← Back
Elevator cooperative
295 RIVERSIDE DRIVE
MANHATTAN · BIN 1057167
💬 Discuss this project
1911Year Built
12Stories
D4Building Class
R8Zoning
94,804 sfGross Floor Area
57Units
LL97 CoveredRent Stabilized15 Open Violations 14 unresolved · 1 paperwork only ▸FISP: SWARMP
Elevator cooperative · Owner of record: 299 OWNERS CORP · 9,086 sf lot · 10.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof3p · 2 filings · 13 docs
Floor 71p · 1 filing · 16 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Cellar1 filing · 8 docs
2 jobs · most recent 01/23/2025
Gas Water/Sanitary
FiledStatusContractorScope
01/23/2025Signed-offNATIONWIDE MECHANICAL INCGas, Water/Sanitary
10/26/2021Permit IssuedLCS PLUMBING&CONSULT INCGas, Water/Sanitary
8 jobs · most recent 07/30/2026
General Wiring
FiledStatusContractorScope
07/30/2026CompleteSAMMY ELECTRIC SVCS CORP—
09/10/2025CompleteROMCON ELECTRIC, INCGeneral Wiring
08/20/2025CompleteINFINITI ELECTRIC CORPGeneral Wiring
04/26/2022Permit IssuedRICHARD NEU—
07/10/2021CompleteTM SELECT ELECTRIC CORPGeneral Wiring
12/09/2020CompleteE & M ELECTRICAL NY CORPGeneral Wiring
06/17/2020CompleteW 8 ELECTRIC CORPGeneral Wiring
04/04/2018CompleteTOWER ELECTRIC INC.—
2 jobs · most recent 06/30/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
06/30/2025Permit IssuedOSMANI NYC INCSuspended Scaffold (SC)
08/29/2024Permit Issued—Suspended Scaffold (SC)
Building Lifecycle
All (154)Filed (19)Permit Issued (25)Signed Off (10)Facade (FISP) (15)Violation (60)Inspection (6)Special Inspection (19)
07/09/2026
Signed off — Alteration
Filing to patch, repair, replace facade surfaces as per plans. No change in use, egress, or occupancy under this application.
M00585825-I1
05/15/2026
Signed off — Alteration
Plumbing work of the apartment 7D on the 7th floor. No change in use, egress, or occupancy
M01189262-I1
05/15/2026
Signed off — Alteration
Plumbing work of the apartment 7D on the 7th floor. No change in use, egress, or occupancy
M01189262-S1
04/23/2026
Permit issued — General Construction
M01189262-I1-GC
01/28/2026
Signed off — Alteration
REMOVALS OF EXISTING ROOFING AND ROOF INSULATION. ROOFING REPLACEMENT WITH 3-PLY SBS ROOFING WITH NEW RIGID INSULATION. NO CHANGE TO USE EGRESS OR OCCUPANCY.
M01249156-I1
12/03/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/26/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/12/2025
Permit issued — Plumbing
M01189262-S1-PL
09/10/2025
Permit issued — General Construction
M01249156-I1-GC
07/11/2025
Filed — Alteration
REMOVALS OF EXISTING ROOFING AND ROOF INSULATION. ROOFING REPLACEMENT WITH 3-PLY SBS ROOFING WITH NEW RIGID INSULATION. NO CHANGE TO USE EGRESS OR OCCUPANCY.
M01249156-I1
07/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
CLOUD LEE
07/02/2025
Permit issued — General Construction
M01189262-I1-GC
07/02/2025
Permit issued — Suspended Scaffold
M01248673-I1-SC
06/30/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT (MATERIAL HOIST - COUNTERWEIGHTED SYSTEM).
M01248673-I1
06/30/2025
Special inspection requirement — Final
Michael Notaro
06/30/2025
Special inspection requirement — Preliminary
Michael Notaro
06/30/2025
Special inspection requirement — Insulation placement and R values
Michael Notaro
06/10/2025
Filed — Alteration
Plumbing work of the apartment 7D on the 7th floor. No change in use, egress, or occupancy
M01189262-I1
06/10/2025
Filed — Alteration
Plumbing work of the apartment 7D on the 7th floor. No change in use, egress, or occupancy
M01189262-S1
06/04/2025
Violation issued (HPD, closed)
A
06/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL HOUSE
03/31/2025
Signed off — Alteration
ALTERATIONS TO RESIDENTIAL COOP UNIT #7A, 7TH FLOOR INCLUDING NON-BEARING PARTITIONS AND GENERAL RENOVATIONS. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
M00938571-I1
03/31/2025
Signed off — Alteration
ALTERATIONS TO RESIDENTIAL COOP UNIT #7A, 7TH FLOOR INCLUDING NON-BEARING PARTITIONS AND GENERAL RENOVATIONS. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
M00938571-S2
03/21/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/03/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/10/2025
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
01/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
VICTOR RUIZ
01/23/2025
Filed — Alteration
ALTERATIONS TO RESIDENTIAL COOP UNIT #7A, 7TH FLOOR INCLUDING NON-BEARING PARTITIONS AND GENERAL RENOVATIONS. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
M00938571-P1
01/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
VICTOR RUIZ
01/21/2025
Permit issued — Plumbing
M00938571-S2-PL
11/22/2024
Violation issued (HPD, closed)
I
11/01/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00768818-I1
10/08/2024
Permit issued — General Construction
M00585825-I1-GC
09/27/2024
Cycle 9 facade report signed — SWARMP
09/26/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/03/2024
Permit issued — Suspended Scaffold
M01103740-I1-SC
08/30/2024
Cycle 9 facade report submitted
08/29/2024
Filed — Alteration
renewal of SR23-0998 only
M01103740-I1
08/26/2024
Cycle 9 facade inspection completed
07/31/2024
Filed — Alteration
M01031083-I1
07/08/2024
Permit issued — Plumbing
M00938571-S2-PL
07/05/2024
Permit issued — General Construction
M00938571-I1-GC
06/24/2024
Filed — Alteration
ALTERATIONS TO RESIDENTIAL COOP UNIT #7A, 7TH FLOOR INCLUDING NON-BEARING PARTITIONS AND GENERAL RENOVATIONS. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
M00938571-I1
06/24/2024
Filed — Alteration
ALTERATIONS TO RESIDENTIAL COOP UNIT #7A, 7TH FLOOR INCLUDING NON-BEARING PARTITIONS AND GENERAL RENOVATIONS. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
M00938571-S2
05/15/2024
Permit issued — Sidewalk Shed
M00768818-I1-SH
05/13/2024
Permit issued — General Construction
M00585825-I1-GC
11/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
VICTOR RUIZ
09/08/2023
Permit issued — General Construction
M00585825-I1-GC
05/15/2023
Permit issued — Sidewalk Shed
M00768818-I1-SH
05/08/2023
Filed — Alteration
Filing to patch, repair, replace facade surfaces as per plans. No change in use, egress, or occupancy under this application.
M00585825-P1
05/08/2023
Special inspection requirement — Final
RICHARD LEFEVER
05/08/2023
Special inspection requirement — Post-installed Anchors
Chester Kowalski
05/08/2023
Special inspection requirement — Masonry
Chester Kowalski
04/18/2023
Violation issued (HPD, closed)
C
03/20/2023
Permit issued — General Construction
M00585825-I1-GC
02/10/2023
Cycle 9 facade report submitted
02/10/2023
Cycle 9 facade report signed — UNSAFE
Latest 60 of 154 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ALL EMPIRE BUILDING CONTRACTORS1207/08/2026
BLUE WOODS MANAGEMENT1107/08/2026
XINOS CONSTRUCTION1307/08/2026
HELLER REALTY503/22/2026
299 OWNERS6603/22/2026
OWNER OF 299 RIVERSIDE DR403/22/2026
299 OWNER CORP303/22/2026
DAVID EISENSTEIN REALTY303/22/2026
STEEL SYSTEMS LLC103/21/2026
299OWNERSCORPC OBLUEWOODSMGMT403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HS DESIGN STUDIO203/21/2026
SOMMA DESIGN CONSULTING203/21/2026
GREEN LIGHT EXPEDITING LLC603/21/2026
NEXUS CONSULTING NYC, INC403/21/2026
SHEIKH EXPEDITING203/21/2026
HIERARCH-E203/21/2026
NEW YORK ENGINEERING ASSOCIATES P203/21/2026
GARY H SILVER ARCHITECTS PC603/21/2026
OUTHERE SPACE103/21/2026
XINOS CONSTRUCTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DAVE RESTORATION INCGeneral Contractor1207/08/2026
ALL EMPIRE BUILDING CONGeneral Contractor1007/08/2026
XINOS CONSTRUCTION CORPGeneral Contractor407/08/2026
LUCAS CONSTRUCTION NY INCGeneral Contractor407/08/2026
NATIONWIDE MECHANICAL INCPlumbing207/08/2026
MATSIKAS VASILIOSElectrical203/21/2026
VASILIOS MATSIKASElectrical203/21/2026
BONILLA & SONS INCGeneral Contractor203/21/2026
MOORE, JOHNElectrical103/21/2026
NEIL CABERAElectrical103/21/2026
VAN VASSELLElectrical103/21/2026
M C M PLBG & HTG, INCPlumbing107/08/2026
INFINITI ELECTRIC CORPElectrical103/22/2026
APPOLINAIRE LAUTUREElectrical103/21/2026
DREW ROMANELLOElectrical103/21/2026
DUMANI CONSTRUCTION INCGeneral Contractor104/09/2026
DOROWSKY, HARRYElectrical103/21/2026
CHARLES, ANDELLElectrical103/21/2026
AP PLUMBING & HVAC LLCPlumbing107/08/2026
GENESIS PLBG AND HTG CORPPlumbing107/08/2026
JEROME KRITZElectrical103/21/2026
JOHN MOOREElectrical103/21/2026
LCS PLUMBING&CONSULT INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MUNICIPAL TESTING LABORAT230107/11/2025
MICHAEL HOUSE ARCHITECT,7910206/10/2025
VICTOR RUIZ ARCHITECTURE,5884401/23/2025
SAG ENGINEERING & CONSULT608205/08/2023
MUNYC ARCHITECTURE PLLC5224103/10/2020
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offLUCAS CONSTRUCTION NY INC04/23/2026
DOB NOWPlumbingSigned-offGENESIS PLBG AND HTG CORP09/12/2025
DOB NOWGeneral ConstructionSigned-offDUMANI CONSTRUCTION INC09/10/2025
DOB NOWGeneral ConstructionSigned-offLUCAS CONSTRUCTION NY INC07/02/2025
DOB NOWSuspended ScaffoldPermit IssuedOSMANI NYC INC07/02/2025
DOB NOWPlumbingSigned-offNATIONWIDE MECHANICAL INC01/21/2025
DOB NOWGeneral ConstructionSigned-offDAVE RESTORATION INC10/08/2024
DOB NOWSuspended ScaffoldPermit IssuedMARKIE CONSTRUCTION INC09/03/2024
DOB NOWPlumbingSigned-offNATIONWIDE MECHANICAL INC07/08/2024
DOB NOWGeneral ConstructionSigned-offBONILLA SONS07/05/2024
DOB NOWSidewalk ShedSigned-offALL EMPIRE BUILDING CON05/15/2024
DOB NOWGeneral ConstructionSigned-offDAVE RESTORATION INC05/13/2024
DOB NOWGeneral ConstructionSigned-offDAVE RESTORATION INC09/08/2023
DOB NOWSidewalk ShedSigned-offALL EMPIRE BUILDING CON05/15/2023
DOB NOWGeneral ConstructionSigned-offDAVE RESTORATION INC03/20/2023
DOB NOWGeneral ConstructionSigned-offDAVE RESTORATION INC11/22/2022
DOB NOWGeneral ConstructionSigned-offDAVE RESTORATION INC09/01/2022
DOB NOWSidewalk ShedSigned-offALL EMPIRE BUILDING CON07/15/2022
DOB NOWSidewalk ShedPermit IssuedALL EMPIRE BUILDING CON05/13/2022
DOB NOWPlumbingPermit IssuedATTENTION TO DETAIL P&H.I11/10/2021
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG11/30/2020
DOB NOWPlumbingSigned-offM C M PLBG & HTG, INC09/21/2020
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP05/24/2019
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP02/14/2019
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP04/06/2018
BISOTISSUEDBLUETEC CABINETRY LTD07/12/2021
BISOTISSUEDMK CONSTRUCTION GROUP11/24/2020
BISOTISSUEDBLUETEC CABINETRY LTD09/17/2020
BISOTISSUEDXINOS CONSTRUCTION CORP06/12/2018
BISPLISSUEDTOP DOG PLBG & HTG CORP08/04/2017
BISOTISSUEDASKI CONSTRUCTION CORP06/20/2017
BISOTISSUEDASKI CONSTRUCTION CORP06/12/2017
BISFBISSUEDMICHAEL S. KAPLAN12/24/2016
BISPLISSUEDDUAL FUEL PLUBING & HTING11/23/2016
BISPLISSUEDDONATO PLUMBING GROUP INC07/18/2016
BISOTISSUEDBEN KRUPINSKI GEN CONT IN06/09/2016
BISMHISSUEDBEN KRUPINSKI GEN CONT IN06/09/2016
BISFBISSUEDMICHAEL S. KAPLAN10/05/2015
BISPLISSUEDDUAL FUEL PLUBING & HTING10/05/2015
BISOTISSUEDXINOS CONSTRUCTION CORP03/13/2014
+ 35 more permits on file
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/26/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/03/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/10/2025Fail-Final PL - Up to 9 Requested FloorsFailView ↗
09/26/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
07/08/2025Tenant Protection Plan ComplianceCLOUD LEEspecial
06/30/2025FinalMichael Notaroprogress
06/30/2025PreliminaryMichael Notaroprogress
06/30/2025Insulation placement and R valuesMichael Notaroenergy_progress
06/02/2025Fire-Resistant Penetrations and JointsMICHAEL HOUSEspecial
01/28/2025Fire-Resistant Penetrations and JointsVICTOR RUIZspecial
01/22/2025Fire-Resistant Penetrations and JointsVICTOR RUIZspecial
09/23/2023Fire-Resistant Penetrations and JointsVICTOR RUIZspecial
05/08/2023FinalRICHARD LEFEVERprogress
05/08/2023Post-installed AnchorsChester Kowalskispecial
05/08/2023MasonryChester Kowalskispecial
10/08/2021HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
10/08/2021Maintenance informationLOUIS ARENAenergy_progress
10/08/2021HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
10/08/2021HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
10/08/2021Energy Code Compliance InspectionsLOUIS ARENAprogress
05/05/2021Electrical energy consumptionGary Silverenergy_progress
01/20/2021Electrical energy consumptionGary Silverenergy_progress
02/13/2020Fire-Resistant Penetrations and JointsMatthias Muellerspecial
▾Documents — 380 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch15
09/06/2026M00033002-I1Contact architect ↗
09/03/2026M00608571-I1Contact architect ↗
09/02/2026M00724580-I1Contact architect ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/05/2026M00313042-I1Contact architect ↗
09/03/2026M00397770-I1Contact architect ↗
08/15/2026M00397770-P2Contact architect ↗
Showing 3 of 4 on file for this type
▸Applications & Permits75
▸BISPLAN / WORK APPROVAL APPLICATION33
11/05/2020140952976Open ↗
10/15/2020140952976Open ↗
09/17/2020140952976Open ↗
Showing 3 of 33 on file for this type
▸BISWORK PERMIT APPLICATION29
11/24/2020140952976Open ↗
09/18/2020123728813Open ↗
10/23/2019122729805Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWLPC Approval/Permit13
08/23/2026M01189262-S1Open ↗
08/13/2026M00397770-P1Open ↗
08/13/2026M00397770-I1Open ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications89
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION32
03/03/2020123728813Open ↗
03/03/2020123728813Open ↗
10/30/2019122729805Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/06/2026M00033002-I1Open ↗
09/02/2026M00724580-I1Open ↗
09/02/2026M00768818-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026M00608571-I1Open ↗
09/01/2026M00608571-I1Open ↗
09/01/2026M00608571-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/30/2026M00938571-P1Open ↗
08/28/2026M01249156-I1Open ↗
08/26/2026M01189262-S1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
09/17/2020140952976Open ↗
06/06/2018123238184Open ↗
05/22/2017140646353Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
06/13/2018123238184Open ↗
03/19/2014121940971Open ↗
03/19/2014121940962Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
09/17/2020140952976Open ↗
05/22/2017140646353Open ↗
10/02/2015140410614Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
09/17/2020140952976Open ↗
05/22/2017140646353Open ↗
10/02/2015140410614Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
09/17/2020140952976Open ↗
09/17/2020140952976Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/08/2012121066988Open ↗
▸Trade Schedules & Equipment21
▸BISSCHEDULE B - PLUMBING10
05/22/2017140646353Open ↗
10/02/2015140410614Open ↗
Showing 2 of 10 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
06/22/2018140646353Open ↗
06/14/2018140646353Open ↗
04/28/2016122729805Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
06/29/2021140952976Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
06/29/2021140952976Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
10/02/2015140410614Open ↗
▸Safety & Tenant Protection10
▸BISTenant Protection Plan and Notes6
03/13/2020123728813Open ↗
03/03/2020123728813Open ↗
06/06/2018123238184Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTenant Protection Plan4
08/13/2026M00313042-I1Open ↗
08/13/2026M00397770-P2Open ↗
08/13/2026M00397770-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos32
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/27/2026M00938571-P1Open ↗
08/27/2026M00938571-S2Open ↗
08/27/2026M00938571-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'9
05/08/2012121066988Open ↗
04/12/2012121044707Open ↗
Showing 2 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
09/17/2020140952976Open ↗
03/03/2020123728813Open ↗
06/13/2018123238184Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/31/2026M00585825-I1Open ↗
08/26/2026M01031083-I1Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
03/19/2014121940962Open ↗
▸Energy Compliance23
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
03/03/2020123728813Open ↗
10/30/2019122729805Open ↗
06/06/2018123238184Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
10/05/2021123728813Open ↗
09/17/2020140952976Open ↗
09/12/2020123728813Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
10/30/2019122729805Open ↗
07/06/2018140646353Open ↗
07/06/2017140410614Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
05/22/2017140646353Open ↗
10/02/2015140410614Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/05/2021123728813Open ↗
▸BISTR8: Energy Code Progress Inspections1
05/01/2012121044707Open ↗
▸BISNYCECC EXEMPTION1
09/17/2020140952976Open ↗
▸BISTECHNICAL REPORT: ENERGY1
05/08/2012121066988Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00397770-I1Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY6
10/05/2021123728813Open ↗
10/05/2021123728813Open ↗
06/28/2021140952976Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
07/06/2018140646353Open ↗
▸Approvals, Objections & Sign-offs38
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
10/05/2021123728813Open ↗
06/29/2021140952976Open ↗
10/30/2019122729805Open ↗
Showing 3 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
10/02/2012121386017Open ↗
05/08/2012121066988Open ↗
Showing 2 of 11 on file for this type
▸BISLANDMARKS APPROVAL8
09/17/2020140952976Open ↗
03/13/2020123728813Open ↗
08/21/2019122729805Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
10/15/2019122729805Open ↗
10/15/2019122729805Open ↗
07/06/2018140646353Open ↗
Showing 3 of 4 on file for this type
▸BISLANDMARKS SIGNOFF1
10/05/2021123728813Open ↗
▸Cost, Insurance & Ownership26
▸BISCOST AFFIDAVIT24
10/05/2021123728813Open ↗
09/17/2020140952976Open ↗
03/03/2020123728813Open ↗
Showing 3 of 24 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
06/14/2016122729805Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
06/28/2021140952976Open ↗
▸Filing & Intake Forms30
▸BISEFILING COVER SHEET12
03/03/2020123728813Open ↗
06/06/2018123238184Open ↗
04/28/2016122729805Open ↗
Showing 3 of 12 on file for this type
▸BISBOROUGH INTAKE FORM9
10/30/2019122729805Open ↗
10/11/2019122729805Open ↗
10/08/2019122729805Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION5
09/17/2020140952976Open ↗
03/13/2020123728813Open ↗
08/21/2019122729805Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
09/17/2020140952976Open ↗
05/22/2017140646353Open ↗
10/02/2015140410614Open ↗
Showing 3 of 4 on file for this type
▸Other Documents10
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
07/06/2017140410614Open ↗
05/11/2012121066988Open ↗
05/08/2012121066988Open ↗
▸DOB NOWDHCR Document2
08/13/2026M00397770-P2Open ↗
08/13/2026M00313042-I1Open ↗
▸DOB NOWCalculations2
08/13/2026M01248673-I1Open ↗
08/13/2026M01103740-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M01248673-I1Open ↗
08/13/2026M01103740-I1Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026M00033002-I1Open ↗