← Back
BuildNYC
Elevator apt, semi-fireproof without stores
2954 BRIGHTON 3 STREET
BROOKLYN · Brighton Beach · BIN 3424552
💬 Discuss this project
2016Year Built
7Stories
D1Building Class
R6Zoning
16,006 sfGross Floor Area
17Units
Rent Stabilized7 Active Violations 4 unresolved · 3 paperwork only ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: Brighton 52 Realty · 6,800 sf lot · 2.35 FAR built · Flood zone AE
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 12952 Brighton 3rd Street, LLC6p · 1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Brighton 52 Realty2803/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/31/2013$385K—Private party → BRIGHTON 52 REALTY, LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Concord Associates402/21/2024
Dome Archietcture, Design & Engineering112/19/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Reliable Expediting503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LakhGeneral Contractor103/21/2026
UtaGeneral Contractor107/08/2026
UTAspecialty_contractor103/21/2026
Utaspecialty_contractor203/21/2026
GW MechanicalPlumbing107/08/2026
1st Excavation Group of NGeneral Contractor107/29/2014
Arsh Gen ConstructionGeneral Contractor112/18/2015
CS BridgeGeneral Contractor210/12/2017
Real PlumbingFire Protection212/12/2018
Rite Way Plumbing & HeatingPlumbing109/26/2017
Rite Way Plumbing & HeatingPlumbing111/29/2018
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Steel Core Engineering1098302/21/2024
Building Lifecycle
11/20/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
07/23/2025
Elevator Category 1 inspection report filed
03/19/2025
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE 2nd ROOM FROM…
HPD violation · closed
03/19/2025
§ 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY…
HPD violation · closed
03/19/2025
§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY, 1st…
HPD violation · closed
85 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offUta02/16/2024
DOB NOWMechanical SystemsSigned-offUta01/29/2024
DOB NOWPlumbingSigned-offGW Mechanical01/19/2024
BISSPISSUEDMega Plumbing12/12/2018
BISPLISSUEDRite Way Plumbing & Heating11/29/2018
BIS—ISSUEDLakh09/17/2018
BISEQISSUEDLakh09/17/2018
BISSPISSUEDMega Plumbing10/19/2017
BISEQISSUEDCS Bridge10/12/2017
BISPLISSUEDRite Way Plumbing & Heating09/26/2017
BISMHISSUEDLakh09/20/2017
BISEQISSUEDLakh07/25/2017
BIS—ISSUEDLakh07/25/2017
BISEQISSUEDCS Bridge10/24/2016
BISEQISSUEDLakh07/27/2016
BIS—ISSUEDLakh07/27/2016
BIS—ISSUEDLakh12/29/2015
BIS—ISSUEDLakh12/23/2015
BISEQISSUEDArsh Gen Construction12/18/2015
BISEQISSUEDLakh07/24/2015
BIS—ISSUEDLakh07/24/2015
BISEQISSUEDLakh06/15/2015
BIS—ISSUEDLakh06/15/2015
BISEQISSUEDLakh08/13/2014
BIS—ISSUED1st Excavation Group of N07/29/2014
BISEQISSUEDLakh03/05/2014
1 project · most recent 02/21/2024
Gas Water/Sanitary
FiledStatusContractorScope
02/21/2024Signed-offGW MechanicalGas, Water/Sanitary
2 projects · most recent 06/14/2024
General Wiring
FiledStatusContractorScope
06/14/2024Permit IssuedKings ElectricGeneral Wiring
03/25/2019CompleteGrey Goose ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/15/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/20/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
02/28/2024Mechanical SystemsAlexander Sheymanspecial
02/28/2024FinalAlexander Sheymanprogress
02/28/2024Tenant Protection Plan ComplianceAlexander Sheymanspecial
02/20/2024Tenant Protection Plan Compliance—special
02/20/2024FinalAlexander Sheymanprogress
02/20/2024Mechanical SystemsAlexander Sheymanspecial
02/20/2024Tenant Protection Plan Compliance—special
12/15/2022Tenant Protection Plan ComplianceAlexander Sheymanspecial
12/15/2022FinalAlexander Sheymanprogress
172 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account