LL97 Covered11 Open Violations 1 unresolved · 10 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 102,900 sf lot · 1.28 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction17p · 1 filing · 20 docs
Floor 3Under Construction15p · 1 filing · 20 docs
Floor 2
Floor 1Under Construction17p · 3 filings · 20 docs
Basement1p · 1 filing · 3 docs
Sub-BasementUnder Construction4p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY2907/08/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DEPARTMENT OF EDUCATION903/22/2026
DEPT OF EDUCATION I.S. 141103/22/2026
DOE IS 141203/22/2026
DOE PS 14 040403/22/2026
DOE IS 14 040303/22/2026
DEPT. OF EDUCATION 0203/22/2026
DOE K 14 040203/22/2026
BOARD OF EDUCATION 0103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES803/21/2026
RA803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YARKS NYC INCGeneral Contractor1407/08/2026
FRANCIS RICHARDSElectrical203/21/2026
CAPITAL PROJECTS INCGeneral Contractor207/08/2026
CEDOMIR MARAElectrical103/21/2026
CLEAN TECH MECHANICAL INCPlumbing106/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.317408/18/2026
JPC LOGISTICS DBA JPCL EN351307/07/2025
Building Lifecycle
All (99)Filed (13)Permit Issued (11)Violation (60)Inspection (1)Objection (4)Special Inspection (10)
08/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MIKHAIL ZEYGMAN
08/24/2026
Special inspection requirement — Concrete - Cast-In-Place
MIKHAIL ZEYGMAN
08/24/2026
Special inspection requirement — Masonry
MIKHAIL ZEYGMAN
08/18/2026
Filed — Alteration
Replace (1) Existing Area Drain Replace 5 LFT of 3" underground piping connected to drain to be replaced. Power-wash 20 LFT of storm piping, trench and backfill for the replacement of drain/associated piping. Demolish/replace concrete slab on grade.
B01020826-P3
05/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/07/2026
Permit issued — General Construction
B01020826-I1-GC
03/24/2026
Violation issued (FDNY_ORDER, closed)
03/24/2026
Violation issued (FDNY_ORDER, closed)
03/24/2026
Violation issued (FDNY_ORDER, closed)
03/24/2026
Violation issued (FDNY_ORDER, closed)
03/24/2026
Violation issued (FDNY_ORDER, closed)
03/24/2026
Violation issued (FDNY_ORDER, closed)
03/24/2026
Violation issued (FDNY_ORDER, closed)
03/24/2026
Violation issued (FDNY_ORDER, closed)
03/24/2026
Violation issued (FDNY_ORDER, closed)
03/24/2026
Violation issued (FDNY_ORDER, closed)
03/24/2026
Violation issued (FDNY_ORDER, closed)
03/24/2026
Violation issued (FDNY_ORDER, closed)
03/17/2026
Violation issued (ECB, open)
Construction
02/25/2026
Permit issued — Sidewalk Shed
B01136942-I1-SH
02/02/2026
Permit issued — Plumbing
B01020826-S1-PL
01/30/2026
Permit issued — Sidewalk Shed
B01136942-I1-SH
01/29/2026
Permit issued — Construction Fence
B01136933-I1-FN
01/29/2026
Permit issued — Supported Scaffold
B01136948-I1-SF
08/01/2025
Violation issued (FDNY_ORDER, closed)
07/07/2025
Filed — Alteration
B01249398-I1
05/01/2025
Violation issued (ECB, open)
Construction
04/28/2025
Permit issued — General Construction
B01020826-I1-GC
04/17/2025
Filed — Alteration
Replace (1) Existing Area Drain Replace 5 LFT of 3" underground piping connected to drain to be replaced. Power-wash 20 LFT of storm piping, trench and backfill for the replacement of drain/associated piping. Demolish/replace concrete slab on grade.
B01020826-P1
04/17/2025
Filed — Alteration
Replace (1) Existing Area Drain Replace 5 LFT of 3" underground piping connected to drain to be replaced. Power-wash 20 LFT of storm piping, trench and backfill for the replacement of drain/associated piping. Demolish/replace concrete slab on grade.
B01020826-P2
04/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MIKHAIL ZEYGMAN
04/17/2025
Special inspection requirement — Concrete - Cast-In-Place
MIKHAIL ZEYGMAN
04/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
04/17/2025
Special inspection requirement — Masonry
MIKHAIL ZEYGMAN
03/11/2025
Permit issued — Protection and Mechanical Methods
B01150362-I1-PMM
02/19/2025
Filed — Alteration
B01150362-I1
01/27/2025
Permit issued — Supported Scaffold
B01136948-I1-SF
01/22/2025
Permit issued — Sidewalk Shed
B01136942-I1-SH
01/22/2025
Permit issued — Construction Fence
B01136933-I1-FN
11/13/2024
Filed — Alteration
B01136933-I1
11/13/2024
Filed — Alteration
B01136942-I1
11/13/2024
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD FOR IS 14K AT 2424 BATCHELDER STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01136948-I1
09/20/2024
Violation issued (FDNY_ORDER, closed)
08/29/2024
Violation issued (ECB, open)
Boilers
08/29/2024
Violation issued (ECB, open)
Boilers
08/29/2024
Violation issued (ECB, open)
Boilers
07/22/2024
Violation issued (FDNY_NOV, closed)
07/01/2024
Violation issued (ECB, open)
Construction
07/01/2024
Violation issued (ECB, closed)
Construction
04/29/2024
Objection resolved — Addressed
03/22/2024
Objection raised — Other
03/18/2024
Filed — Alteration
Replace (1) Existing Area Drain Replace 5 LFT of 3" underground piping connected to drain to be replaced. Power-wash 20 LFT of storm piping, trench and backfill for the replacement of drain/associated piping. Demolish/replace concrete slab on grade.
B01020826-I1
03/18/2024
Filed — Alteration
Replace (1) Existing Area Drain Replace 5 LFT of 3" underground piping connected to drain to be replaced. Power-wash 20 LFT of storm piping, trench and backfill for the replacement of drain/associated piping. Demolish/replace concrete slab on grade.
B01020826-S1
01/22/2024
Violation issued (FDNY_NOV, closed)
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/21/2023
Violation issued (ECB, open)
Construction
12/12/2022
Violation issued (FDNY_NOV, closed)
10/03/2022
Violation issued (FDNY_ORDER, closed)
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCAPITAL PROJECTS INC05/07/2026
DOB NOWSidewalk ShedPermit IssuedYARKS NYC INC02/25/2026
DOB NOWPlumbingPermit IssuedCLEAN TECH MECHANICAL INC02/02/2026
DOB NOWSidewalk ShedPermit IssuedYARKS NYC INC01/30/2026
DOB NOWConstruction FencePermit IssuedYARKS NYC INC01/29/2026
DOB NOWSupported ScaffoldPermit IssuedYARKS NYC INC01/29/2026
DOB NOWGeneral ConstructionPermit IssuedCAPITAL PROJECTS04/28/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedYARKS NYC INC03/11/2025
DOB NOWSupported ScaffoldPermit IssuedYARKS NYC INC01/27/2025
DOB NOWSidewalk ShedPermit IssuedYARKS NYC INC01/22/2025
DOB NOWConstruction FencePermit IssuedYARKS NYC INC01/22/2025
BISPLISSUEDLEVIATHAN MECHANICAL CORP07/28/2025
BISSPISSUEDLEVIATHAN MECHANICAL CORP07/28/2025
BISBLISSUEDLEVIATHAN MECHANICAL CORP07/28/2025
BISPLISSUEDLEVIATHAN MECHANICAL CORP07/28/2025
BISSPISSUEDLEVIATHAN MECHANICAL CORP03/16/2022
BISBLISSUEDLEVIATHAN MECHANICAL CORP03/16/2022
BISPLISSUEDLEVIATHAN MECHANICAL CORP03/16/2022
BISPLISSUEDLEVIATHAN MECHANICAL CORP03/16/2022
BISBLISSUEDLEVIATHAN MECHANICAL CORP10/16/2020
BISPLISSUEDLEVIATHAN MECHANICAL CORP10/16/2020
BISPLISSUEDLEVIATHAN MECHANICAL CORP10/16/2020
BISOTISSUEDLEVIATHAN MECHANICAL CORP10/15/2020
BISOTISSUEDLEVIATHAN MECHANICAL CORP10/15/2020
BISOTISSUEDLEVIATHAN MECHANICAL CORP10/15/2020
BISMHISSUEDLO SARDO GENERAL CONTRACTORS10/15/2020
BISFPISSUEDCHIEF FIRE PREV.& MECH CO12/03/2019
BISSPISSUEDLEVIATHAN MECHANICAL CORP11/13/2019
BISPLISSUEDLEVIATHAN MECHANICAL CORP11/13/2019
BISOTISSUEDLEVIATHAN MECHANICAL CORP09/19/2019
BISOTISSUEDLEVIATHAN MECHANICAL CORP09/19/2019
BISOTISSUEDLEVIATHAN MECHANICAL CORP09/19/2019
BISMHISSUEDLEVIATHAN MECHANICAL CORP09/19/2019
BISPLISSUEDLEVIATHAN MECHANICAL CORP09/13/2019
BISEQISSUEDLEVIATHAN MECHANICAL CORP10/22/2018
BISBLRE-ISSUEDLEVIATHAN MECHANICAL CORP09/21/2018
BISOTISSUEDLEVIATHAN MECHANICAL CORP09/21/2018
BISOTISSUEDLEVIATHAN MECHANICAL CORP09/21/2018
BISMHISSUEDLEVIATHAN MECHANICAL CORP09/21/2018
BISOTISSUEDLEVIATHAN MECHANICAL CORP09/21/2018
+ 21 more permits on file
1 project · most recent 08/18/2026
Storm
FiledStatusContractorScope
08/18/2026Permit IssuedCLEAN TECH MECHANICAL INCStorm
12 projects · most recent 06/12/2026
General Wiring
FiledStatusContractorScope
06/12/2026Permit IssuedA & S ELECTRIC INC.General Wiring
06/25/2025CompleteEVEREST ELECTRIC CORP—
03/20/2025Permit IssuedPACIFIC ELEC'L CONTR'G IN—
01/09/2025Permit IssuedLIT MODE ELECL CONTG INC—
05/09/2024CompleteTITAN ELEC'L & ELEV CONTR—
09/26/2023Permit IssuedACE ELEC'L CONSTRUCTIONGeneral Wiring
06/03/2022CompleteABM ELECTRIC, INC—
10/27/2020CompleteHEXAGON CONST & ELECL GRPGeneral Wiring
10/28/2019CompleteCHARAN ELEC'L ENTERP'S IN—
07/09/2018CompleteCHARAN ELEC'L ENTERP'S IN—
05/10/2018CompleteCHARAN ELEC'L ENTERP'S IN—
01/23/2018CompleteCHARAN ELEC'L ENTERP'S IN—
1 project · most recent 11/18/2021
Concrete
FiledStatusContractorScope
11/18/2021——Concrete
1 project · most recent 11/13/2024
Scaffold
FiledStatusContractorScope
11/13/2024Permit IssuedYARKS NYC INCScaffold
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
08/24/2026Structural Stability – Alterations of existing buildingsMIKHAIL ZEYGMANspecial
08/24/2026Concrete - Cast-In-PlaceMIKHAIL ZEYGMANspecial
08/24/2026MasonryMIKHAIL ZEYGMANspecial
04/17/2025Structural Stability – Alterations of existing buildingsMIKHAIL ZEYGMANspecial
04/17/2025Concrete - Cast-In-PlaceMIKHAIL ZEYGMANspecial
04/17/2025Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
04/17/2025MasonryMIKHAIL ZEYGMANspecial
12/21/2021Post-installed AnchorsAsma Hashmispecial
11/12/2021Concrete - Cast-In-PlaceAsma Hashmispecial
11/11/2021Final—progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Shellbank Intermediate SchoolEducation—
Project B00542378 Alteration · Approved · 06/18/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 87 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch14
09/01/2026B00542378-I1Request digital key ↗
08/25/2026B01020826-P3Request digital key ↗
08/25/2026B01020826-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/29/2026B00778927-I1Request digital key ↗
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/01/2026B00542378-I1Open ↗
08/29/2026B00778927-I1Open ↗
08/25/2026B01020826-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026B01020826-I1Open ↗
09/02/2026B01020826-I1Open ↗
09/02/2026B01020826-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/29/2026B00629794-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWNYCSCA - Approved Site Safety Plans3
08/13/2026B01136933-I1Open ↗
08/13/2026B01136942-I1Open ↗
08/13/2026B01136948-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/21/2026B01020826-S1Open ↗
08/21/2026B01020826-I1Open ↗
08/21/2026B01020826-P2Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs26
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
09/01/2026B00542378-I1Open ↗
08/29/2026B00778927-I1Open ↗
08/22/2026B01150362-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)11
08/20/2026B01020826-P3Open ↗
08/13/2026B00542378-I1Open ↗
08/13/2026B00629794-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026B01020826-S1Open ↗
08/13/2026B01020826-I1Open ↗
▸Other Documents14
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal14
08/25/2026B01020826-P3Open ↗
08/25/2026B01020826-I1Open ↗
08/20/2026B01020826-P3Open ↗
Showing 3 of 14 on file for this type