← Back
Single or multiple dwelling with stores or offices
2958 WHITE PLAINS ROAD
BRONX · Allerton · BIN 2054784
💬 Discuss this project
1931Year Built
3Stories
S9Building Class
R6Zoning
6,525 sfGross Floor Area
5Units
56 Open Violations 46 unresolved · 10 paperwork only ▸
Single or multiple dwelling with stores or offices · Owner of record: 700 Y & Z REALTY LLC · 5,000 sf lot · 1.31 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire ProtectionCivilGeneral
Filed — no permit issued29p · 4 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Valor Management203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/12/2021$1.3M—— → —$195/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROJAS ENGINEERING, PLLC105/13/2026
LUGADI LLC204/30/2026
SERDAR CEYLAN ARCHITECT, PC201/12/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROJAS ENGINEERING PLLC6232105/13/2026
Building Lifecycle
All (103)Filed (5)Violation (60)Objection (8)Special Inspection (30)
05/13/2026
Filed — New Building
New 4-story mix-use building with commercial space and 21 dwelling units.
X01390442-I1
05/05/2026
Special inspection requirement — Lighting in dwelling units
Darlyn Alvarez
05/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Darlyn Alvarez
05/05/2026
Special inspection requirement — Maintenance information
Darlyn Alvarez
05/05/2026
Special inspection requirement — Masonry
Darlyn Alvarez
05/05/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Darlyn Alvarez
05/05/2026
Special inspection requirement — Subgrade Inspections
Darlyn Alvarez
05/05/2026
Special inspection requirement — Energy Code Compliance Inspections
Darlyn Alvarez
05/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
Darlyn Alvarez
05/05/2026
Special inspection requirement — Exterior lighting power
Darlyn Alvarez
05/05/2026
Special inspection requirement — Interior lighting power
Darlyn Alvarez
05/05/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Darlyn Alvarez
05/05/2026
Special inspection requirement — Metering
Darlyn Alvarez
05/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
Darlyn Alvarez
05/05/2026
Special inspection requirement — Permanent certificate
Darlyn Alvarez
05/05/2026
Special inspection requirement — Lighting controls
Darlyn Alvarez
05/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
Darlyn Alvarez
05/05/2026
Special inspection requirement — Concrete - Cast-In-Place
Darlyn Alvarez
05/05/2026
Special inspection requirement — Protection of exposed foundation insulation
Darlyn Alvarez
05/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Darlyn Alvarez
05/05/2026
Special inspection requirement — Vestibules
Darlyn Alvarez
04/30/2026
Filed — Full Demolition
full demolition of three story structure under DOB IED control #350346
X01376863-S1
04/29/2026
Special inspection requirement — Fenestration air leakage
Darlyn Alvarez
04/29/2026
Special inspection requirement — Air barrier - visual inspection
Darlyn Alvarez
04/29/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Darlyn Alvarez
04/29/2026
Special inspection requirement — Insulation placement and R values
Darlyn Alvarez
04/29/2026
Special inspection requirement — Fenestration areas
Darlyn Alvarez
03/30/2026
Objection raised — Other
03/30/2026
Objection resolved — Addressed
03/26/2026
Filed — Full Demolition
full demolition of three story structure under DOB IED control #350346
X01376863-I1
01/29/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/28/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/26/2026
Objection raised — Structural
01/21/2026
Objection raised — Scope
01/14/2026
Objection resolved — Addressed
01/14/2026
Objection resolved — Addressed
01/12/2026
Filed — Alteration
PLUMBING WORK TYPE HAS BEEN FILED IN CONJUNCTION WITH #X01313834 IN EXISTING 2 FAMILY AND COMMERSIAL STORE MIXED USE BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01330993-I1
01/12/2026
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
01/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
12/29/2025
Objection raised — Cost
12/29/2025
Objection raised — Zoning
12/19/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 4 APARTMENTS ON 2ND AND 3RD FLOORS AS PER PLANS SUBMTTED TO CURE THE VIOLATION #35078910R. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ALSO FILED FOR REMOVAL OF MODINE FURNACE AND THE OIL BURNER TO CURE THE VIOLATION #32069000Y
X01313834-I1
12/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/09/2025
Special inspection requirement — Interior lighting power
SERDAR CEYLAN
12/09/2025
Special inspection requirement — Insulation placement and R values
SERDAR CEYLAN
11/26/2025
Violation issued (ECB, open)
Unknown
11/26/2025
Violation issued (ECB, open)
Construction
11/26/2025
Violation issued (ECB, open)
Construction
11/26/2025
Violation issued (ECB, open)
Construction
11/26/2025
Violation issued (ECB, open)
Construction
11/26/2025
Violation issued (ECB, open)
Construction
11/26/2025
Violation issued (ECB, open)
Construction
11/26/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/06/2024
Violation issued (ECB, open)
Construction
02/21/2024
Violation issued (HPD, closed)
A
02/21/2024
Violation issued (HPD, closed)
B
02/21/2024
Violation issued (HPD, closed)
B
02/21/2024
Violation issued (HPD, closed)
B
02/21/2024
Violation issued (HPD, closed)
B
Latest 60 of 103 events.
Nothing on file for this building.
1 project · most recent 01/12/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/12/2026——Gas, Water/Sanitary
1 project · most recent 05/13/2026
Masonry
FiledStatusContractorScope
05/13/2026——Masonry
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
05/05/2026Lighting in dwelling unitsDarlyn Alvarezenergy_progress
05/05/2026Fire-Resistant Penetrations and JointsDarlyn Alvarezspecial
05/05/2026Maintenance informationDarlyn Alvarezenergy_progress
05/05/2026MasonryDarlyn Alvarezspecial
05/05/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDarlyn Alvarezspecial
05/05/2026Subgrade InspectionsDarlyn Alvarezspecial
05/05/2026Energy Code Compliance InspectionsDarlyn Alvarezprogress
05/05/2026Fire-Resistance Rated ConstructionDarlyn Alvarezprogress
05/05/2026Exterior lighting powerDarlyn Alvarezenergy_progress
05/05/2026Interior lighting powerDarlyn Alvarezenergy_progress
05/05/2026Excavations - Sheeting, Shoring, and BracingDarlyn Alvarezspecial
05/05/2026MeteringDarlyn Alvarezenergy_progress
05/05/2026HVAC-R and service water heating equipmentDarlyn Alvarezenergy_progress
05/05/2026Permanent certificateDarlyn Alvarezenergy_progress
05/05/2026Lighting controlsDarlyn Alvarezenergy_progress
05/05/2026HVAC-R and service water heating system controlsDarlyn Alvarezenergy_progress
05/05/2026Concrete - Cast-In-PlaceDarlyn Alvarezspecial
05/05/2026Protection of exposed foundation insulationDarlyn Alvarezenergy_progress
05/05/2026HVAC-R and service water piping design and insulationDarlyn Alvarezenergy_progress
05/05/2026VestibulesDarlyn Alvarezenergy_progress
04/29/2026Fenestration air leakageDarlyn Alvarezenergy_progress
04/29/2026Air barrier - visual inspectionDarlyn Alvarezenergy_progress
04/29/2026Fenestration and door U-factor and product ratingsDarlyn Alvarezenergy_progress
04/29/2026Insulation placement and R valuesDarlyn Alvarezenergy_progress
04/29/2026Fenestration areasDarlyn Alvarezenergy_progress
Latest 25 of 32.
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/16/2026X01376863-S1Request digital key ↗
08/16/2026X01390442-I1Request digital key ↗
08/15/2026X01376863-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026X01390442-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature5
09/02/2026X01330993-I1Open ↗
09/02/2026X01330993-I1Open ↗
08/31/2026X01390442-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026X01313834-I1Open ↗
08/16/2026X01376863-S1Open ↗
08/16/2026X01390442-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/14/2026X01313834-I1Open ↗
▸Other Documents1
▸DOB NOWSite Survey: Initial1
08/16/2026X01390442-I1Open ↗