved — Addressed
01/23/2025
Objection resolved — Addressed
12/24/2024
Objection raised — Scope
12/24/2024
Objection raised — Scope
12/11/2024
Filed — Alteration
In-kind replacement of doors and door frames at Elevator Machine Room. 2-HR rated enclosures in lobbies, corridors, and Basement. Replacement of power connection, lighting fixtures, receptacles in EMR and Elevator Pit.
B01112851-I1
12/11/2024
Filed — Alteration
In-kind replacement of doors and door frames at Elevator Machine Room. 2-HR rated enclosures in lobbies, corridors, and Basement. Replacement of power connection, lighting fixtures, receptacles in EMR and Elevator Pit.
B01112851-S1
12/04/2024
Cycle 9 facade report submitted
12/04/2024
Cycle 9 facade report signed — UNSAFE
12/04/2024
Special inspection requirement — Tenant Protection Plan Compliance
12/03/2024
Cycle 9 facade inspection completed
11/07/2024
Permit issued — Suspended Scaffold
B01129248-I1-SC
10/23/2024
Filed — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD FOR EMERGENCY FACADE REPAIRS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B01129248-I1
10/18/2024
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
09/17/2024
Special inspection requirement — Maintenance information
09/17/2024
Special inspection requirement — Interior lighting power
09/17/2024
Special inspection requirement — Lighting controls
09/17/2024
Special inspection requirement — Fire-Resistance Rated Construction
09/17/2024
Special inspection requirement — Energy Code Compliance Inspections
09/17/2024
Special inspection requirement — Tenant Protection Plan Compliance
09/17/2024
Special inspection requirement — Final
09/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/02/2023
Violation issued (FDNY_NOV, closed)
08/16/2023
Violation issued (FDNY_NOV, closed)
02/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/05/2017
Cycle 8 facade report submitted
06/05/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/01/2017
Cycle 8 facade report signed — UNSAFE
04/08/2017
Cycle 8 facade inspection completed
03/15/2017
Cycle 7 facade report signed — SWARMP
02/15/2017
Cycle 7 facade report submitted
01/18/2017
Cycle 7 facade inspection completed
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/18/2015
Violation issued (ECB, closed)
Construction
09/18/2013
Cycle 7 facade report submitted
09/18/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/2013
Cycle 7 facade report signed — UNSAFE
08/30/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/26/2013
Cycle 7 facade inspection completed
05/13/2013
Violation issued (ECB, closed)
Construction
02/28/2012
Cycle 6 facade report submitted
07/16/2010
Violation issued (ECB, closed)
Local Law
06/11/2010
Violation issued (ECB, closed)
Elevators
10/23/2009
Violation issued (ECB, closed)
Local Law
10/23/2009
Violation issued (ECB, closed)
Local Law
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offZoria Housing11/07/2024
BISEQISSUEDMetropolitan Enterprises03/06/2015
BISOTISSUEDZoria Housing12/11/2014
BISEQISSUEDZoria Housing09/22/2014
BISEQISSUEDVikrant Contracting & Builder08/28/2014
BISEQISSUEDMetropolitan Enterprises02/26/2014
BISEQISSUEDMetropolitan Enterprises05/08/2013
BISEQISSUEDMetropolitan Enterprises05/08/2012
BISPLISSUEDDynamic Contracting06/21/2011
BISEQISSUEDMetropolitan Enterprises05/20/2011
BISEQISSUEDMetropolitan Enterprises01/22/2010
BISPLISSUEDDynamic Contracting09/09/2009
BISOTISSUEDCrana Mechanical10/12/1999
BISPLISSUEDDNA Plumbing Contractors06/24/1999
BISOTISSUEDCrana Mechanical06/21/1999
BISOTISSUEDYork Development Company02/02/1999
1 project · most recent 06/16/2026
Storm
FiledStatusContractorScope
06/16/2026——Storm
3 projects · most recent 10/06/2021
General Wiring
FiledStatusContractorScope
10/06/2021CompleteJemco Electric Contractors—
11/13/2020Permit IssuedN.Y.C. Housing AuthorityGeneral Wiring
11/13/2020Permit IssuedN.Y.C. Housing AuthorityGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
06/12/2026Tenant Protection Plan Compliance—special
05/29/2026Tenant Protection Plan Compliance—special
05/27/2026Subgrade Inspections—special
05/27/2026Concrete - Cast-In-Place—special
01/26/2026Final—progress
12/04/2024Tenant Protection Plan Compliance—special
10/18/2024Post-installed AnchorsJOEL PHAGOOspecial
09/17/2024Maintenance information—energy_progress
09/17/2024Interior lighting power—energy_progress
09/17/2024Lighting controls—energy_progress
09/17/2024Fire-Resistance Rated Construction—progress
09/17/2024Energy Code Compliance Inspections—progress
09/17/2024Tenant Protection Plan Compliance—special
09/17/2024Final—progress
09/17/2024Fire-Resistant Penetrations and Joints—special
▾Documents — 87 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026B01129248-I1Request digital key ↗
08/23/2026B01112851-I1Request digital key ↗
08/23/2026B01112851-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits17
▸BISWORK PERMIT APPLICATION12
03/09/2015320122899Open ↗
12/11/2014340189496Open ↗
09/19/2014340188246Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
09/23/2014340189496Open ↗
09/19/2014340188246Open ↗
08/27/2014340180422Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications25
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
08/26/2015340189496Open ↗
08/06/2015320122899Open ↗
08/06/2015320122899Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026B01112851-S1Open ↗
08/23/2026B01112851-I1Open ↗
08/16/2026B01351458-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
09/23/2014340189496Open ↗
09/19/2014340188246Open ↗
08/27/2014340180422Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
09/23/2014340189496Open ↗
09/19/2014340188246Open ↗
08/27/2014340180422Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
09/23/2014340189496Open ↗
09/19/2014340188246Open ↗
08/27/2014340180422Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
01/25/2010320122899Open ↗
09/03/2009320066851Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
01/25/2010320122899Open ↗
09/03/2009320066851Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026B01129248-I1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
09/03/2009320066851Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
01/25/2010320122899Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
09/23/2014340189496Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
08/26/2015340189496Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/03/2009320066851Open ↗
▸Energy Compliance1
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/27/2014340180422Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
09/23/2014340189496Open ↗
09/19/2014340188246Open ↗
08/27/2014340180422Open ↗
▸Approvals, Objections & Sign-offs19
▸BISLETTERS - SUPPORTING DOCUMENTATION7
08/26/2015340189496Open ↗
05/20/2015340188246Open ↗
05/20/2015340180422Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
08/26/2015340189496Open ↗
08/06/2015320122899Open ↗
05/20/2015340188246Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/16/2026B01351458-I1Open ↗
08/15/2026B01351458-S1Open ↗
08/13/2026B01112851-S1Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
01/25/2010320122899Open ↗
09/03/2009320066851Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
08/26/2015340189496Open ↗
09/23/2014340189496Open ↗
09/28/2011320066851Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms5
▸BISEFILING JOB APPLICATION COVER SHEET3
09/23/2014340189496Open ↗
09/19/2014340188246Open ↗
08/27/2014340180422Open ↗
▸BISEFILING COVER SHEET2
01/25/2010320122899Open ↗
09/03/2009320066851Open ↗
▸Other Documents3
▸BISOP-4 - Special Report1
08/06/2015320122899Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01129248-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B01129248-I1Open ↗