← Back
Three families
298 EAST 151 STREET
BRONX · Melrose · BIN 2001831
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6Zoning
3,348 sfGross Floor Area
3Units
Rent Stabilized17 Open Violations 15 unresolved · 2 paperwork only ▸
Three families · Owner of record: 298 EAST 151ST STREET CORP · 3,019 sf lot · 1.11 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Roof37p · 2 filings · 20 docs
Floor 335p · 4 filings · 20 docs
Floor 235p · 4 filings · 20 docs
Floor 134p · 4 filings · 20 docs
Cellar38p · 4 filings · 20 docs
Site & exterior11p · 2 filings · 20 docs
Filed — no permit issued2p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
298 EAST 151ST STREET CORP103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/28/2023$1.3M—— → —$388/sf building
03/31/2021$294K—— → —$88/sf building
09/11/2018$400K—— → —$119/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BUILD TECH PROFESSIONAL CORP104/16/2025
PIROOZ ENGINEERING, P.C.811/28/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ROYAL T E1203/21/2026
BUILD-TECH PROFESSIONALS CORP.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRECISION HOME DEV INCGeneral Contractor707/08/2026
PARADISE COVE ENTERPRISEGeneral Contractor507/08/2026
DNA PLUMBING CONTR. INCFire Protection107/08/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PIROOZ ENGINEERING P.C7177711/28/2023
TRIANGLE INSPECTION & TES7495311/28/2023
Building Lifecycle
All (164)Filed (9)Permit Issued (8)Signed Off (5)Violation (60)Inspection (9)Objection (43)Special Inspection (30)
04/30/2026
Violation issued (HPD, open)
A
03/12/2026
Violation issued (ECB, open)
Construction
03/12/2026
Violation issued (ECB, open)
Construction
11/17/2025
Violation issued (HPD, open)
I
06/05/2025
Violation issued (HPD, open)
A
04/29/2025
Objection raised — Cost
04/16/2025
Filed — Alteration
REMOVING KITCHENETTE, INTERIOR PARTITIONS AND RESTORING CELLAR TO PRIOR LEGAL CONDITIONS.
X01211467-I1
08/26/2024
Violation issued (ECB, open)
Construction
08/26/2024
Violation issued (ECB, open)
Construction
08/26/2024
Violation issued (ECB, open)
Unknown
03/01/2024
Signed off — Alteration
EXISTING THREE STORY WITH CELLAR, 3 FAMILY BUILDING, PROPOSED INTERIOR RENOVATION AND HORIZONTAL EXTENSION AT REAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00561971-I1
01/30/2024
Signed off — Alteration
X00550226-I1
01/12/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/15/2023
Signed off — Alteration
X00550233-I1
12/14/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/07/2023
Signed off — Alteration
NEW PLUMBING SYSTEM TO BE INSTALLED IN CONJUNCTION WITH ALTERATION APPLICATION # X00561971
X00550210-I1
12/07/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/30/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PIROOZ SOLTANIZADEH
11/30/2023
Special inspection requirement — HVAC-R and service water heating system controls
PIROOZ SOLTANIZADEH
11/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
PIROOZ SOLTANIZADEH
11/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
11/30/2023
Special inspection requirement — Energy Code Compliance Inspections
PIROOZ SOLTANIZADEH
11/30/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
11/30/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PIROOZ SOLTANIZADEH
11/28/2023
Filed — Alteration
NEW PLUMBING SYSTEM TO BE INSTALLED IN CONJUNCTION WITH ALTERATION APPLICATION # X00561971
X00550210-P2
11/28/2023
Special inspection requirement — HVAC-R and service water heating system controls
PIROOZ SOLTANIZADEH
11/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
11/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PIROOZ SOLTANIZADEH
11/28/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
11/28/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PIROOZ SOLTANIZADEH
11/28/2023
Special inspection requirement — HVAC-R and service water heating equipment
PIROOZ SOLTANIZADEH
11/28/2023
Special inspection requirement — Energy Code Compliance Inspections
PIROOZ SOLTANIZADEH
11/17/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/09/2023
Filed — Alteration
NEW PLUMBING SYSTEM TO BE INSTALLED IN CONJUNCTION WITH ALTERATION APPLICATION # X00561971
X00550210-P1
11/08/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
11/08/2023
Special inspection requirement — HVAC-R and service water heating equipment
PIROOZ SOLTANIZADEH
11/08/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PIROOZ SOLTANIZADEH
11/08/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PIROOZ SOLTANIZADEH
11/08/2023
Special inspection requirement — Energy Code Compliance Inspections
PIROOZ SOLTANIZADEH
11/08/2023
Special inspection requirement — HVAC-R and service water heating system controls
PIROOZ SOLTANIZADEH
11/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
11/06/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/03/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/30/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/24/2023
Filed — Alteration
EXISTING THREE STORY WITH CELLAR, 3 FAMILY BUILDING, PROPOSED INTERIOR RENOVATION AND HORIZONTAL EXTENSION AT REAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00561971-P1
10/24/2023
Special inspection requirement — Preliminary
PIROOZ SOLTANIZADEH
10/24/2023
Special inspection requirement — Final
NAVEEN KUMAR
10/24/2023
Special inspection requirement — Fire-Resistance Rated Construction
PIROOZ SOLTANIZADEH
10/24/2023
Special inspection requirement — Masonry
PIROOZ SOLTANIZADEH
10/24/2023
Special inspection requirement — Subgrade Inspections
PIROOZ SOLTANIZADEH
10/24/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PIROOZ SOLTANIZADEH
10/24/2023
Special inspection requirement — Footing and Foundation
PIROOZ SOLTANIZADEH
10/24/2023
Special inspection requirement — Energy Code Compliance Inspections
PIROOZ SOLTANIZADEH
10/24/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
PIROOZ SOLTANIZADEH
10/15/2023
Violation issued (HPD, open)
C
10/15/2023
Violation issued (HPD, closed)
A
10/15/2023
Violation issued (HPD, closed)
A
10/15/2023
Violation issued (HPD, closed)
A
10/15/2023
Violation issued (HPD, open)
A
10/15/2023
Violation issued (HPD, closed)
A
Latest 60 of 164 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offPRECISION HOME DEV INC06/09/2023
DOB NOWSprinklersSigned-offDNA PLUMBING CONTR. INC05/12/2023
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP04/28/2023
DOB NOWEarth WorkSigned-offPRECISION HOME DEV INC04/21/2023
DOB NOWMechanical SystemsSigned-offPRECISION HOME DEV INC04/21/2023
DOB NOWEarth WorkSigned-offPARADISE COVE ENTERPRISE11/10/2022
DOB NOWMechanical SystemsSigned-offPARADISE COVE ENTERPRISE11/03/2022
DOB NOWConstruction FenceSigned-offPARADISE COVE ENTERPRISE11/01/2022
1 project · most recent 03/05/2023
General Wiring
FiledStatusContractorScope
03/05/2023CompleteC & A ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
01/12/2024Pass-Final General Construction Non-Directive 14PassView ↗
12/14/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/07/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/03/2023Fail-Final General Construction Non-Directive 14FailView ↗
10/30/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/08/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 90
DateRequirementInspectorRole
11/30/2023Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
11/30/2023HVAC-R and service water heating equipmentPIROOZ SOLTANIZADEHenergy_progress
11/30/2023HVAC-R and service water heating system controlsPIROOZ SOLTANIZADEHenergy_progress
11/30/2023HVAC-R and service water piping design and insulationPIROOZ SOLTANIZADEHenergy_progress
11/30/2023Energy Code Compliance InspectionsPIROOZ SOLTANIZADEHprogress
11/30/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
11/30/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
11/28/2023Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
11/28/2023HVAC-R and service water heating equipmentPIROOZ SOLTANIZADEHenergy_progress
11/28/2023HVAC-R and service water piping design and insulationPIROOZ SOLTANIZADEHenergy_progress
11/28/2023HVAC-R and service water heating system controlsPIROOZ SOLTANIZADEHenergy_progress
11/28/2023Energy Code Compliance InspectionsPIROOZ SOLTANIZADEHprogress
11/28/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
11/28/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
11/08/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
11/08/2023HVAC-R and service water piping design and insulationPIROOZ SOLTANIZADEHenergy_progress
11/08/2023HVAC-R and service water heating system controlsPIROOZ SOLTANIZADEHenergy_progress
11/08/2023HVAC-R and service water heating equipmentPIROOZ SOLTANIZADEHenergy_progress
11/08/2023Energy Code Compliance InspectionsPIROOZ SOLTANIZADEHprogress
11/08/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
11/08/2023Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
10/24/2023Air barrier — testing PIROOZ SOLTANIZADEHenergy_progress
10/24/2023Mechanical SystemsPIROOZ SOLTANIZADEHspecial
10/24/2023Excavations - Sheeting, Shoring, and BracingPIROOZ SOLTANIZADEHspecial
10/24/2023Concrete - Cast-In-PlacePIROOZ SOLTANIZADEHspecial
Latest 25 of 90.
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026X00561971-P1Request digital key ↗
08/25/2026X00550233-I1Request digital key ↗
08/24/2026X00560180-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026X00561971-P1Open ↗
08/13/2026X00561971-I1Open ↗
▸Seals & Professional Certifications43
▸DOB NOWProgress Inspector Seal & Signature23
08/30/2026X00561971-I1Open ↗
08/30/2026X00561971-I1Open ↗
08/30/2026X00561971-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
08/30/2026X00561971-I1Open ↗
08/30/2026X00561971-I1Open ↗
08/28/2026X00550210-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026X00560180-I1Open ↗
08/24/2026X00550226-I1Open ↗
08/13/2026X00550233-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026X00550226-I1Open ↗
08/13/2026X01211467-I1Open ↗
08/13/2026X00561971-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026X00550233-I1Open ↗
08/13/2026X00550210-I1Open ↗
08/13/2026X00561971-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026X00561971-P1Open ↗
08/13/2026X00561971-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X00561971-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026X00561971-I1Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertificate of Insurance1
08/13/2026X00561971-I1Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026X00561971-I1Open ↗
▸Other Documents6
▸DOB NOWSite Survey: Initial2
08/13/2026X00561971-P1Open ↗
08/13/2026X00561971-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026X00561971-I1Open ↗
08/13/2026X00561971-P1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026X00561971-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00561971-I1Open ↗