← Back
BuildNYC
Three families
298 EAST 151ST STREET
BRONX · BIN 2001831
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6Zoning
3,348 sfGross Floor Area
3Units
Rent Stabilized17 Active Violations 15 unresolved · 2 paperwork only ▸
Three families · Owner of record: 298 East 151st Street · 3,019 sf lot · 1.11 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHVAC and service water piping, first through third floors39p · 2 filings · 20 docs
Floor 3Sprinkler system installation and water service37p · 4 filings · 20 docs
Floor 2Sprinkler system installation and water service37p · 4 filings · 20 docs
Floor 1Sprinkler system installation and water service36p · 4 filings · 20 docs
CellarSprinkler system installation and water service40p · 5 filings · 20 docs
Site & exteriorHVAC and service water piping, first through third floors11p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
South Homes3007/08/2026
298 East 151st Street103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/28/2023$1.3M—— → —$388/sf building
03/31/2021$294K—— → —$88/sf building
09/11/2018$400K—— → —$119/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Build Tech Professional104/16/2025
Pirooz Engineering811/28/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Royal T&E1203/21/2026
Build-Tech Professionals103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Precision Home DevelopmentGeneral Contractor707/08/2026
Paradise Cove EnterpriseGeneral Contractor407/08/2026
Paradise Cove EnterpriseScaffold107/08/2026
DNA Plumbing ContractorsFire Protection107/08/2026
DPH Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Pirooz Engineering7177711/28/2023
Triangle Inspection & Tes7495311/28/2023
Building Lifecycle
All (164)Filed (9)Permit Issued (8)Signed Off (5)Violation (60)Inspection (9)Objection (43)Special Inspection (30)
04/30/2026
Violation issued (HPD, open)
A
03/12/2026
Violation issued (ECB, open)
Construction
03/12/2026
Violation issued (ECB, open)
Construction
11/17/2025
Violation issued (HPD, open)
I
06/05/2025
Violation issued (HPD, open)
A
04/29/2025
Objection raised — Cost
04/16/2025
Filed — Alteration
REMOVING KITCHENETTE, INTERIOR PARTITIONS AND RESTORING CELLAR TO PRIOR LEGAL CONDITIONS.
X01211467-I1
08/26/2024
Violation issued (ECB, open)
Unknown
08/26/2024
Violation issued (ECB, open)
Construction
08/26/2024
Violation issued (ECB, open)
Construction
03/01/2024
Signed off — Alteration
EXISTING THREE STORY WITH CELLAR, 3 FAMILY BUILDING, PROPOSED INTERIOR RENOVATION AND HORIZONTAL EXTENSION AT REAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00561971-I1
01/30/2024
Signed off — Alteration
X00550226-I1
01/12/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/15/2023
Signed off — Alteration
X00550233-I1
12/14/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/07/2023
Signed off — Alteration
NEW PLUMBING SYSTEM TO BE INSTALLED IN CONJUNCTION WITH ALTERATION APPLICATION # X00561971
X00550210-I1
12/07/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/30/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PIROOZ SOLTANIZADEH
11/30/2023
Special inspection requirement — HVAC-R and service water heating system controls
PIROOZ SOLTANIZADEH
11/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
PIROOZ SOLTANIZADEH
11/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
11/30/2023
Special inspection requirement — Energy Code Compliance Inspections
PIROOZ SOLTANIZADEH
11/30/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
11/30/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PIROOZ SOLTANIZADEH
11/28/2023
Filed — Alteration
NEW PLUMBING SYSTEM TO BE INSTALLED IN CONJUNCTION WITH ALTERATION APPLICATION # X00561971
X00550210-P2
11/28/2023
Special inspection requirement — HVAC-R and service water heating system controls
PIROOZ SOLTANIZADEH
11/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
11/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PIROOZ SOLTANIZADEH
11/28/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
11/28/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PIROOZ SOLTANIZADEH
11/28/2023
Special inspection requirement — HVAC-R and service water heating equipment
PIROOZ SOLTANIZADEH
11/28/2023
Special inspection requirement — Energy Code Compliance Inspections
PIROOZ SOLTANIZADEH
11/17/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/09/2023
Filed — Alteration
NEW PLUMBING SYSTEM TO BE INSTALLED IN CONJUNCTION WITH ALTERATION APPLICATION # X00561971
X00550210-P1
11/08/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
11/08/2023
Special inspection requirement — HVAC-R and service water heating equipment
PIROOZ SOLTANIZADEH
11/08/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PIROOZ SOLTANIZADEH
11/08/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PIROOZ SOLTANIZADEH
11/08/2023
Special inspection requirement — Energy Code Compliance Inspections
PIROOZ SOLTANIZADEH
11/08/2023
Special inspection requirement — HVAC-R and service water heating system controls
PIROOZ SOLTANIZADEH
11/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
11/06/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/03/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/30/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/24/2023
Filed — Alteration
EXISTING THREE STORY WITH CELLAR, 3 FAMILY BUILDING, PROPOSED INTERIOR RENOVATION AND HORIZONTAL EXTENSION AT REAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00561971-P1
10/24/2023
Special inspection requirement — Preliminary
PIROOZ SOLTANIZADEH
10/24/2023
Special inspection requirement — Final
NAVEEN KUMAR
10/24/2023
Special inspection requirement — Fire-Resistance Rated Construction
PIROOZ SOLTANIZADEH
10/24/2023
Special inspection requirement — Masonry
PIROOZ SOLTANIZADEH
10/24/2023
Special inspection requirement — Subgrade Inspections
PIROOZ SOLTANIZADEH
10/24/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PIROOZ SOLTANIZADEH
10/24/2023
Special inspection requirement — Footing and Foundation
PIROOZ SOLTANIZADEH
10/24/2023
Special inspection requirement — Energy Code Compliance Inspections
PIROOZ SOLTANIZADEH
10/24/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
PIROOZ SOLTANIZADEH
10/15/2023
Violation issued (HPD, closed)
A
10/15/2023
Violation issued (HPD, closed)
A
10/15/2023
Violation issued (HPD, open)
A
10/15/2023
Violation issued (HPD, closed)
A
10/15/2023
Violation issued (HPD, closed)
A
10/15/2023
Violation issued (HPD, open)
C
Latest 60 of 164 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offPrecision Home Development06/09/2023
DOB NOWSprinklersSigned-offDNA Plumbing Contracting05/12/2023
DOB NOWPlumbingSigned-offDPH Plumbing & Heating04/28/2023
DOB NOWMechanical SystemsSigned-offPrecision Home Development04/21/2023
DOB NOWGeneral ConstructionSigned-offPrecision Home Development04/21/2023
DOB NOWGeneral ConstructionSigned-offParadise Cove Enterprise11/10/2022
DOB NOWMechanical SystemsSigned-offParadise Cove Enterprise11/03/2022
DOB NOWConstruction FenceSigned-offParadise Cove Enterprise11/01/2022
1 project · most recent 03/05/2023
General Wiring
FiledStatusContractorScope
03/05/2023CompleteC & A ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
01/12/2024Pass-Final General Construction Non-Directive 14PassView ↗
12/14/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/07/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/03/2023Fail-Final General Construction Non-Directive 14FailView ↗
10/30/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/08/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 90
DateRequirementInspectorRole
11/30/2023Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
11/30/2023HVAC-R and service water heating equipmentPIROOZ SOLTANIZADEHenergy_progress
11/30/2023HVAC-R and service water heating system controlsPIROOZ SOLTANIZADEHenergy_progress
11/30/2023HVAC-R and service water piping design and insulationPIROOZ SOLTANIZADEHenergy_progress
11/30/2023Energy Code Compliance InspectionsPIROOZ SOLTANIZADEHprogress
11/30/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
11/30/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
11/28/2023Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
11/28/2023HVAC-R and service water heating equipmentPIROOZ SOLTANIZADEHenergy_progress
11/28/2023HVAC-R and service water piping design and insulationPIROOZ SOLTANIZADEHenergy_progress
11/28/2023HVAC-R and service water heating system controlsPIROOZ SOLTANIZADEHenergy_progress
11/28/2023Energy Code Compliance InspectionsPIROOZ SOLTANIZADEHprogress
11/28/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
11/28/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
11/08/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
11/08/2023HVAC-R and service water piping design and insulationPIROOZ SOLTANIZADEHenergy_progress
11/08/2023HVAC-R and service water heating system controlsPIROOZ SOLTANIZADEHenergy_progress
11/08/2023HVAC-R and service water heating equipmentPIROOZ SOLTANIZADEHenergy_progress
11/08/2023Energy Code Compliance InspectionsPIROOZ SOLTANIZADEHprogress
11/08/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
11/08/2023Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
10/24/2023Air barrier — testing PIROOZ SOLTANIZADEHenergy_progress
10/24/2023Mechanical SystemsPIROOZ SOLTANIZADEHspecial
10/24/2023Excavations - Sheeting, Shoring, and BracingPIROOZ SOLTANIZADEHspecial
10/24/2023Concrete - Cast-In-PlacePIROOZ SOLTANIZADEHspecial
Latest 25 of 90.
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026X00561971-P1Request digital key ↗
08/25/2026X00550233-I1Request digital key ↗
08/24/2026X00560180-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026X00561971-P1Open ↗
08/13/2026X00561971-I1Open ↗
▸Seals & Professional Certifications43
▸DOB NOWProgress Inspector Seal & Signature23
08/30/2026X00561971-I1Open ↗
08/30/2026X00561971-I1Open ↗
08/30/2026X00561971-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
08/30/2026X00561971-I1Open ↗
08/30/2026X00561971-I1Open ↗
08/28/2026X00550210-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026X00560180-I1Open ↗
08/24/2026X00550226-I1Open ↗
08/13/2026X00550233-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026X00550226-I1Open ↗
08/13/2026X01211467-I1Open ↗
08/13/2026X00561971-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026X00550233-I1Open ↗
08/13/2026X00550210-I1Open ↗
08/13/2026X00561971-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026X00561971-P1Open ↗
08/13/2026X00561971-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X00561971-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026X00561971-I1Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertificate of Insurance1
08/13/2026X00561971-I1Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026X00561971-I1Open ↗
▸Other Documents6
▸DOB NOWSite Survey: Initial2
08/13/2026X00561971-P1Open ↗
08/13/2026X00561971-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026X00561971-I1Open ↗
08/13/2026X00561971-P1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026X00561971-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00561971-I1Open ↗