← Back
BuildNYC
One family attached or semi-detached
298 ADAMS AVENUE
STATEN ISLAND · BIN 5091378
💬 Discuss this project
1989Year Built
2Stories
A5Building Class
R3-1Zoning
800 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
One family attached or semi-detached · 2,550 sf lot · 0.31 FAR built · Flood zone X500
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPhotovoltaic solar panel installation1p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering112/19/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sunrun103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sunrun Installation Servicespecialty_contractor203/21/2026
Sunrun Solar ElectlElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272112/19/2024
Building Lifecycle
04/23/2025
Signed off — Alteration
S01158288-I1
12/26/2024
Permit issued — Solar
S01158288-I1-SL
12/19/2024
Filed — Alteration
S01158288-I1
12/19/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
12/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
15 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunrun Installation Service12/26/2024
2 projects · most recent 12/19/2024
General Wiring
FiledStatusContractorScope
12/19/2024CompleteSunrun Solar Electl—
03/22/2024CompleteAMC Electrical ServicesGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
12/19/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
12/19/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
12/19/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
12/19/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Walid Abdullaspecial
12/19/2024Energy Code Compliance InspectionsWalid Abdullaprogress
12/19/2024FinalWalid Abdullaprogress
9 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account