← Back
BuildNYC
Two stories - detached, small or mid-size
297 WOODS OF ARDEN ROAD
STATEN ISLAND · BIN 5069549
💬 Discuss this project
1952Year Built
1.67Stories
A1Building Class
R1-2Zoning
1,541 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · Owner of record: Worlwide Entities · 13,700 sf lot · 0.11 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 21 filing
Floor 11 filing
Cellar1 filing
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rogers Calvanico Group211/05/2026
Building Lifecycle
11/05/2026
Filed — Alteration
ALT FILING TO ESTABLISH RECORD DRAWINGS FOR EXISTING ONE FAMILY HOUSE. OWENR IS SEEKING LNO FOR GROUP FAMILY DAYCARE ON FIRST FLR ONLY. NO CHANGE OF OCCUPANCY, LEGALIZATION OF EXTERIOR RAMP, ENLARGED COVERED PORCH, RELOCATE DOOR/PARTITION CHANGES.
S01476978-S1
10/28/2026
Filed — Alteration
ALT FILING TO ESTABLISH RECORD DRAWINGS FOR EXISTING ONE FAMILY HOUSE. OWENR IS SEEKING LNO FOR GROUP FAMILY DAYCARE ON FIRST FLR ONLY. NO CHANGE OF OCCUPANCY, LEGALIZATION OF EXTERIOR RAMP, ENLARGED COVERED PORCH, RELOCATE DOOR/PARTITION CHANGES.
S01476978-I1
10/21/2026
Special inspection requirement — Air barrier - visual inspection
10/21/2026
Special inspection requirement — Energy Code Compliance Inspections
10/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
10 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 11/05/2026
FiledStatusContractorScope
11/05/2026———
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
10/21/2026Air barrier - visual inspection—energy_progress
10/21/2026Energy Code Compliance Inspections—progress
10/21/2026HVAC-R and service water piping design and insulation—energy_progress
10/21/2026Fenestration air leakage—energy_progress
10/21/2026Fenestration and door U-factor and product ratings—energy_progress
10/20/2026Final—progress
10/20/2026Footing and Foundation—progress
10/20/2026Subgrade Inspections—special
3 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account