← Back
BuildNYC
Elevator apt, fireproof without stores
Sheepshead Bay (NYCHA)
2955 AVENUE X · BIN 3344550
💬 Discuss this project
1950Year Built
6Stories
D3Building Class
R5Zoning
649,095 sfGross Floor Area
528Units
LL97 Covered3 Active Violations 2 unresolved · 1 paperwork only 1 likely answered ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC Housing Authority · 511,000 sf lot · 1.27 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofElevator rehabilitation and door replacement5p · 2 filings · 9 docs
Floor 6Elevator rehabilitation and door replacement1 filing · 4 docs
Floor 5Elevator rehabilitation and door replacement1 filing · 4 docs
Floor 4Elevator rehabilitation and door replacement1 filing · 4 docs
Floor 3Elevator rehabilitation and door replacement1 filing · 4 docs
Floor 2Elevator rehabilitation and door replacement1 filing · 4 docs
Floor 1Bay Kids Miniversite handicap accessibility9p · 4 filings · 19 docs
Sub-BasementBay Kids Miniversite handicap accessibility2p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority4107/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RKTB Architects112/08/2024
Dmytro Chornobryvets Architect107/06/2021
Joel Phagoo P.E201/02/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Shenoy Engineering P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Planet RenovationsGeneral Contractor403/21/2026
TCS ConstructionGeneral Contractor303/21/2026
Neelam ConstructionScaffold307/08/2026
Dudley & Associates Lic. ElectricElectrical203/21/2026
Dudley JamalElectrical203/21/2026
Skyworx ContractingScaffold203/21/2026
Syed-Naqvi AltafElectrical103/21/2026
Prospect Electric ServiceElectrical103/21/2026
Maximum Electrical ContractingElectrical103/21/2026
Segreti JosephElectrical103/21/2026
Dynamic Electric SystemElectrical103/21/2026
Alson Electrical ContractingElectrical103/21/2026
Building Lifecycle
All (61)Filed (4)Permit Issued (6)Signed Off (2)Facade (FISP) (23)Violation (18)Special Inspection (8)
06/02/2025
Violation issued (FDNY_NOV, closed)
06/02/2025
Violation issued (FDNY_NOV, closed)
04/17/2025
Cycle 10 facade report submitted
04/17/2025
Cycle 10 facade report signed — SWARMP
04/10/2025
Cycle 10 facade inspection completed
12/08/2024
Filed — Alteration
In-kind replacement of doors and door frames at Elevator Machine Room, Elevator Pit and Pipe Space. 2-HR rated enclosures in lobbies, corridors, and Basement. Replacement of power connection, lighting fixtures, receptacles in EMR and Elevator Pit.
B01112221-I1
11/19/2024
Special inspection requirement — Tenant Protection Plan Compliance
09/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
09/16/2024
Special inspection requirement — Energy Code Compliance Inspections
09/16/2024
Special inspection requirement — Interior lighting power
09/16/2024
Special inspection requirement — Maintenance information
09/16/2024
Special inspection requirement — Lighting controls
09/22/2022
Permit issued — General Construction
B00493844-I1-GC
02/09/2022
Permit issued — General Construction
B00493844-I1-GC
08/03/2021
Permit issued — General Construction
B00493844-I1-GC
07/06/2021
Filed — Alteration
B00493844-I1
03/26/2021
Special inspection requirement — Final
DMYTRO CHORNOBRYVETS
12/29/2020
Cycle 9 facade inspection completed
12/27/2020
Cycle 9 facade report signed — SAFE
10/02/2020
Cycle 9 facade report submitted
08/24/2020
Signed off — Alteration
B00246408-I1
08/24/2020
Signed off — Alteration
B00290011-I1
08/05/2020
Cycle 8 facade report submitted
08/01/2020
Cycle 8 facade report signed — SAFE
07/29/2020
Cycle 8 facade inspection completed
05/21/2020
Permit issued — Construction Fence
B00246408-I1-FN
01/02/2020
Filed — Alteration
B00290011-I1
01/02/2020
Permit issued — Sidewalk Shed
B00290011-I1-SH
10/16/2019
Permit issued — Construction Fence
B00246408-I1-FN
10/15/2019
Filed — Alteration
B00246408-I1
04/05/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/05/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/21/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/15/2017
Cycle 8 facade report submitted
01/12/2017
Cycle 8 facade report signed — UNSAFE
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/19/2016
Cycle 8 facade inspection completed
12/22/2015
Violation issued (ECB, closed)
Construction
02/11/2015
Cycle 6 facade report submitted
02/11/2015
Cycle 7 facade report submitted
07/21/2014
Violation issued (FDNY_ORDER, closed)
09/18/2013
Cycle 7 facade report submitted
09/18/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/2013
Cycle 7 facade report signed — UNSAFE
08/22/2013
Cycle 7 facade inspection completed
01/31/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/28/2012
Cycle 6 facade report submitted
07/16/2010
Violation issued (ECB, closed)
Construction
05/21/2010
Violation issued (ECB, closed)
Elevators
03/26/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/22/2010
Cycle 6 facade report submitted
02/06/2010
Cycle 6 facade report signed — UNSAFE
02/06/2010
Cycle 6 facade report signed — UNSAFE
02/06/2010
Violation issued (ECB, closed)
Construction
12/05/2009
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
10/01/2009
Cycle 6 facade inspection completed
10/01/2009
Cycle 6 facade inspection completed
04/24/2009
Violation issued (ECB, closed)
Construction
11/30/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPlanet Renovations09/22/2022
DOB NOWGeneral ConstructionPermit IssuedPlanet Renovations02/09/2022
DOB NOWGeneral ConstructionPermit IssuedTCS Construction08/03/2021
DOB NOWConstruction FenceSigned-offNeelam Construction05/21/2020
DOB NOWSidewalk ShedSigned-offSkyworx Contracting01/02/2020
DOB NOWConstruction FenceSigned-offNeelam Construction10/16/2019
BISOTISSUEDNeelam Construction01/03/2020
BISEQISSUEDSkyworx Contracting05/02/2019
BISEQISSUEDSkyworx Contracting05/11/2018
BISEQISSUEDSkyworx Contracting05/19/2017
BISPLISSUEDBelco Associates05/24/2016
BISEQISSUEDNeelam Construction05/23/2016
BISEQISSUEDSkyworx Contracting05/09/2016
BISOTISSUEDZoria Housing11/06/2014
BISOTISSUEDZoria Housing10/22/2014
BISEQISSUEDZoria Housing09/26/2014
BISEQISSUEDZoria Housing09/19/2014
BISEQISSUEDVikrant Contracting & Builder08/28/2014
BISEQISSUEDMetropolitan Enterprises02/26/2014
BISFPISSUEDAllied Fire Control Services01/29/2014
BISEQISSUEDMetropolitan Enterprises07/19/2013
BISOTISSUEDZoria Housing03/08/2013
BISEQISSUEDZoria Housing02/15/2013
BISEQISSUEDZoria Housing11/12/2012
BISEQISSUEDVikrant Contracting & Builder11/09/2012
BISEQISSUEDMetropolitan Enterprises05/09/2012
BISEQISSUEDMetropolitan Enterprises05/20/2011
BISPLISSUEDDynamic Contracting03/11/2011
BISEQISSUEDMetropolitan Enterprises04/14/2010
BISEQISSUEDPioneer General Construction03/02/2007
BISPLISSUEDAmerican Mechanical04/30/2002
BISPLISSUEDDNA Plumbing Contractors06/25/1999
BISOTISSUEDCrane Mechanical06/23/1999
5 projects · most recent 10/06/2021
General Wiring
FiledStatusContractorScope
10/06/2021CompleteJemco Electric Contractors—
10/05/2021CompleteA.T.J. Electrical Co—
08/19/2020Permit IssuedN.Y.C. Housing AuthorityGeneral Wiring
08/19/2020Permit IssuedN.Y.C. Housing AuthorityGeneral Wiring
11/26/2019CompleteAmin Electrical—
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
11/19/2024Tenant Protection Plan Compliance—special
09/16/2024Fire-Resistant Penetrations and Joints—special
09/16/2024Fire-Resistance Rated Construction—progress
09/16/2024Energy Code Compliance Inspections—progress
09/16/2024Interior lighting power—energy_progress
09/16/2024Maintenance information—energy_progress
09/16/2024Lighting controls—energy_progress
03/26/2021FinalDMYTRO CHORNOBRYVETSprogress
▾Documents — 243 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch2
09/01/2026B00493844-I1Request digital key ↗
08/23/2026B01112221-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00246408-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00290011-I1Request digital key ↗
▸Applications & Permits50
▸BISWORK PERMIT APPLICATION26
01/02/2020340712278Open ↗
05/06/2019340379414Open ↗
10/10/2018340379414Open ↗
Showing 3 of 26 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION24
01/02/2020340712278Open ↗
12/26/2017321010160Open ↗
06/28/2016321405181Open ↗
Showing 3 of 24 on file for this type
▸Seals & Professional Certifications68
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION23
08/08/2016320869976Open ↗
06/28/2016321405181Open ↗
06/28/2016321405181Open ↗
Showing 3 of 23 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
01/02/2020340712278Open ↗
06/28/2016321405181Open ↗
06/15/2016321403986Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY10
01/02/2020340712278Open ↗
05/20/2016340382650Open ↗
05/08/2016340379414Open ↗
Showing 3 of 10 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION10
01/02/2020340712278Open ↗
05/20/2016340382650Open ↗
05/08/2016340379414Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
06/28/2016321405181Open ↗
06/15/2016321403986Open ↗
01/18/2013320507420Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026B00493844-I1Open ↗
08/13/2026B00246408-I1Open ↗
08/13/2026B00290011-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
01/18/2013320507420Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026B00493844-I1Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
06/28/2016321405181Open ↗
06/15/2016321403986Open ↗
01/09/2014320869976Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
08/08/2016320869976Open ↗
02/04/2016321010160Open ↗
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSELF-CERT PLUMBING NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection5
▸BISTENANT PROTECTION PLAN AND NOTES3
01/02/2020340712278Open ↗
05/20/2016340382650Open ↗
05/08/2016340379414Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026B00290011-I1Open ↗
08/13/2026B00246408-I1Open ↗
▸Environmental & Asbestos13
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
01/02/2020340712278Open ↗
06/28/2016321405181Open ↗
06/28/2016321405181Open ↗
Showing 3 of 7 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
11/04/2015340187041Open ↗
09/02/2014320507420Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
09/16/2014340187041Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00493844-I1Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
06/28/2016321405181Open ↗
06/15/2016321403986Open ↗
06/15/2016321403986Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/09/2020340712278Open ↗
01/02/2020340712278Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/26/2014340179933Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/09/2020340712278Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/02/2020340712278Open ↗
▸BISNYCECC ANALYSIS1
01/02/2020340712278Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY11
11/09/2020340712278Open ↗
01/02/2020340712278Open ↗
05/20/2016340382650Open ↗
Showing 3 of 11 on file for this type
▸Approvals, Objections & Sign-offs31
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
11/09/2020340712278Open ↗
01/17/2018321010160Open ↗
10/02/2017321010160Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
05/20/2015340190563Open ↗
05/20/2015340187853Open ↗
05/20/2015340179933Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/13/2026B00493844-I1Open ↗
08/13/2026B01112221-I1Open ↗
08/13/2026B00290011-I1Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
01/18/2013320507420Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)3
08/13/2026B01112221-I1Open ↗
08/13/2026B00290011-I1Open ↗
08/13/2026B00246408-I1Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT14
01/02/2020340712278Open ↗
10/02/2017321010160Open ↗
08/08/2016320869976Open ↗
Showing 3 of 14 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
11/09/2020340712278Open ↗
▸Filing & Intake Forms26
▸BISEFILING JOB APPLICATION COVER SHEET10
01/02/2020340712278Open ↗
05/20/2016340382650Open ↗
05/08/2016340379414Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET8
06/24/2016321405181Open ↗
06/16/2016321403986Open ↗
08/11/2015321010160Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION6
10/06/2020340712278Open ↗
01/15/2020340712278Open ↗
07/05/2013320507420Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM2
01/17/2018321010160Open ↗
10/02/2017321010160Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
11/04/2015340187041Open ↗
11/08/2012340020195Open ↗
▸BISOP-4 - Special Report1
08/06/2015320148274Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
01/02/2020340712278Open ↗