← Back
Playground
Old Stone House of Brooklyn
298 3 STREET · BIN 3021055
💬 Discuss this project
1934Year Built
2Stories
Q2Building Class
PARKZoning
2,714 sfGross Floor Area
0Units
6 Open Violations ▸FDNY Report ↗
Playground · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 132,221 sf lot · 0.02 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Roof2p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
1 job · most recent 01/21/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/21/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
1 job · most recent 01/21/2026
Sprinkler System
FiledStatusContractorScope
01/21/2026——Sprinkler System
1 job · most recent 01/21/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/21/2026——Gas, Water/Sanitary
4 jobs · most recent 10/17/2025
General Wiring
FiledStatusContractorScope
10/17/2025CompleteETRICITY ELECTRICAL CO IN—
09/21/2024CompleteETRICITY ELECTRICAL CO IN—
11/04/2023CompleteETRICITY ELECTRICAL CO IN—
01/16/2019CompleteMONTGOMERY ELEC'L CONTR'GGeneral Wiring
1 job · most recent 01/21/2026
Steel Concrete Masonry Wood
FiledStatusContractorScope
01/21/2026——Steel, Concrete, Masonry, Wood
Building Lifecycle
All (148)Filed (7)Violation (32)Objection (79)Special Inspection (30)
09/17/2026
Objection resolved — Resolved
09/16/2026
Objection raised — Energy
09/08/2026
Objection resolved — Addressed
08/28/2026
Objection raised — Scope
08/21/2026
Objection resolved — Addressed
07/21/2026
Objection raised — Scope
04/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/18/2026
Objection resolved — Addressed
02/11/2026
Objection raised — Cost
02/09/2026
Objection resolved — Addressed
02/06/2026
Objection resolved — Addressed
02/06/2026
Objection resolved — Addressed
01/29/2026
Objection raised — Admin
01/21/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Removal of equipment such as radiators, AC units, Condensing units, and associated valves/piping. New installation of 8 indoor AC units, 4 new condensing units, associated piping, heaters and exhaust fans. All as per plans filed herewith.
B01171440-S6
01/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
01/06/2026
Objection resolved — Addressed
12/30/2025
Objection resolved — Addressed
12/03/2025
Objection resolved — Addressed
12/03/2025
Objection resolved — Addressed
12/03/2025
Objection resolved — Addressed
12/03/2025
Objection resolved — Addressed
12/03/2025
Objection resolved — Addressed
12/03/2025
Objection resolved — Addressed
12/02/2025
Objection resolved — Addressed
12/02/2025
Objection resolved — Addressed
12/02/2025
Objection resolved — Addressed
12/02/2025
Objection resolved — Addressed
10/17/2025
Objection raised — Structural
10/15/2025
Special inspection requirement — Post-installed Anchors
10/15/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
10/10/2025
Objection resolved — Addressed
10/02/2025
Objection resolved — Addressed
10/02/2025
Objection resolved — Addressed
10/02/2025
Objection resolved — Addressed
10/02/2025
Objection resolved — Addressed
10/02/2025
Objection resolved — Addressed
10/02/2025
Objection resolved — Addressed
10/02/2025
Objection resolved — Addressed
10/02/2025
Objection resolved — Addressed
10/02/2025
Objection resolved — Addressed
10/02/2025
Objection resolved — Addressed
10/02/2025
Objection resolved — Addressed
10/02/2025
Objection resolved — Addressed
10/02/2025
Objection resolved — Addressed
10/02/2025
Objection resolved — Addressed
10/02/2025
Objection resolved — Addressed
10/02/2025
Objection resolved — Addressed
10/02/2025
Special inspection requirement — Wood – High-Load Diaphragms
10/01/2025
Objection resolved — Addressed
10/01/2025
Objection resolved — Addressed
10/01/2025
Objection resolved — Addressed
08/21/2025
Objection raised — Plumbing
08/21/2025
Objection raised — Structural
08/21/2025
Objection raised — Structural
08/21/2025
Objection raised — Structural
08/21/2025
Objection raised — Plumbing
08/21/2025
Objection raised — Admin
08/21/2025
Objection raised — Structural
08/21/2025
Objection raised — Admin
Latest 60 of 148 events.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LIRO ENGINEERS, INC.301/21/2026
THE LIRO GROUP308/07/2025
NYC PARKS DEPT103/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV ASSOCIATES1203/21/2026
NYC DEPT OF PARKS RECREATION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALAN RIBACKElectrical103/21/2026
ETRICITY ELECTRICAL CO INElectrical103/22/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDEVERYTHING ENTERTAINMENT07/07/2014
BIS—ISSUEDLAPIETRA CONTRACTING CORP04/17/1996
BISEQRE-ISSUEDLAPIETRA CONTRACTING CORP04/17/1996
BIS—ISSUEDLAPIETRA CONTRACTING CORP02/15/1996
BIS—ISSUEDLAPIETRA CONTRACTING CORP02/06/1996
BISEQISSUEDLAPIETRA CONTRACTING CORP02/06/1996
BISPLISSUEDB.G. NATIONAL PLUMB & HEAT INC.06/01/1995
BISEQISSUEDLAPIETRA CONTRACTING CORP10/20/1994
BIS—ISSUEDLAPIETRA CONTRACTING CORP10/20/1994
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
04/17/2026Structural Stability – Alterations of existing buildings—special
04/14/2026Structural Stability – Alterations of existing buildings—special
01/19/2026Structural Stability – Alterations of existing buildings—special
10/15/2025Post-installed Anchors—special
10/15/2025Excavations - Sheeting, Shoring, and Bracing—special
10/02/2025Wood – High-Load Diaphragms—special
07/31/2025HVAC-R and service water piping design and insulation—energy_progress
07/31/2025HVAC-R and service water heating system controls—energy_progress
07/31/2025Fire-Resistant Penetrations and Joints—special
07/31/2025Maintenance information—energy_progress
07/31/2025HVAC-R and service water heating equipment—energy_progress
07/30/2025Maintenance information—energy_progress
03/18/2025Structural Steel - Welding—special
03/18/2025Structural Steel - High Strength Bolting—special
03/18/2025Structural Wood Frame—progress
02/10/2025Fenestration areas—energy_progress
02/10/2025Protection of exposed foundation insulation—energy_progress
02/10/2025Fenestration air leakage—energy_progress
02/10/2025Insulation placement and R values—energy_progress
02/10/2025Fire-Resistant Penetrations and Joints—special
02/10/2025Air barrier - visual inspection—energy_progress
02/10/2025Fenestration and door U-factor and product ratings—energy_progress
02/10/2025Fire-Resistance Rated Construction—progress
02/10/2025Energy Code Compliance Inspections—progress
01/31/2025Structural Steel - Details—special
Latest 25 of 40.
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/15/2026B01171440-S3Request digital key ↗
08/15/2026B01171440-S1Request digital key ↗
08/15/2026B01171440-S2Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
10/27/2020321053186Open ↗
07/08/2014321053186Open ↗
▸BISWORK PERMIT APPLICATION1
07/21/2014321053186Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01171440-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026B01171440-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026B01171440-S1Open ↗
08/21/2026B01171440-I1Open ↗
08/21/2026B01171440-S6Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION1
07/08/2014321053186Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/14/2026B01171440-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/15/2026B01171440-S3Open ↗
08/15/2026B01171440-S1Open ↗
08/15/2026B01171440-S2Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs14
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/13/2026B01171440-I1Open ↗
08/13/2026B01171440-S2Open ↗
08/13/2026B01171440-S6Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)7
08/13/2026B01171440-S5Open ↗
08/13/2026B01171440-I1Open ↗
08/13/2026B01171440-S1Open ↗
Showing 3 of 7 on file for this type
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
07/08/2014321053186Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
07/08/2014321053186Open ↗
▸Other Documents2
▸DOB NOWSite Survey: Initial1
08/13/2026B01171440-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/14/2026B01171440-I1Open ↗