| Owner | Filings | Most Recent |
|---|---|---|
| 2980 RICHMOND TERRACE | 30 | 09/13/2026 |
| 4 AVE GORD SENIOR CENTER | 4 | 07/08/2026 |
| 298 RICHMOND TERRACE LLC | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| TL ENGINEERING, PC | 11 | 04/16/2026 |
| SOYU ARCHITECTURE, INC. | 1 | 06/26/2018 |
| JUNG H. CHOI, ARCHITECT, PC | 1 | 04/19/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| C PLUS DESIGN GROUP | 2 | 03/21/2026 |
| YOUN DESIGN CORP | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| HD HVAC OF NY INC | General Contractor | 8 | 03/21/2026 |
| NEPTUNE SIGNS AWNINGS | Scaffold | 2 | 07/08/2026 |
| JONG HYUN KIM | Electrical | 1 | 03/22/2026 |
| XH&RC PLBG AND HTG INC | Fire Protection | 1 | 07/08/2026 |
| DOMUS DESIGN INC | General Contractor | 1 | 04/09/2026 |
| XH&RC PLBG AND HTG INC | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| TL ENGINEERING, PC | 1222 | 6 | 04/16/2026 |
| SEAD ENGINEERING PC | 2665 | 1 | 06/26/2018 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Signed-off | DOMUS DESIGN INC | 03/23/2026 |
| DOB NOW | Structural | Permit Issued | HD HVAC OF NY INC | 06/26/2024 |
| DOB NOW | General Construction | Permit Issued | HD HVAC OF NY INC | 06/21/2024 |
| DOB NOW | Mechanical Systems | Signed-off | HD HVAC OF NY INC | 04/24/2024 |
| DOB NOW | Sprinklers | Signed-off | XH&RC PLBG AND HTG INC | 02/23/2024 |
| DOB NOW | Plumbing | Signed-off | XH&RC PLBG AND HTG INC | 02/23/2024 |
| DOB NOW | General Construction | Permit Issued | HD HVAC OF NY INC | 09/29/2023 |
| DOB NOW | Sign | Signed-off | NEPTUNE SIGNS&AWNINGS INC | 05/01/2019 |
| DOB NOW | Sign | Signed-off | NEPTUNE SIGNS&AWNINGS INC | 04/27/2018 |
| BIS | SP | ISSUED | WALTER J. GRANDE P&H INC. | 08/16/2018 |
| BIS | FP | ISSUED | ALLIED FIRE CONTROL SVCS | 08/02/2018 |
| BIS | OT | ISSUED | YOUN DESIGN CORP | 05/03/2018 |
| BIS | — | ISSUED | HONGTAI CONSTRUCTION INC | 04/30/2018 |
| BIS | EQ | ISSUED | HONGTAI CONSTRUCTION INC | 04/30/2018 |
| BIS | PL | ISSUED | KCM PLUMBING & HEATING CO | 04/03/2018 |
| BIS | MH | ISSUED | HONGTAI CONSTRUCTION INC | 03/27/2018 |
| BIS | PL | ISSUED | SO PLUMBING & HEATING INC | 11/21/2017 |
| BIS | — | ISSUED | HONGTAI CONSTRUCTION INC | 11/14/2017 |
| BIS | EQ | ISSUED | HONGTAI CONSTRUCTION INC | 10/23/2017 |
| BIS | PL | ISSUED | SO PLUMBING & HEATING INC | 09/16/2016 |
| BIS | EQ | ISSUED | HAPPY GARDEN CONSTR. CORP | 08/04/2016 |
| BIS | — | ISSUED | HAPPY GARDEN CONSTR. CORP | 08/04/2016 |
| BIS | PL | ISSUED | WALTER J.GRANDE P & H INC | 10/07/1999 |
| BIS | MH | ISSUED | MUNICIPAL BUILDING CONSULTANTS | 10/06/1999 |
| BIS | MH | ISSUED | SCRAN | 01/23/1992 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/19/2024 | Complete | JONG HYUN KIM | General Wiring |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/08/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 04/10/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/08/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/23/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/18/2024 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 03/18/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/18/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 03/13/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/04/2026 | Subgrade Inspections | Simon Lee | special |
| 05/04/2026 | Lighting controls | Simon Lee | energy_progress |
| 05/04/2026 | Fenestration and door U-factor and product ratings | Simon Lee | energy_progress |
| 05/04/2026 | Fenestration areas | Simon Lee | energy_progress |
| 05/04/2026 | Air barrier - visual inspection | Simon Lee | energy_progress |
| 05/04/2026 | Interior lighting power | Simon Lee | energy_progress |
| 05/04/2026 | Insulation placement and R values | Simon Lee | energy_progress |
| 05/04/2026 | Fenestration air leakage | Simon Lee | energy_progress |
| 05/04/2026 | Lowest Floor Elevation | Simon Lee | progress |
| 05/04/2026 | Final | Simon Lee | progress |
| 05/04/2026 | Fire-Resistance Rated Construction | Simon Lee | progress |
| 05/04/2026 | Excavations - Sheeting, Shoring, and Bracing | Simon Lee | special |
| 05/04/2026 | Structural Steel - Details | Simon Lee | special |
| 05/04/2026 | Fire-Resistant Penetrations and Joints | Simon Lee | special |
| 05/04/2026 | Concrete - Cast-In-Place | Simon Lee | special |
| 05/04/2026 | Structural Steel - High Strength Bolting | Simon Lee | special |
| 05/04/2026 | Masonry | Simon Lee | special |
| 05/04/2026 | Structural Cold-Formed Steel | Simon Lee | special |
| 05/04/2026 | Structural Stability – Alterations of existing buildings | Simon Lee | special |
| 04/15/2026 | Concrete - Cast-In-Place | Simon Lee | special |
| 04/15/2026 | Excavations - Sheeting, Shoring, and Bracing | Simon Lee | special |
| 04/15/2026 | Fire-Resistant Penetrations and Joints | Simon Lee | special |
| 04/15/2026 | Masonry | Simon Lee | special |
| 04/15/2026 | Structural Cold-Formed Steel | Simon Lee | special |
| 04/15/2026 | Structural Stability – Alterations of existing buildings | Simon Lee | special |