ECB05/13/20081) FAILURE TO PROVIDE ADEQUATE PROTECTION FOR SIDEWALKS DURING CONSTRUCTION OPERATIONS: NOTE + 6 INNER POSTS ARE LEANING & OUT PLUMB. REMEDYPROVIDE ADEQUATE PROTECTION.$-1,057 due
ECB05/27/2008FAILURE TO POST CONTRACTORS SIGN. NO CONTRACTOR SIGN ON SHED AT TIME OF INSPECTOR. REMEDY: PROVIDE CONTRACTORS SIGN.Nothing owed — awaiting certificate of correction
ECB05/27/2008SIDEWALK SHED DOES NOT MET BLDG CODE SPECIFICATIONS NO SIDE DECK ENCLOSURE. REMEDY: CONFORM SHED TO BLDG CODE SPECIFICATIONS.Nothing owed — awaiting certificate of correction
ECB05/13/2008FAILURE TO MAINTAIN EXTERIOR BUILDING WALL - HAZARDOUS - NOTED: AT PARAPET LARGE CRACKS THROUGHOUT (@ EXPOSURE 1) REMEDY: MAINTAIN EXTERIOR BUILDING WALL.Nothing owed — awaiting certificate of correction
ECB06/27/1995EXIT DOOR TOTAL OBSTRUCTION 1ST <7 2ND FLOORS DOORS HAVE BEEN SEALED OFF WITH CONCRETE BLOCKS DOORS AT FIRST&SECOND FLOORS LEFT SIDE OF BUILDING.REMEDY REMOVE OBSTRUCTION IMMEDIATELY AND RESTORE TO PRIOR IEGALNothing owed — awaiting certificate of correction
ECB05/18/1995ALTERED BUILDING OCCUPIED WITH OUT A CERTIFICATE OF OCCUPANCY OCCUPANCY CHANGED FROM THEATRE TO FURNITURE STORAGE ALT #305/87 REMEDY OBTAIN A VALID CERTIFICATE OF OCCUPANCY IF FEASIBLE.Nothing owed — awaiting certificate of correction