← Back
Two family converted from one family
297 MACON STREET
BROOKLYN · BIN 3053198
💬 Discuss this project
1873Year Built
3Stories
B3Building Class
R6BZoning
3,200 sfGross Floor Area
2Units
3 Open Violations 0 unresolved · 3 paperwork only ▸FDNY Report ↗
Two family converted from one family · 2,000 sf lot · 1.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Floor 3Under Construction43p · 2 filings · 20 docs
Floor 2Under Construction42p · 2 filings · 20 docs
Floor 1Under Construction43p · 2 filings · 20 docs
CellarUnder Construction51p · 2 filings · 20 docs
BasementUnder Construction44p · 1 filing · 20 docs
Sub-Basement1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MACON 297 LLC103/22/2026
LEVEL 10 CONSTRUCTION GR*203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/19/2025$1.6M—Private party → Private party$484/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CQ&J CORPORATION605/01/2026
THOMAS C. TUNG, P.E.304/07/2026
FL&M ENGINEERING DESIGN &INSPECTION403/26/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WM ARCH803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LEVEL 10 CONSTRUCTION GR*General Contractor307/08/2026
MC SUPERSTRUCTURE INCGeneral Contractor207/08/2026
BRUCHE MECHANICAL NY LLCFire Protection107/08/2026
PLBG P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SIMON7555505/01/2026
Building Lifecycle
All (73)Filed (13)Permit Issued (7)Violation (3)Inspection (6)Objection (14)Special Inspection (30)
08/19/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/03/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/03/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/16/2026
Objection resolved — Resolved
07/13/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/11/2026
Permit issued — Structural
B01253310-S5-ST
05/12/2026
Objection resolved — Resolved
05/05/2026
Special inspection requirement — Sprinkler Systems
SIMON JIANG
05/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
CALVIN TRAN
05/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
CALVIN TRAN
05/04/2026
Special inspection requirement — Energy Code Compliance Inspections
CALVIN TRAN
05/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
CALVIN TRAN
05/01/2026
Filed — Alteration CO
REMOVE & REINSTALLATION OF PLUMBING SYSTEM THROUHOUT TWO (2) FAMILY DWELLING UNIT, 4-STORY WITH BASEMENT & CELLAR AS PER PLANS
B01253310-P3
05/01/2026
Filed — Alteration CO
REMOVE & REINSTALLATION OF PLUMBING SYSTEM THROUHOUT TWO (2) FAMILY DWELLING UNIT, 4-STORY WITH BASEMENT & CELLAR AS PER PLANS
B01253310-P2
04/30/2026
Filed — Alteration CO
REMOVE & REINSTALLATION OF PLUMBING SYSTEM THROUHOUT TWO (2) FAMILY DWELLING UNIT, 4-STORY WITH BASEMENT & CELLAR AS PER PLANS
B01253310-S2
04/29/2026
Special inspection requirement — Duct leakage testing, insulation and design
CALVIN TRAN
04/29/2026
Special inspection requirement — Shutoff dampers
04/28/2026
Special inspection requirement — HVAC-R and service water heating system controls
04/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/28/2026
Special inspection requirement — Heating Systems
04/28/2026
Special inspection requirement — Smoke Control Systems Testing
04/28/2026
Special inspection requirement — Energy Code Compliance Inspections
04/28/2026
Special inspection requirement — HVAC-R and service water heating equipment
04/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/28/2026
Special inspection requirement — Maintenance information
04/24/2026
Objection resolved — Addressed
04/23/2026
Objection resolved — Addressed
04/22/2026
Objection raised — Admin
04/22/2026
Objection raised — Energy
04/22/2026
Objection raised — Scope
04/21/2026
Objection raised — Scope
04/07/2026
Filed — Alteration CO
REMOVE & REINSTALLATION OF PLUMBING SYSTEM THROUHOUT TWO (2) FAMILY DWELLING UNIT, 4-STORY WITH BASEMENT & CELLAR AS PER PLANS
B01253310-S5
04/06/2026
Filed — Alteration CO
REMOVE & REINSTALLATION OF PLUMBING SYSTEM THROUHOUT TWO (2) FAMILY DWELLING UNIT, 4-STORY WITH BASEMENT & CELLAR AS PER PLANS
B01253310-P1
03/26/2026
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01289502-P1
03/26/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01362744-P1
03/13/2026
Violation issued (ECB, open)
Construction
03/13/2026
Violation issued (ECB, open)
Construction
03/13/2026
Violation issued (ECB, open)
Construction
02/25/2026
Permit issued — Supported Scaffold
B01362744-I1-SF
02/24/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01362744-I1
02/05/2026
Special inspection requirement — Energy Code Compliance Inspections
CALVIN TRAN
02/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
CALVIN TRAN
02/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
CALVIN TRAN
02/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
CALVIN TRAN
02/05/2026
Special inspection requirement — Sprinkler Systems
SIMON JIANG
01/26/2026
Permit issued — Plumbing
B01253310-S1-PL
01/26/2026
Permit issued — Sprinklers
B01253310-S3-EW-SP
12/15/2025
Filed — Alteration CO
REMOVE & REINSTALLATION OF PLUMBING SYSTEM THROUHOUT TWO (2) FAMILY DWELLING UNIT, 4-STORY WITH BASEMENT & CELLAR AS PER PLANS
B01253310-S3
12/05/2025
Filed — Alteration CO
REMOVE & REINSTALLATION OF PLUMBING SYSTEM THROUHOUT TWO (2) FAMILY DWELLING UNIT, 4-STORY WITH BASEMENT & CELLAR AS PER PLANS
B01253310-S1
12/04/2025
Special inspection requirement — Fenestration air leakage
THOMAS TUNG
12/04/2025
Special inspection requirement — Permanent certificate
THOMAS TUNG
12/04/2025
Special inspection requirement — Lighting controls
THOMAS TUNG
12/04/2025
Special inspection requirement — Metering
THOMAS TUNG
12/04/2025
Special inspection requirement — Fenestration areas
THOMAS TUNG
12/04/2025
Special inspection requirement — Lighting in dwelling units
THOMAS TUNG
12/04/2025
Special inspection requirement — Insulation placement and R values
THOMAS TUNG
12/04/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
THOMAS TUNG
12/04/2025
Special inspection requirement — Exterior lighting power
THOMAS TUNG
12/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SIMON JIANG
10/28/2025
Permit issued — General Construction
B01253310-I1-GC
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedLEVEL 10 CONSTRUCTION GR*06/11/2026
DOB NOWSupported ScaffoldPermit IssuedMC SUPERSTRUCTURE INC02/25/2026
DOB NOWPlumbingPermit IssuedPLBG P & H INC01/26/2026
DOB NOWSprinklersPermit IssuedBRUCHE MECHANICAL NY LLC01/26/2026
DOB NOWGeneral ConstructionPermit IssuedLEVEL 10 CONSTRUCTION10/28/2025
DOB NOWSidewalk ShedPermit IssuedMC SUPERSTRUCTURE INC09/22/2025
DOB NOWGeneral ConstructionPermit IssuedLEVEL 10 CONSTRUCTION07/29/2025
1 project · most recent 05/01/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/01/2026Permit IssuedLEVEL 10 CONSTRUCTIONHeating and Air Conditioning Systems
Heat / Cool
Daikin RXTA36AAVJU 35,200 BTU · Vrf Outdoor ×3
3MZM24AVJU9 23,000 BTU · Condensing Unit ×2
1 project · most recent 05/01/2026
Sprinkler System
FiledStatusContractorScope
05/01/2026Permit IssuedPLBG P & H INCSprinkler System
1 project · most recent 05/01/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/01/2026Permit IssuedPLBG P & H INCGas, Water/Sanitary
2 projects · most recent 03/19/2026
General Wiring
FiledStatusContractorScope
03/19/2026Permit IssuedOHR CHODOSH ELEC'L CONT IGeneral Wiring
09/17/2025Permit IssuedNASH ELECTRIC SERVICES IN—
1 project · most recent 05/01/2026
Wood
FiledStatusContractorScope
05/01/2026Permit IssuedLEVEL 10 CONSTRUCTIONWood
2 projects · most recent 03/26/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
03/26/2026Permit IssuedMC SUPERSTRUCTURE INCSidewalk Shed
03/26/2026Permit IssuedMC SUPERSTRUCTURE INCScaffold
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/19/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/03/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/03/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/13/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/27/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/06/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
05/05/2026Sprinkler SystemsSIMON JIANGspecial
05/04/2026HVAC-R and service water heating system controlsCALVIN TRANenergy_progress
05/04/2026HVAC-R and service water piping design and insulationCALVIN TRANenergy_progress
05/04/2026Energy Code Compliance InspectionsCALVIN TRANprogress
05/04/2026HVAC-R and service water heating equipmentCALVIN TRANenergy_progress
04/29/2026Duct leakage testing, insulation and designCALVIN TRANenergy_progress
04/29/2026Shutoff dampers—energy_progress
04/28/2026HVAC-R and service water heating system controls—energy_progress
04/28/2026Fire-Resistant Penetrations and Joints—special
04/28/2026Heating Systems—special
04/28/2026Smoke Control Systems Testing—special
04/28/2026Energy Code Compliance Inspections—progress
04/28/2026HVAC-R and service water heating equipment—energy_progress
04/28/2026HVAC-R and service water piping design and insulation—energy_progress
04/28/2026Maintenance information—energy_progress
02/05/2026Energy Code Compliance InspectionsCALVIN TRANprogress
02/05/2026HVAC-R and service water heating system controlsCALVIN TRANenergy_progress
02/05/2026HVAC-R and service water piping design and insulationCALVIN TRANenergy_progress
02/05/2026HVAC-R and service water heating equipmentCALVIN TRANenergy_progress
02/05/2026Sprinkler SystemsSIMON JIANGspecial
12/04/2025Fenestration air leakageTHOMAS TUNGenergy_progress
12/04/2025Permanent certificateTHOMAS TUNGenergy_progress
12/04/2025Lighting controlsTHOMAS TUNGenergy_progress
12/04/2025MeteringTHOMAS TUNGenergy_progress
12/04/2025Fenestration areasTHOMAS TUNGenergy_progress
Latest 25 of 38.
▾Documents — 73 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/21/2026B01251805-I1Request digital key ↗
08/17/2026B01289502-P1Request digital key ↗
08/17/2026B01289502-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits7
▸DOB NOWLPC Approval/Permit7
08/17/2026B01253310-S2Open ↗
08/15/2026B01253310-S5Open ↗
08/13/2026B01253310-P2Open ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B01253310-P1Open ↗
08/13/2026B01253310-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B01253310-P1Open ↗
08/13/2026B01253310-I1Open ↗
▸Seals & Professional Certifications35
▸DOB NOWProgress Inspector Seal & Signature18
09/27/2026B01253310-P2Open ↗
09/27/2026B01253310-P2Open ↗
08/29/2026B01253310-P1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/17/2026B01289502-P1Open ↗
08/17/2026B01289502-I1Open ↗
08/17/2026B01362744-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026B01253310-P3Open ↗
08/29/2026B01253310-S3Open ↗
08/29/2026B01253310-P1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/15/2026B01253310-I1Open ↗
08/15/2026B01253310-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01253310-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/17/2026B01253310-S2Open ↗
08/17/2026B01253310-S3Open ↗
08/17/2026B01253310-S1Open ↗
Showing 3 of 9 on file for this type
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/15/2026B01253310-I1Open ↗
08/15/2026B01253310-P1Open ↗