Office with commercial, 7-19 stories
298 5 AVENUE
MANHATTAN · BIN 1015791
💬 Discuss this project
1913Year Built
7Stories
O6Building Class
C5-2Zoning
24,192 sfGross Floor Area
8Units
0 Open ViolationsFISP: SAFE
Office with commercial, 7-19 stories · Owner of record: 298 FIFTH AVE CORP · 4,100 sf lot · 5.9 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Roof15p · 1 filing · 16 docs
Floor 717p · 1 filing · 16 docs
Floor 614p · 1 filing · 16 docs
Floor 514p · 1 filing · 16 docs
Floor 414p · 1 filing · 16 docs
Floor 327p · 2 filings · 20 docs
Floor 232p · 4 filings · 20 docs
Floor 138p · 4 filings · 20 docs
Cellar34p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HRC7307/08/2026
SOHO CONTRACTING CORP1103/22/2026
298 FIFTH AVE CORP203/22/2026
298 5 AVE303/22/2026
REZA CONTRACTORS INC103/22/2026
OWNER OF 2 WEST 31 STR103/22/2026
OWNER OF 298 5 AVENUE103/22/2026
J & N CONSTRUCTION GROUP103/21/2026
156 FIFTH AVENUE203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
H ARCHITECTURE1012/12/2025
YOUN DESIGN CORP.211/23/2024
DAVID TURNER ARCHITECT PC406/02/2023
ASIF JAMIL, RA304/18/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MJ EXPEDITNG SERVICE2003/21/2026
MUNICIPAL BUILDING CONSULTANTS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JW CONTRACTOR INCGeneral Contractor603/21/2026
SOHO CONTRACTING CORPGeneral Contractor403/21/2026
CK PLUMBING & MECH INCPlumbing307/08/2026
DAVID TURNER ARCHITECT,PCGeneral Contractor203/21/2026
CARDONE CONCRETE INCGeneral Contractor203/21/2026
IRVING BAPTISTEElectrical103/21/2026
AVON PLBG & HTG INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SEAD ENGINEERING PC2665506/25/2024
DAVID TURNER ARCHITECT PC3829203/03/2023
Building Lifecycle
All (130)Filed (19)Permit Issued (10)Signed Off (3)Facade (FISP) (12)Violation (38)Inspection (4)Objection (14)Special Inspection (30)
12/18/2025
Objection raised — Scope
12/18/2025
Objection resolved — Addressed
12/18/2025
Special inspection requirement — Interior lighting power
12/18/2025
Special inspection requirement — Energy Code Compliance Inspections
12/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
12/18/2025
Special inspection requirement — Lighting controls
12/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
12/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/18/2025
Special inspection requirement — Maintenance information
12/12/2025
Filed — Alteration CO
HEREWITH FILE TO AMEND CERTIFICATE OF OCCUPANCY TO CONVERT FIRST AND SECOND FLOOR TO EATING AND DRINKIRING (A2) ESTABLISHMENT.
M00897413-P2
09/22/2025
Special inspection requirement — Interior lighting power
09/22/2025
Special inspection requirement — Lighting controls
09/22/2025
Special inspection requirement — Maintenance information
09/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
09/22/2025
Special inspection requirement — Energy Code Compliance Inspections
09/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/31/2025
Special inspection requirement — Public Assembly Emergency Lighting
JAEJUN RYU
07/21/2025
Filed — No Work
M01101740-P1
07/21/2025
Filed — Alteration CO
HEREWITH FILE TO AMEND CERTIFICATE OF OCCUPANCY TO CONVERT FIRST AND SECOND FLOOR TO EATING AND DRINKIRING (A2) ESTABLISHMENT.
M00897413-P1
06/13/2025
Special inspection requirement — Public Assembly Emergency Lighting
JAEJUN RYU
02/11/2025
Objection resolved — Addressed
01/28/2025
Objection raised — Energy
01/14/2025
Objection resolved — Addressed
12/13/2024
Objection raised — Scope
12/02/2024
Objection resolved — Addressed
12/02/2024
Objection resolved — Addressed
12/02/2024
Objection resolved — Addressed
12/02/2024
Objection resolved — Addressed
11/23/2024
Filed — Alteration
INSTALLATION OF A NON-ILLUMINATED BUSINESS ACCESSORY SIGN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01132222-I1
10/24/2024
Filed — No Work
M01101740-I1
08/11/2024
Filed — Alteration
M01078524-I1
06/26/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
INHWAN CHANG
06/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
06/26/2024
Special inspection requirement — Energy Code Compliance Inspections
JAEJUN RYU
06/26/2024
Special inspection requirement — Final
JAEJUN RYU
06/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
06/26/2024
Special inspection requirement — Maintenance information
JAEJUN RYU
06/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
JAEJUN RYU
06/26/2024
Special inspection requirement — Lighting controls
JAEJUN RYU
06/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
JAEJUN RYU
06/26/2024
Special inspection requirement — Interior lighting power
JAEJUN RYU
06/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
06/26/2024
Special inspection requirement — Energy Code Compliance Inspections
JAEJUN RYU
06/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
JAEJUN RYU
06/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
JAEJUN RYU
06/25/2024
Filed — Alteration
HEREWITH FILE PLANS FOR INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE. NEW PLUMBING FIXTURES FOR CELLAR TO 3RD FLOOR AND MODIFY/NEW SPRINKLER HEADS FOR CELLAR, 001 &002 FLOORS ONLY. INTERIOR WORK FILE SEPARATELY. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00824148-P2
06/25/2024
Filed — Alteration
HEREWITH FILE PLANS FOR INTERIOR RENOVATION OF AN EXISTING COMMERCIAL STORE. NEW RESTAURANT TO BE ESTABLISHED. NON-LOAD BEARING PARTITIONS, NEW FINISHES, NEW MECH HVAC AND DUCT WORK ASSOCIATED WITH NEW RESTAURANT. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00825355-P1
05/09/2024
Permit issued — Plumbing
M00824148-I1-PL
12/21/2023
Permit issued — General Construction
M00825355-I1-GC-CX
12/19/2023
Permit issued — Sprinklers
M00824148-I1-PL
11/16/2023
Permit issued — Plumbing
M00824148-I1-EW-SP
10/25/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/25/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/16/2023
Filed — Alteration
HEREWITH FILE PLANS FOR INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE. NEW PLUMBING FIXTURES FOR CELLAR TO 3RD FLOOR AND MODIFY/NEW SPRINKLER HEADS FOR CELLAR, 001 &002 FLOORS ONLY. INTERIOR WORK FILE SEPARATELY. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00824148-P1
08/21/2023
Signed off — Alteration
New Handicap Access Ramp
M00849378-I1
08/18/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/26/2023
Objection raised — Admin
07/26/2023
Objection raised — Fire_Protection
07/26/2023
Objection raised — Structural
Latest 60 of 130 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCK PLUMBING & MECH INC05/09/2024
DOB NOWGeneral ConstructionPermit IssuedJW CONTRACTOR INC12/21/2023
DOB NOWSprinklersPermit IssuedCK PLUMBING & MECH INC12/19/2023
DOB NOWPlumbingPermit IssuedAVON PLBG & HTG INC11/16/2023
DOB NOWGeneral ConstructionSigned-offCARDONE CONCRETE INC04/25/2023
DOB NOWGeneral ConstructionPermit IssuedJW CONTRACTOR INC03/29/2023
DOB NOWSprinklersPermit IssuedCK PLUMBING & MECH INC03/03/2023
DOB NOWMechanical SystemsSigned-offDAVID TURNER ARCHITECT,PC02/28/2023
DOB NOWSidewalk ShedSigned-offSOHO CONTRACTING CORP06/24/2019
DOB NOWSidewalk ShedSigned-offSOHO CONTRACTING CORP11/21/2018
BISOTISSUEDUNIQUE IRON WORKS07/02/2021
BISOTISSUEDSOHO CONTRACTING CORP06/27/2019
BISOTISSUEDSOHO CONTRACTING CORP02/06/2019
BISSPISSUEDPETER PLUMBING ASSOC. INC.06/17/2016
BISPLISSUEDPETER PLUMBING ASSOC. INC.06/17/2016
BISMHISSUEDTRI STATE CONSTRUCTION OF06/14/2016
BISOTISSUEDTRI STATE CONSTRUCTION OF06/10/2016
BISOTISSUEDTRI STATE CONSTRUCTION OF06/10/2016
BISEQISSUEDJ & N CONSTRUCTION GROUP05/29/2012
BISOTISSUEDJ & N CONSTRUCTION GROUP05/29/2012
BISOTISSUEDWONDER WORKS CONSTR CORP02/23/2006
BISOTISSUEDWONDER WORKS CONSTR CORP02/15/2006
BISEQISSUEDOUTDOOR INSTALL. LLC09/23/2005
BISEQISSUEDROCKLEDGE SCAFFOLD CORP11/08/2002
BISEQISSUEDA.G. GUSTOM CONST. INC04/25/2001
BISOTISSUEDA.G. CUSTOM CONSTRUCTION INC02/20/2001
BISOTISSUEDA.G. CUSTOM CONST. INC.10/20/2000
BISOTISSUEDPLANNED MANAGEMENT CONSTRUCTION05/18/1999
BISOTISSUED526 3RD AVENUE REALTY CORP.10/23/1998
BISFBISSUEDDUAL FUEL PLBG & HTG06/29/1998
BISMHISSUEDHRC CORP04/11/1997
BISEQISSUEDSPRING INTERPRISES,INC.07/19/1996
BISEQISSUEDUSA GENERAL CONSTRUCTION03/28/1996
BISOTISSUEDUSA GENERAL CONSTRUCTION03/28/1996
BISOTISSUEDNAGEL ROOFING INC07/20/1995
1 project · most recent 06/25/2024
Associated Ducts and Piping Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/25/2024Permit IssuedJW CONTRACTOR INCAssociated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MLZ-KP09NA 9,000 BTU · Ahu ×8
MXZ-SM48NAMHZ 48,000 BTU · Condensing Unit ×2
Johnson Controls TIAH060B22M 60,000 BTU · Ahu ×2
TVAHP060B21S 60,000 BTU · Condensing Unit ×2
Russell RLH215L44 14,130 BTU · Condensing Unit ×2
Tecumseh AWAR2512ZXNKM 11,000 BTU · Condensing Unit ×2
Ventilation
Panasonic FV-0510VS1 100 CFM · Exhaust Fan ×6
Ducts & Piping
Naks 85B3-6000-FF 6,000 CFM · Exhaust Fan ×2
1 project · most recent 06/25/2024
FiledStatusContractorScope
06/25/2024Permit IssuedAVON PLBG & HTG INC104 heads
1 project · most recent 06/25/2024
Water/Sanitary
FiledStatusContractorScope
06/25/2024Permit IssuedCK PLUMBING & MECH INCWater/Sanitary
3 projects · most recent 02/23/2023
General Wiring Lighting
FiledStatusContractorScope
02/23/2023Permit IssuedY.S ELECTRICGeneral Wiring, Lighting
06/02/2022CompleteJAS ELEC'L SERVICES, INCGeneral Wiring
11/18/2018CompletePALANT ELEC'L CONTR'G COR—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/25/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/25/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/18/2023Pass-Final General Construction Non-Directive 14PassView ↗
05/26/2023Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
12/18/2025Interior lighting power—energy_progress
12/18/2025Energy Code Compliance Inspections—progress
12/18/2025Structural Stability – Alterations of existing buildings—special
12/18/2025Lighting controls—energy_progress
12/18/2025Fire-Resistance Rated Construction—progress
12/18/2025Fire-Resistant Penetrations and Joints—special
12/18/2025Maintenance information—energy_progress
09/22/2025Interior lighting power—energy_progress
09/22/2025Lighting controls—energy_progress
09/22/2025Maintenance information—energy_progress
09/22/2025Fire-Resistance Rated Construction—progress
09/22/2025Energy Code Compliance Inspections—progress
09/22/2025Fire-Resistant Penetrations and Joints—special
09/22/2025Structural Stability – Alterations of existing buildings—special
07/31/2025Public Assembly Emergency LightingJAEJUN RYUprogress
06/13/2025Public Assembly Emergency LightingJAEJUN RYUprogress
06/26/2024Structural Stability – Alterations of existing buildingsINHWAN CHANGspecial
06/26/2024Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
06/26/2024Energy Code Compliance InspectionsJAEJUN RYUprogress
06/26/2024FinalJAEJUN RYUprogress
06/26/2024HVAC-R and service water piping design and insulation—energy_progress
06/26/2024Maintenance informationJAEJUN RYUenergy_progress
06/26/2024HVAC-R and service water heating equipmentJAEJUN RYUenergy_progress
06/26/2024Lighting controlsJAEJUN RYUenergy_progress
06/26/2024HVAC-R and service water heating system controlsJAEJUN RYUenergy_progress
Latest 25 of 57.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Robert ChickenRestaurant / Food ServiceCellar, Floors 1–3
Project M00897413 Alteration CO · Approved · 07/18/2023
Project M00824148 Alteration · Permit Entire · 02/08/2023
Project M00825355 Alteration · Permit Entire · 02/08/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 181 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch13
09/05/2026M00102394-I1Request digital key ↗
08/31/2026M00831679-I1Request digital key ↗
08/31/2026M00831679-P1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
08/22/2026M01101740-I1Request digital key ↗
08/22/2026M01101740-P2Request digital key ↗
08/22/2026M01101740-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/05/2026M00102394-I1Request digital key ↗
08/15/2026M00102394-P1Request digital key ↗
08/15/2026M00102394-P2Request digital key ↗
▸Applications & Permits24
▸BISPLAN / WORK APPROVAL APPLICATION14
11/18/2021123533701Open ↗
10/17/2018123533701Open ↗
09/18/2018123533701Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION10
07/06/2021123533701Open ↗
06/27/2019123533701Open ↗
02/06/2019123533701Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications69
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
09/18/2018123533701Open ↗
05/22/2017122763571Open ↗
05/22/2017122763571Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/05/2026M00102394-P2Open ↗
09/05/2026M00102394-I1Open ↗
09/05/2026M00102394-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/02/2026M00824148-P2Open ↗
09/02/2026M00824148-P2Open ↗
09/01/2026M00824148-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/02/2026M00824148-P2Open ↗
09/02/2026M00824148-P2Open ↗
09/01/2026M00824148-P1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
06/21/2016122734201Open ↗
06/07/2012121092361Open ↗
04/04/2012121028011Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
06/07/2012121092361Open ↗
04/04/2012121028011Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/21/2016122734201Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
09/30/2016122734201Open ↗
09/27/2016122734201Open ↗
09/20/2016122734201Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection2
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
10/17/2018123533701Open ↗
▸BISTenant Protection Plan and Notes1
09/18/2018123533701Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/13/2026M00825355-I1Open ↗
08/13/2026M00825355-P1Open ↗
08/13/2026M00824148-P3Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
09/18/2018123533701Open ↗
06/21/2016122734201Open ↗
04/20/2016122763571Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/04/2012121028011Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
09/18/2018123533701Open ↗
05/22/2017122763571Open ↗
03/30/2017122734201Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
12/10/2021123533701Open ↗
05/22/2017122763571Open ↗
03/30/2017122734201Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00831679-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/10/2021123533701Open ↗
▸Approvals, Objections & Sign-offs12
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
12/13/2021123533701Open ↗
05/22/2017122763571Open ↗
03/30/2017122734201Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
06/21/2016122734201Open ↗
06/07/2012121092361Open ↗
04/04/2012121028011Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/17/2012121092361Open ↗
▸BISSUPERSEDING LETTER1
07/06/2021123533701Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT12
12/10/2021123533701Open ↗
12/10/2021123533701Open ↗
09/18/2018123533701Open ↗
Showing 3 of 12 on file for this type
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION6
11/23/2021123533701Open ↗
10/17/2018123533701Open ↗
12/07/2016122763571Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET6
09/18/2018123533701Open ↗
06/21/2016122734201Open ↗
04/20/2016122763571Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM1
07/06/2021123533701Open ↗