← Back
BuildNYC
Over six families without stores
297 TROUTMAN STREET
BROOKLYN · BIN 3072380
💬 Discuss this project
1959Year Built
4Stories
C1Building Class
R6Zoning
6,500 sfGross Floor Area
8Units
Rent Stabilized3 Active Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: CCM Ventures 6 · 2,500 sf lot · 2.6 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Unit 1L2p · 1 filing · 7 docs
Cellar3p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CCM Ventured 6503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Jinwoo Jang Architect207/30/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Nexus Consulting NYC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CCM Ventures HoldingGeneral Contractor103/21/2026
Prestige Builders GroupGeneral Contractor107/08/2026
DNA Plumbing ContractingPlumbing108/27/2015
Maximum PlumbingPlumbing106/13/2008
XR GroupGeneral Contractor212/22/2015
Building Lifecycle
08/26/2024
Signed off — Alteration
Application filed to have plans with application number uploaded. No new proposed work or revisions to the plans.
B00983916-I1
08/23/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/06/2024
Objection raised — Other
08/06/2024
Objection resolved — Addressed
07/30/2024
Filed — Alteration
Application filed to have plans with application number uploaded. No new proposed work or revisions to the plans.
B00983916-S2
58 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offPrestige Builders Group03/19/2024
BISMHISSUEDXR Group12/22/2015
BISPLISSUEDDNA Plumbing Contractors08/27/2015
BISOTISSUEDXR Group08/19/2015
BISPLISSUEDDual Fuel Plumbing & Heating06/13/2008
BISOTISSUEDCCM Ventures Holding03/27/2008
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/23/2024Pass-Final General Construction Non-Directive 14PassView ↗
04/10/2024Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
01/01/2024Fire-Resistance Rated ConstructionJin Woo Jangprogress
27 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account